Volumn 125, Issue 3, 1999, Pages 151-160

WorkPlan: Constraint-based database for work package scheduling

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRAINT THEORY; CRITICAL PATH ANALYSIS; DATABASE SYSTEMS; JOB ANALYSIS; RESOURCE ALLOCATION;

EID: 0032667279     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:3(151)     Document Type: Article
Times cited : (95)

References (20)
  • 1
    • 0013115080 scopus 로고    scopus 로고
    • A. A. Balkema, Rotterdam, The Netherlands
    • Alarcon, L., ed. (1997). Lean construction. A. A. Balkema, Rotterdam, The Netherlands, 497.
    • (1997) Lean Construction , pp. 497
    • Alarcon, L.1
  • 2
    • 2342418968 scopus 로고
    • Implementing lean construction: Stabilizing work flow
    • Pontificia Universidad Catolica de Chile, Santiago, Chili, Sept., Reprinted in Alarcon (1997)
    • Ballard, G., and Howell, G. (1994a). "Implementing lean construction: Stabilizing work flow." Proc., 2nd Annu. Conf, on Lean Constr., Pontificia Universidad Catolica de Chile, Santiago, Chili, Sept., http:// www.vtt.fi/rte/lean/santiago.htm. Reprinted in Alarcon (1997).
    • (1994) Proc., 2nd Annu. Conf, on Lean Constr.
    • Ballard, G.1    Howell, G.2
  • 3
    • 12444343674 scopus 로고
    • Implementing lean construction: Improving downstream performance
    • Pontificia Universidad Catolica de Chile, Santiago, Chili, Sept., Reprinted in Alarcon (1997)
    • Ballard, G., and Howell, G. (1994b). "Implementing lean construction: Improving downstream performance." Proc., 2nd Annu. Conf. on Lean Constr., Pontificia Universidad Catolica de Chile, Santiago, Chili, Sept., http://www.vtt.fi/rte/lean/santiago.htm. Reprinted in Alarcon (1997).
    • (1994) Proc., 2nd Annu. Conf. on Lean Constr.
    • Ballard, G.1    Howell, G.2
  • 4
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: An essential step in production control
    • ASCE
    • Ballard, G., and Howell, G. (1998). "Shielding production: An essential step in production control." J. Constr. Engrg. and Mgmt., ASCE, 124(1), 18-24.
    • (1998) J. Constr. Engrg. and Mgmt. , vol.124 , Issue.1 , pp. 18-24
    • Ballard, G.1    Howell, G.2
  • 5
    • 0344494300 scopus 로고    scopus 로고
    • Primavera Systems Inc., Bala Cynwyd, Pa.
    • Expedition 5.1. (1997). Primavera Systems Inc., Bala Cynwyd, Pa.
    • (1997) Expedition 5.1
  • 6
    • 0344494298 scopus 로고    scopus 로고
    • Internal publication by Brown & Root, Inc., supporting the Last Planner initiative. Houston, Tex.
    • Goyen, J., and Ballard, G. (1996). Internal publication by Brown & Root, Inc., supporting the Last Planner initiative. Houston, Tex.
    • (1996)
    • Goyen, J.1    Ballard, G.2
  • 8
    • 0001167750 scopus 로고
    • Reengineering work: Don't automate, obliterate
    • July-August
    • Hammer, M. (1990). "Reengineering work: Don't automate, obliterate." Harvard Business Rev., July-August, 104-112.
    • (1990) Harvard Business Rev. , pp. 104-112
    • Hammer, M.1
  • 9
    • 37249012222 scopus 로고
    • Lean production theory: Moving beyond 'can-do'
    • Pontificia Universidad Catolica de Chile, Santiago, Chile, Sept., Reprinted in Alarcon (1997)
    • Howell, G., and Ballard, G. (1994). "Lean production theory: Moving beyond 'can-do'." Proc., 2nd Annu. Conf. on Lean Constr., Pontificia Universidad Catolica de Chile, Santiago, Chile, Sept., http://www.vtt.fi/ rte/lean/santiago.htm. Reprinted in Alarcon (1997).
    • (1994) Proc., 2nd Annu. Conf. on Lean Constr.
    • Howell, G.1    Ballard, G.2
  • 10
    • 0029414342 scopus 로고
    • Work-package - Process model for piping construction
    • ASCE
    • Kim, J.-J., and Ibbs, C. W. (1995). "Work-package-Process model for piping construction." J. Constr. Engrg., and Mgmt., ASCE, 121(4), 381-387.
    • (1995) J. Constr. Engrg., and Mgmt. , vol.121 , Issue.4 , pp. 381-387
    • Kim, J.-J.1    Ibbs, C.W.2
  • 11
    • 0345356706 scopus 로고
    • Application of the new production philosophy to the construction industry
    • Center for Integrated Facilities Engineering, Dept. of Civil Engineering, Stanford University, Stanford, Calif.
    • Koskela, L. (1992). "Application of the new production philosophy to the construction industry." Tech. Rep. No. 72, Center for Integrated Facilities Engineering, Dept. of Civil Engineering, Stanford University, Stanford, Calif.
    • (1992) Tech. Rep. No. 72
    • Koskela, L.1
  • 12
    • 0344925325 scopus 로고    scopus 로고
    • Microsoft Corp., Redmond, Wash.
    • Microsoft Project '98. (1997). Microsoft Corp., Redmond, Wash.
    • (1997) Microsoft Project '98
  • 13
    • 0344925323 scopus 로고    scopus 로고
    • Primavera Systems Inc., Bala Cynwyd, Pa.
    • Primavera Project Planner 2.0. (1997). Primavera Systems Inc., Bala Cynwyd, Pa.
    • (1997) Primavera Project Planner 2.0
  • 14
    • 0344494299 scopus 로고    scopus 로고
    • Meridian Project Systems, Inc., Sacramento, Calif.
    • Prolog Manager. (1998). Meridian Project Systems, Inc., Sacramento, Calif.
    • (1998) Prolog Manager
  • 15
    • 0003872290 scopus 로고    scopus 로고
    • Challenges and a vision for computer-integrated management systems for medium-sized contractors
    • Russell, A., and Froese, T. (1997). "Challenges and a vision for computer-integrated management systems for medium-sized contractors." Can. J. Civ. Engrg., 24(2), 180-190.
    • (1997) Can. J. Civ. Engrg. , vol.24 , Issue.2 , pp. 180-190
    • Russell, A.1    Froese, T.2
  • 16
    • 0345356705 scopus 로고    scopus 로고
    • CADSaPPlan: The last designer's CAD-database system that integrates sourcing, design, and procurement planning
    • Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of California, Berkeley, Calif.
    • Sadonio, M. J. (1998). "CADSaPPlan: The Last Designer's CAD-database system that integrates Sourcing, Design, and Procurement Planning." M. Engrg. Rep., Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of California, Berkeley, Calif.
    • (1998) M. Engrg. Rep.
    • Sadonio, M.J.1
  • 17
    • 0031629966 scopus 로고    scopus 로고
    • The last designer's database-CAD for sourcing, procurement, and planning
    • ASCE
    • Sadonio, M., Tommelein, I. D., and Zabelle, T. R. (1998). "The Last Designer's Database-CAD for Sourcing, Procurement, and Planning." Proc., Computing Congr. '98, ASCE, 364-375.
    • (1998) Proc., Computing Congr. '98 , pp. 364-375
    • Sadonio, M.1    Tommelein, I.D.2    Zabelle, T.R.3
  • 18
    • 0006802258 scopus 로고    scopus 로고
    • Coordinating specialists
    • Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of California, Berkeley, Calif
    • Tommelein, I. D., and Ballard, G. (1997). "Coordinating specialists." Tech. Rep. No. 97-8, Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of California, Berkeley, Calif; also, Proc., 2nd Int. Seminar on Lean Constr., October 1997, A. S. I. Conte, Logical Systems, São Paulo, Brazil.
    • (1997) Tech. Rep. No. 97-8
    • Tommelein, I.D.1    Ballard, G.2
  • 19
    • 0344063145 scopus 로고    scopus 로고
    • October 1997, A. S. I. Conte, Logical Systems, São Paulo, Brazil
    • Tommelein, I. D., and Ballard, G. (1997). "Coordinating specialists." Tech. Rep. No. 97-8, Constr. Engrg. and Mgmt. Program, Civ. and Envir. Engrg. Dept., University of California, Berkeley, Calif; also, Proc., 2nd Int. Seminar on Lean Constr., October 1997, A. S. I. Conte, Logical Systems, São Paulo, Brazil.
    • Proc., 2nd Int. Seminar on Lean Constr.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.