-
1
-
-
0000981977
-
Planning construction of repetitive building units
-
ASCE
-
Carr, R. I., and Meyer, W. L. (1974). "Planning construction of repetitive building units." J. Constr. Div., ASCE, 100(3), 403-412.
-
(1974)
J. Constr. Div.
, vol.100
, Issue.3
, pp. 403-412
-
-
Carr, R.I.1
Meyer, W.L.2
-
2
-
-
11644315880
-
-
PhD/thesis, Univ. of Alberta, Edmonton, Alberta, Canada
-
Chehayeb, N. N. (1995). "Simulation-based project control," PhD/thesis, Univ. of Alberta, Edmonton, Alberta, Canada.
-
(1995)
Simulation-based Project Control
-
-
Chehayeb, N.N.1
-
3
-
-
11644256256
-
Special conditions for time scheduling of building modernization projects
-
Dutch Proj. Mgmt. Soc.
-
Fiedler, K. (1985). "Special conditions for time scheduling of building modernization projects." Proc., 8th Conf. on Internet. Dutch Proj. Mgmt. Soc., Vol. 2, 461-468.
-
(1985)
Proc., 8th Conf. on Internet
, vol.2
, pp. 461-468
-
-
Fiedler, K.1
-
5
-
-
5844417448
-
-
Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette, Ind.
-
Halpin, D. W. (1990a). MicroCYCLONE system manual. Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette, Ind.
-
(1990)
MicroCYCLONE System Manual
-
-
Halpin, D.W.1
-
6
-
-
0039797035
-
-
Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette, Ind.
-
Halpin, D. W. (1990b). MicroCYCLONE user's manual. Div. of Constr. Engrg. and Mgmt., Purdue Univ., West Lafayette, Ind.
-
(1990)
MicroCYCLONE User's Manual
-
-
Halpin, D.W.1
-
7
-
-
0003402124
-
-
John Wiley & Sons, Inc., New York, N.Y.
-
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations, 2nd Ed., John Wiley & Sons, Inc., New York, N.Y.
-
(1992)
Planning and Analysis of Construction Operations, 2nd Ed.
-
-
Halpin, D.W.1
Riggs, L.S.2
-
8
-
-
0003402124
-
-
John Wiley & Sons, Inc., New York, N.Y.
-
Halpin, D., and Woodhead, R. (1976). Planning and analysis of construction operations, 1st Ed., John Wiley & Sons, Inc., New York, N.Y.
-
(1976)
Planning and Analysis of Construction Operations, 1st Ed.
-
-
Halpin, D.1
Woodhead, R.2
-
9
-
-
0023363930
-
Hierarchical rule-based activity duration estimation
-
ASCE
-
Hendrickson, C., Martinelli, D., and Rehak, D. (1987). "Hierarchical rule-based activity duration estimation." J. Constr. Div., ASCE, 113(2), 288-301.
-
(1987)
J. Constr. Div.
, vol.113
, Issue.2
, pp. 288-301
-
-
Hendrickson, C.1
Martinelli, D.2
Rehak, D.3
-
10
-
-
0028750455
-
Simulation of cable-stayed bridges using DISCO
-
Huang, R., Grigoriadis, A. M., and Halpin, D. W. (1994). "Simulation of cable-stayed bridges using DISCO." Proc., 1994 Winter Simulation Conf., 1130-1136.
-
(1994)
Proc., 1994 Winter Simulation Conf.
, pp. 1130-1136
-
-
Huang, R.1
Grigoriadis, A.M.2
Halpin, D.W.3
-
11
-
-
11644277011
-
Experience with and evaluation of critical path methods
-
E. W. Davis, ed., Inst, of Industrial Engrs., Atlanta, Ga.
-
Jennett, E. (1983). "Experience with and evaluation of critical path methods." Projet management: Techniques, applications and managerial issues, E. W. Davis, ed., Inst, of Industrial Engrs., Atlanta, Ga., 156-186.
-
(1983)
Projet Management: Techniques, Applications and Managerial Issues
, pp. 156-186
-
-
Jennett, E.1
-
12
-
-
0004749860
-
The application of the 'line of balance' technique to the construction industry
-
July
-
Khisty, C. J. (1970). "The application of the 'line of balance' technique to the construction industry." Indian Concrete J., July, 297-320.
-
(1970)
Indian Concrete J.
, pp. 297-320
-
-
Khisty, C.J.1
-
13
-
-
0342987657
-
Graphical object-oriented system for construction process modeling
-
ASCE, Reston, Va.
-
Liu, L. Y, and Ioannou, P. G. (1992). "Graphical object-oriented system for construction process modeling." Proc., 8th Conf. on Computing in Civ. Engrg., ASCE, Reston, Va., 1139-1146.
-
(1992)
Proc., 8th Conf. on Computing in Civ. Engrg.
, pp. 1139-1146
-
-
Liu, L.Y.1
Ioannou, P.G.2
-
15
-
-
0002641538
-
An analytical study of the PERT assumptions
-
MacCrimmon, K. R., and Ryavec, C. A. (1964). "An analytical study of the PERT assumptions." Operations Res., 12, 16-38.
-
(1964)
Operations Res.
, vol.12
, pp. 16-38
-
-
MacCrimmon, K.R.1
Ryavec, C.A.2
-
16
-
-
0027662666
-
Resource-oriented modeling and simulation in construction
-
ASCE
-
McCahill, D. F., and Bernold, L. E. (1993). "Resource-oriented modeling and simulation in construction." J. Constr. Engrg. and Mgmt., ASCE, 119(3), 590-606.
-
(1993)
J. Constr. Engrg. and Mgmt.
, vol.119
, Issue.3
, pp. 590-606
-
-
McCahill, D.F.1
Bernold, L.E.2
-
20
-
-
11644265789
-
Applied earned value for project control
-
Trinidad, W.I., September
-
Moselhi, O. (1993). "Applied earned value for project control." CIB W-65, Trinidad, W.I., September, 869-879.
-
(1993)
CIB W-65
, pp. 869-879
-
-
Moselhi, O.1
-
21
-
-
0016643558
-
VPM scheduling for high-rise buildings
-
O'Brien. (1975). "VPM scheduling for high-rise buildings." J. Constr. Engrg. and Mgmt., 101(4), 895-905.
-
(1975)
J. Constr. Engrg. and Mgmt.
, vol.101
, Issue.4
, pp. 895-905
-
-
O'Brien1
-
22
-
-
0343046793
-
Knowledge-based simulation of construction plans
-
ASCE Reston, Va.
-
Odeh, A. M., Tommelein, I. D., and Carr, R. I. (1992). "Knowledge-based simulation of construction plans." Proc., 8th Conf, on Computing in Civ. Engrg., ASCE Reston, Va., 1042-1049.
-
(1992)
Proc., 8th Conf, on Computing in Civ. Engrg.
, pp. 1042-1049
-
-
Odeh, A.M.1
Tommelein, I.D.2
Carr, R.I.3
-
23
-
-
0023366950
-
Construction operations simulation by microcomputer
-
ASCE
-
Paulson, B. C., Jr., Chan, W. T., and Koo, C. C. (1987). "Construction operations simulation by microcomputer." J. Constr. Engrg. and Mgmt., ASCE, 113(2), 302-314.
-
(1987)
J. Constr. Engrg. and Mgmt.
, vol.113
, Issue.2
, pp. 302-314
-
-
Paulson Jr., B.C.1
Chan, W.T.2
Koo, C.C.3
-
24
-
-
0003638350
-
-
Prentice-Hall Inc., Englewood Cliffs, N.J.
-
Pritsker, A. A. B., Sigal, C. E., and Hammesfahr, R. D. J. (1989). SLAM II: Network models for decision support. Prentice-Hall Inc., Englewood Cliffs, N.J.
-
(1989)
SLAM II: Network Models for Decision Support
-
-
Pritsker, A.A.B.1
Sigal, C.E.2
Hammesfahr, R.D.J.3
-
25
-
-
0025669399
-
Progress-based construction scheduling
-
ASCE
-
Pultar, M. (1990). "Progress-based construction scheduling." J. Constr. Engrg. and Mgmt., ASCE, 116(4), 670-688.
-
(1990)
J. Constr. Engrg. and Mgmt.
, vol.116
, Issue.4
, pp. 670-688
-
-
Pultar, M.1
-
26
-
-
11644327387
-
Repetitive activity scheduling process
-
Orlando, Fla.
-
Rahbar, F. F., and Rowing, J. E. (1992). "Repetitive activity scheduling process." Proc., AACE 36th Annu. Mtg., Orlando, Fla., 0.5.1-0.5.8.
-
(1992)
Proc., AACE 36th Annu. Mtg.
-
-
Rahbar, F.F.1
Rowing, J.E.2
-
27
-
-
0027607475
-
A new generation of planning structures
-
ASCE
-
Russell, A. D., and Wong, W. C. M. (1993). "A new generation of planning structures." J. Constr. Engrg. and Mgmt., ASCE, 119(2), 196-214.
-
(1993)
J. Constr. Engrg. and Mgmt.
, vol.119
, Issue.2
, pp. 196-214
-
-
Russell, A.D.1
Wong, W.C.M.2
-
28
-
-
0025598377
-
Formal development of line-of-balance technique
-
ASCE
-
Sarraj, Z. M. A. (1990). Formal development of line-of-balance technique." J. Constr. Engrg. and Mgmt., ASCE, 116(4), 689-704.
-
(1990)
J. Constr. Engrg. and Mgmt.
, vol.116
, Issue.4
, pp. 689-704
-
-
Sarraj, Z.M.A.1
-
29
-
-
0012255826
-
-
PhD thesis, Univ. of Alberta, Edmonton, Alberta, Canada
-
Sawhney, A. (1994). "Simulation-based planning for construction." PhD thesis, Univ. of Alberta, Edmonton, Alberta, Canada.
-
(1994)
Simulation-based Planning for Construction
-
-
Sawhney, A.1
-
30
-
-
0012298484
-
-
PhD thesis, Univ. of Alberta, Edmonton, Alberta, Canada
-
Shi, J. (1995). "Automated modeling and optimization for construction simulation. PhD thesis, Univ. of Alberta, Edmonton, Alberta, Canada.
-
(1995)
Automated Modeling and Optimization for Construction Simulation
-
-
Shi, J.1
-
31
-
-
4043127335
-
Third Generation PERT/ LOB
-
Shoderbek, P. P., and Digman, L. A. (1967). "Third Generation PERT/ LOB." Harvard Business Rev., 45(5), 100-110.
-
(1967)
Harvard Business Rev.
, vol.45
, Issue.5
, pp. 100-110
-
-
Shoderbek, P.P.1
Digman, L.A.2
-
32
-
-
0027574310
-
Out of logic progress
-
Am. Assn. of Cost Engrs.
-
Suhail, S. A. (1993). "Out of logic progress." Cost Engrg., Am. Assn. of Cost Engrs., 35(4), 23-28.
-
(1993)
Cost Engrg.
, vol.35
, Issue.4
, pp. 23-28
-
-
Suhail, S.A.1
|