-
1
-
-
0025682920
-
Probabilistic simulation studies for repetitive construction processes
-
AbouRizk, S. M., and Halpin, D. W. (1990). "Probabilistic simulation studies for repetitive construction processes." J. Constr. Engrg. and Mgmt., ASCE, 116(4), 575-594.
-
(1990)
J. Constr. Engrg. and Mgmt., ASCE
, vol.116
, Issue.4
, pp. 575-594
-
-
Abourizk, S.M.1
Halpin, D.W.2
-
2
-
-
0026913088
-
Statistical properties of construction duration data
-
AbouRizk, S. M., and Halpin, D. W. (1992). "Statistical properties of construction duration data." J. Constr. Engrg. and Mgmt., ASCE, 118(3), 525-544.
-
(1992)
J. Constr. Engrg. and Mgmt., ASCE
, vol.118
, Issue.3
, pp. 525-544
-
-
Abourizk, S.M.1
Halpin, D.W.2
-
3
-
-
0026391496
-
Visual interactive fitting of beta distributions
-
AbouRizk, S. M., Halpin, D. W., and Wilson, J. R. (1991). "Visual interactive fitting of beta distributions." J. Constr. Engrg. and Mgmt., ASCE, 117(4), 589-605.
-
(1991)
J. Constr. Engrg. and Mgmt., ASCE
, vol.117
, Issue.4
, pp. 589-605
-
-
Abourizk, S.M.1
Halpin, D.W.2
Wilson, J.R.3
-
4
-
-
0028457078
-
Fitting beta distributions based on sample data
-
AbouRizk, S. M., Halpin, D. W., and Wilson, J. R. (1994). "Fitting beta distributions based on sample data." J. Constr. Engrg. and Mgmt., ASCE, 120(2), 288-305.
-
(1994)
J. Constr. Engrg. and Mgmt., ASCE
, vol.120
, Issue.2
, pp. 288-305
-
-
Abourizk, S.M.1
Halpin, D.W.2
Wilson, J.R.3
-
5
-
-
0028456596
-
Automated construction-simulation optimization
-
AbouRizk, S. M., and Shi, J. (1994). "Automated construction-simulation optimization." J. Constr. Engrg. and Mgmt., ASCE, 120(2), 374-385.
-
(1994)
J. Constr. Engrg. and Mgmt., ASCE
, vol.120
, Issue.2
, pp. 374-385
-
-
Abourizk, S.M.1
Shi, J.2
-
7
-
-
0343820427
-
-
Palisade Corp., Newfield, N.Y.
-
BestFit software on line help. (1993). Palisade Corp., Newfield, N.Y.
-
(1993)
BestFit Software on Line Help
-
-
-
8
-
-
0018159874
-
The SCRAPESIM computer simulation
-
Clemmens, J. P., and Willenbrock, J. H. (1978). "The SCRAPESIM computer simulation." J. Constr. Div., ASCE, 104(4), 419-435.
-
(1978)
J. Constr. Div., ASCE
, vol.104
, Issue.4
, pp. 419-435
-
-
Clemmens, J.P.1
Willenbrock, J.H.2
-
9
-
-
0027205746
-
Simulating paving fleets with non-stationary travel
-
Farid, F., and Aziz, T. (1993). "Simulating paving fleets with non-stationary travel." Comp. in Civ. Engrg., ASCE, 2, 1198-1206.
-
(1993)
Comp. in Civ. Engrg., ASCE
, vol.2
, pp. 1198-1206
-
-
Farid, F.1
Aziz, T.2
-
10
-
-
0028452701
-
Simulation verifies queueing program for selecting loader-truck fleets
-
Farid, F., and Koning, T. L. (1994). "Simulation verifies queueing program for selecting loader-truck fleets." J. Constr. Engrg. and Mgmt., ASCE, 120(2), 386-404.
-
(1994)
J. Constr. Engrg. and Mgmt., ASCE
, vol.120
, Issue.2
, pp. 386-404
-
-
Farid, F.1
Koning, T.L.2
-
11
-
-
0342949301
-
-
Tech. Rep. No. 111, Dept. of Civ. Engrg., Stanford University, Stanford, Calif
-
Gaarslev, A. (1969). "Stochastic models to estimate the production of material handling systems in the construction industry." Tech. Rep. No. 111, Dept. of Civ. Engrg., Stanford University, Stanford, Calif.
-
(1969)
Stochastic Models to Estimate the Production of Material Handling Systems in the Construction Industry
-
-
Gaarslev, A.1
-
12
-
-
0027666467
-
Comparison of two simulation methodologies in construction
-
Gonzalez-Quevedo, A. A., AbouRizk, S. M., Iseley, D. T., and Halpin, D. W. (1993). "Comparison of two simulation methodologies in construction." J. Constr. Engrg. and Mgmt., ASCE, 119(3), 573-589.
-
(1993)
J. Constr. Engrg. and Mgmt., ASCE
, vol.119
, Issue.3
, pp. 573-589
-
-
Gonzalez-Quevedo, A.A.1
Abourizk, S.M.2
Iseley, D.T.3
Halpin, D.W.4
-
13
-
-
0024945802
-
Estimating production of multiloader-truck fleets
-
Transportation Research Board, Washington, D.C.
-
Karshenas, S. (1985). "Estimating production of multiloader-truck fleets." Transp. Res. Rec. 1234, Transportation Research Board, Washington, D.C., 84-86.
-
(1985)
Transp. Res. Rec.
, vol.1234
, pp. 84-86
-
-
Karshenas, S.1
-
16
-
-
0345811815
-
An application of the theory of queues to the forecasting of shovel-truck fleet production
-
Dept. of Civ. Engrg., University of Illinois, Urbana, Ill.
-
O'Shea, J. F., Slutkin, G. N., and Shaffer, L. R. (1964). "An application of the theory of queues to the forecasting of shovel-truck fleet production." Constr. Res. Ser. No. 3, Dept. of Civ. Engrg., University of Illinois, Urbana, Ill.
-
(1964)
Constr. Res. Ser.
, vol.3
-
-
O'Shea, J.F.1
Slutkin, G.N.2
Shaffer, L.R.3
-
17
-
-
0023366950
-
Construction operations simulation by microcomputer
-
Paulson, B. C., Jr., Chan, W. T., and Koo, C. C. (1987). "Construction operations simulation by microcomputer." J. Constr. Engrg. and Mgmt., ASCE, 113(2), 302-314.
-
(1987)
J. Constr. Engrg. and Mgmt., ASCE
, vol.113
, Issue.2
, pp. 302-314
-
-
Paulson B.C., Jr.1
Chan, W.T.2
Koo, C.C.3
-
19
-
-
0027610292
-
Simulation technologies for planning heavy construction processes
-
Vanegas, J. A., Bravo, E. B., and Halpin, D. W. (1993). "Simulation technologies for planning heavy construction processes." J. Constr. Engrg. and Mgmt., ASCE, 119(2), 336-354.
-
(1993)
J. Constr. Engrg. and Mgmt., ASCE
, vol.119
, Issue.2
, pp. 336-354
-
-
Vanegas, J.A.1
Bravo, E.B.2
Halpin, D.W.3
-
20
-
-
0015315831
-
Estimating cost of earthwork via simulation
-
Willenbrock, J. H. (1972). "Estimating cost of earthwork via simulation." J. Constr. Div., ASCE, 98(1), 49-60.
-
(1972)
J. Constr. Div., ASCE
, vol.98
, Issue.1
, pp. 49-60
-
-
Willenbrock, J.H.1
|