1
-
-
84876823885
-
State of the art in construction simulation
-
Abourizk, S., Halpin, D., and Lutz, J. (1992). "State of the art in construction simulation." Proc., 1992 Winter Simulation Conf., 1271-1277.
-
(1992)
Proc., 1992 Winter Simulation Conf.
, pp. 1271-1277
-
-
Abourizk, S.1
Halpin, D.2
Lutz, J.3
-
2
-
-
0000981977
-
Planning construction of repetitive building units
-
ASCE
-
Carr, R. I., and Meyer, W. L. (1974). "Planning construction of repetitive building units." J. Constr. Div., ASCE, 100(3), 403-412.
-
(1974)
J. Constr. Div.
, vol.100
, Issue.3
, pp. 403-412
-
-
Carr, R.I.1
Meyer, W.L.2
-
3
-
-
0006238013
-
RESQUE: A resource oriented simulation system for multiple resource constrained processes
-
Milwaukee, Wis.
-
Chang, D. Y., and Carr, R. I. (1987). "RESQUE: a resource oriented simulation system for multiple resource constrained processes." Proc., PMI Seminar/Symp. Milwaukee, Wis., 4-19.
-
(1987)
Proc., PMI Seminar/Symp.
, pp. 4-19
-
-
Chang, D.Y.1
Carr, R.I.2
-
4
-
-
0022917749
-
Application of linear scheduling
-
ASCE
-
Chrzanowski, E. N., and Johnston, D. W. (1986). "Application of linear scheduling." J. Constr. Engrg., ASCE, 112(4), 476-491.
-
(1986)
J. Constr. Engrg.
, vol.112
, Issue.4
, pp. 476-491
-
-
Chrzanowski, E.N.1
Johnston, D.W.2
-
5
-
-
0542366507
-
-
Prentice-Hall International, Ltd., Hertfordshire, U.K.
-
Davies, R., and O'Keefe, R. (1989). Simulation modelling with Pascal. Prentice-Hall International, Ltd., Hertfordshire, U.K.
-
(1989)
Simulation Modelling with Pascal
-
-
Davies, R.1
O'Keefe, R.2
-
7
-
-
0003402124
-
-
John Wiley & Sons, Inc., New York, N.Y.
-
Halpin, D. W., and Riggs, L. S. (1992). Planning and analysis of construction operations. John Wiley & Sons, Inc., New York, N.Y.
-
(1992)
Planning and Analysis of Construction Operations
-
-
Halpin, D.W.1
Riggs, L.S.2
-
9
-
-
0027805668
-
Interaction between subcycles: One key to improved methods
-
ASCE
-
Howell, G., Laufer, A., and Ballard, G. (1993). "Interaction between subcycles: one key to improved methods." J. Constr. Engrg. and Mgmt., ASCE, 119(4), 714-728.
-
(1993)
J. Constr. Engrg. and Mgmt.
, vol.119
, Issue.4
, pp. 714-728
-
-
Howell, G.1
Laufer, A.2
Ballard, G.3
-
10
-
-
0010016707
-
Dynamic interface simulation for construction operations (DISCO)
-
X. G. Watson, R. Tucker, and J. Walters, eds.
-
Huang, R. Y., and Halpin, D. W. (1993). "Dynamic interface simulation for construction operations (DISCO)." Automation and robotics in construction, X. G. Watson, R. Tucker, and J. Walters, eds., 503-510.
-
(1993)
Automation and Robotics in Construction
, pp. 503-510
-
-
Huang, R.Y.1
Halpin, D.W.2
-
11
-
-
0006595666
-
INSIGHT - Interactive simulation of construction operations using graphical techniques
-
Constr. Inst., Dept. of Civ. Engrg., Stanford Univ., Stanford, Calif.
-
Kalk, A. (1980). "INSIGHT - interactive simulation of construction operations using graphical techniques." Tech. Rep. No. 238, Constr. Inst., Dept. of Civ. Engrg., Stanford Univ., Stanford, Calif.
-
(1980)
Tech. Rep. No. 238
-
-
Kalk, A.1
-
13
-
-
0003267827
-
Is construction project planning really doing its job? A critical examination of focus, role and process
-
Laufer, A., and Tucker, R. L. (1987). "Is construction project planning really doing its job? A critical examination of focus, role and process." Constr. Mgmt. and Economics, (5), 243-266.
-
(1987)
Constr. Mgmt. and Economics
, Issue.5
, pp. 243-266
-
-
Laufer, A.1
Tucker, R.L.2
-
14
-
-
0028551963
-
State and resource based construction process simulation
-
ASCE, Washington, D.C.
-
Martinez, J., Ioannou, P., and Carr, R. (1994) "State and resource based construction process simulation." Proc., 1st Congr. on Computing in Civ. Engrg., ASCE, Washington, D.C. 177-184.
-
(1994)
Proc., 1st Congr. on Computing in Civ. Engrg.
, pp. 177-184
-
-
Martinez, J.1
Ioannou, P.2
Carr, R.3
-
15
-
-
2142649813
-
Network analysis and construction planning and control
-
ASCE
-
Peer, S. (1974). "Network analysis and construction planning and control." J. Constr. Div., ASCE, 100(3), 203-210.
-
(1974)
J. Constr. Div.
, vol.100
, Issue.3
, pp. 203-210
-
-
Peer, S.1
-
18
-
-
0025447970
-
RPM: Repetitive project modeling
-
ASCE
-
Reda, R. M. (1990). "RPM: repetitive project modeling." J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316-330.
-
(1990)
J. Constr. Engrg. and Mgmt.
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.M.1
-
19
-
-
0024733804
-
Risk management in CPM networks
-
Elsevier Applied Science, New York, N.Y.
-
Riggs, L. S. (1989). "Risk management in CPM networks." Microcomputers in civil engineering. Elsevier Applied Science, New York, N.Y., 229-235.
-
(1989)
Microcomputers in Civil Engineering
, pp. 229-235
-
-
Riggs, L.S.1
-
20
-
-
0029471402
-
Late-time computation for task chains using discrete event simulation
-
ASCE
-
Senior, B. A. (1995a). "Late-time computation for task chains using discrete event simulation." J. Constr. Engr. and Mgmt., ASCE, 121(4), 397-403.
-
(1995)
J. Constr. Engr. and Mgmt.
, vol.121
, Issue.4
, pp. 397-403
-
-
Senior, B.A.1
-
21
-
-
0029228868
-
Simulation and critical path method software connectivity
-
ASCE, Atlanta, Ga.
-
Senior, B. A. (1995b). "Simulation and critical path method software connectivity." Proc., 2nd Congr. on Computing in Civ. Engrg., ASCE, Atlanta, Ga., 1412-1419.
-
(1995)
Proc., 2nd Congr. on Computing in Civ. Engrg.
, pp. 1412-1419
-
-
Senior, B.A.1
-
22
-
-
0028560760
-
An integrated approach to repetitive construction planning
-
ASCE, Washington, D.C.
-
Senior, B. A., and Halpin, D. W. (1994). "An integrated approach to repetitive construction planning." Proc., 1st Congr. on Computing in Civ. Engrg., ASCE, Washington, D.C., 25-32.
-
(1994)
Proc., 1st Congr. on Computing in Civ. Engrg.
, pp. 25-32
-
-
Senior, B.A.1
Halpin, D.W.2
-
23
-
-
0025460174
-
CPM USE in ENR top 400 contractors
-
ASCE
-
Tavakoli, A., and Riacni, R. (1990). "CPM USE in ENR top 400 contractors." J. Mgmt. in Engrg., ASCE, 6(3), 282-295.
-
(1990)
J. Mgmt. in Engrg.
, vol.6
, Issue.3
, pp. 282-295
-
-
Tavakoli, A.1
Riacni, R.2
|