Volumn 124, Issue 1, 1998, Pages 72-81

Simplified simulation system for construction projects

Author keywords

[No Author keywords available]

Indexed keywords


EID: 0002324953     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1998)124:1(72)     Document Type: Article
Times cited : (40)

References (23)
  • 2
    • 0000981977 scopus 로고
    • Planning construction of repetitive building units
    • ASCE
    • Carr, R. I., and Meyer, W. L. (1974). "Planning construction of repetitive building units." J. Constr. Div., ASCE, 100(3), 403-412.
    • (1974) J. Constr. Div. , vol.100 , Issue.3 , pp. 403-412
    • Carr, R.I.1    Meyer, W.L.2
  • 3
    • 0006238013 scopus 로고
    • RESQUE: A resource oriented simulation system for multiple resource constrained processes
    • Milwaukee, Wis.
    • Chang, D. Y., and Carr, R. I. (1987). "RESQUE: a resource oriented simulation system for multiple resource constrained processes." Proc., PMI Seminar/Symp. Milwaukee, Wis., 4-19.
    • (1987) Proc., PMI Seminar/Symp. , pp. 4-19
    • Chang, D.Y.1    Carr, R.I.2
  • 4
    • 0022917749 scopus 로고
    • Application of linear scheduling
    • ASCE
    • Chrzanowski, E. N., and Johnston, D. W. (1986). "Application of linear scheduling." J. Constr. Engrg., ASCE, 112(4), 476-491.
    • (1986) J. Constr. Engrg. , vol.112 , Issue.4 , pp. 476-491
    • Chrzanowski, E.N.1    Johnston, D.W.2
  • 9
    • 0027805668 scopus 로고
    • Interaction between subcycles: One key to improved methods
    • ASCE
    • Howell, G., Laufer, A., and Ballard, G. (1993). "Interaction between subcycles: one key to improved methods." J. Constr. Engrg. and Mgmt., ASCE, 119(4), 714-728.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.119 , Issue.4 , pp. 714-728
    • Howell, G.1    Laufer, A.2    Ballard, G.3
  • 10
    • 0010016707 scopus 로고
    • Dynamic interface simulation for construction operations (DISCO)
    • X. G. Watson, R. Tucker, and J. Walters, eds.
    • Huang, R. Y., and Halpin, D. W. (1993). "Dynamic interface simulation for construction operations (DISCO)." Automation and robotics in construction, X. G. Watson, R. Tucker, and J. Walters, eds., 503-510.
    • (1993) Automation and Robotics in Construction , pp. 503-510
    • Huang, R.Y.1    Halpin, D.W.2
  • 11
    • 0006595666 scopus 로고
    • INSIGHT - Interactive simulation of construction operations using graphical techniques
    • Constr. Inst., Dept. of Civ. Engrg., Stanford Univ., Stanford, Calif.
    • Kalk, A. (1980). "INSIGHT - interactive simulation of construction operations using graphical techniques." Tech. Rep. No. 238, Constr. Inst., Dept. of Civ. Engrg., Stanford Univ., Stanford, Calif.
    • (1980) Tech. Rep. No. 238
    • Kalk, A.1
  • 13
    • 0003267827 scopus 로고
    • Is construction project planning really doing its job? A critical examination of focus, role and process
    • Laufer, A., and Tucker, R. L. (1987). "Is construction project planning really doing its job? A critical examination of focus, role and process." Constr. Mgmt. and Economics, (5), 243-266.
    • (1987) Constr. Mgmt. and Economics , Issue.5 , pp. 243-266
    • Laufer, A.1    Tucker, R.L.2
  • 15
    • 2142649813 scopus 로고
    • Network analysis and construction planning and control
    • ASCE
    • Peer, S. (1974). "Network analysis and construction planning and control." J. Constr. Div., ASCE, 100(3), 203-210.
    • (1974) J. Constr. Div. , vol.100 , Issue.3 , pp. 203-210
    • Peer, S.1
  • 18
    • 0025447970 scopus 로고
    • RPM: Repetitive project modeling
    • ASCE
    • Reda, R. M. (1990). "RPM: repetitive project modeling." J. Constr. Engrg. and Mgmt., ASCE, 116(2), 316-330.
    • (1990) J. Constr. Engrg. and Mgmt. , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.M.1
  • 19
    • 0024733804 scopus 로고
    • Risk management in CPM networks
    • Elsevier Applied Science, New York, N.Y.
    • Riggs, L. S. (1989). "Risk management in CPM networks." Microcomputers in civil engineering. Elsevier Applied Science, New York, N.Y., 229-235.
    • (1989) Microcomputers in Civil Engineering , pp. 229-235
    • Riggs, L.S.1
  • 20
    • 0029471402 scopus 로고
    • Late-time computation for task chains using discrete event simulation
    • ASCE
    • Senior, B. A. (1995a). "Late-time computation for task chains using discrete event simulation." J. Constr. Engr. and Mgmt., ASCE, 121(4), 397-403.
    • (1995) J. Constr. Engr. and Mgmt. , vol.121 , Issue.4 , pp. 397-403
    • Senior, B.A.1
  • 21
    • 0029228868 scopus 로고
    • Simulation and critical path method software connectivity
    • ASCE, Atlanta, Ga.
    • Senior, B. A. (1995b). "Simulation and critical path method software connectivity." Proc., 2nd Congr. on Computing in Civ. Engrg., ASCE, Atlanta, Ga., 1412-1419.
    • (1995) Proc., 2nd Congr. on Computing in Civ. Engrg. , pp. 1412-1419
    • Senior, B.A.1
  • 22
    • 0028560760 scopus 로고
    • An integrated approach to repetitive construction planning
    • ASCE, Washington, D.C.
    • Senior, B. A., and Halpin, D. W. (1994). "An integrated approach to repetitive construction planning." Proc., 1st Congr. on Computing in Civ. Engrg., ASCE, Washington, D.C., 25-32.
    • (1994) Proc., 1st Congr. on Computing in Civ. Engrg. , pp. 25-32
    • Senior, B.A.1    Halpin, D.W.2
  • 23
    • 0025460174 scopus 로고
    • CPM USE in ENR top 400 contractors
    • ASCE
    • Tavakoli, A., and Riacni, R. (1990). "CPM USE in ENR top 400 contractors." J. Mgmt. in Engrg., ASCE, 6(3), 282-295.
    • (1990) J. Mgmt. in Engrg. , vol.6 , Issue.3 , pp. 282-295
    • Tavakoli, A.1    Riacni, R.2