메뉴 건너뛰기




Volumn 126, Issue 2, 2000, Pages 142-148

Probabilistic monitoring of project performance using SS-curves

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; CONSTRUCTION INDUSTRY; COST BENEFIT ANALYSIS; COSTS; PLANNING; PROBABILITY DISTRIBUTIONS;

EID: 0033690430     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2000)126:2(142)     Document Type: Article
Times cited : (102)

References (20)
  • 2
    • 0016994648 scopus 로고
    • Probabilistic time scheduling
    • ASCE
    • Crandall, K. C. (1976). "Probabilistic time scheduling." J. Constr. Div., ASCE, 102(3), 415-423.
    • (1976) J. Constr. Div. , vol.102 , Issue.3 , pp. 415-423
    • Crandall, K.C.1
  • 3
    • 0017539360 scopus 로고
    • Analysis of schedule simulations
    • ASCE
    • Crandall, K. C. (1977). "Analysis of schedule simulations." J. Constr. Div., ASCE, 103(3), 387-394.
    • (1977) J. Constr. Div. , vol.103 , Issue.3 , pp. 387-394
    • Crandall, K.C.1
  • 4
    • 0020141185 scopus 로고
    • Schedule development under stochastic scheduling
    • ASCE
    • Crandall, K. C., and Woolery, J. C. (1982). "Schedule development under stochastic scheduling." J. Constr. Div., ASCE, 108(2), 321-329.
    • (1982) J. Constr. Div. , vol.108 , Issue.2 , pp. 321-329
    • Crandall, K.C.1    Woolery, J.C.2
  • 5
    • 0020825299 scopus 로고
    • Probabilistic estimating: Mathematics and applications
    • ASCE
    • Diekmann, J. E. (1983). "Probabilistic estimating: mathematics and applications." J. Constr. Engrg. and Mgmt., ASCE, 109(3), 297-308.
    • (1983) J. Constr. Engrg. and Mgmt. , vol.109 , Issue.3 , pp. 297-308
    • Diekmann, J.E.1
  • 6
    • 0343680024 scopus 로고
    • Primavera Systems, Inc., Bala Cynwyd, Pa.
    • Monte Carlo™ Version 2.0. (1993). Primavera Systems, Inc., Bala Cynwyd, Pa.
    • (1993) Monte Carlo™ Version 2.0.
  • 7
    • 13944253753 scopus 로고
    • Publication No. 6-1, Construction Industry Institute, Austin, Tex.
    • Neil, J. N. (1986). "Project control for engineering." Publication No. 6-1, Construction Industry Institute, Austin, Tex.
    • (1986) Project Control for Engineering
    • Neil, J.N.1
  • 8
    • 0009429404 scopus 로고
    • Publication No. 6-5, Construction Industry Institute, Austin, Tex.
    • Neil, J. N. (1987). "Project control for construction." Publication No. 6-5, Construction Industry Institute, Austin, Tex.
    • (1987) Project Control for Construction
    • Neil, J.N.1
  • 11
    • 0025669399 scopus 로고
    • Progress-based construction scheduling
    • ASCE
    • Pultar, M. (1990). "Progress-based construction scheduling." J. Constr. Engrg. and Mgmt., ASCE, 116(4), 670-688.
    • (1990) J. Constr. Engrg. and Mgmt. , vol.116 , Issue.4 , pp. 670-688
    • Pultar, M.1
  • 12
    • 0029239251 scopus 로고
    • Integrated analysis of cost risk and schedule risk
    • ASCE, New York
    • Rao, G. N., and Grobler, F. (1995). "Integrated analysis of cost risk and schedule risk." Proc., Comp. in Civ. Engrg., ASCE, New York, 1404-1411.
    • (1995) Proc., Comp. in Civ. Engrg. , pp. 1404-1411
    • Rao, G.N.1    Grobler, F.2
  • 13
    • 0343680020 scopus 로고
    • Palisade, Inc., Newfield, N.Y.
    • @ RISK for Project™. (1993). Palisade, Inc., Newfield, N.Y.
    • (1993) @ Risk for Project™.
  • 14
    • 0029228868 scopus 로고
    • Simulation and critical path method software connectivity
    • ASCE, New York
    • Senior, B. A. (1995). "Simulation and critical path method software connectivity." Proc., Comp. in Civ. Engrg., ASCE, New York, 1412-1419.
    • (1995) Proc., Comp. in Civ. Engrg. , pp. 1412-1419
    • Senior, B.A.1
  • 15
    • 0028602068 scopus 로고
    • A PC-based stochastic project scheduling and costing module
    • ASCE, New York
    • Sha'ath, K. K., and Singh, G. (1994). "A PC-based stochastic project scheduling and costing module." Proc., Comp. in Civ. Engrg., ASCE, New York, 9-16.
    • (1994) Proc., Comp. in Civ. Engrg. , pp. 9-16
    • Sha'ath, K.K.1    Singh, G.2
  • 16
    • 0026188819 scopus 로고
    • Developing and implementing C-SCSC
    • ASCE
    • Singh, A. (1991). "Developing and implementing C-SCSC." J. Profl. Issues in Engrg. Educ. and Pract., ASCE, 117(3), 295-308.
    • (1991) J. Profl. Issues in Engrg. Educ. and Pract. , vol.117 , Issue.3 , pp. 295-308
    • Singh, A.1
  • 17
    • 0342809807 scopus 로고
    • Cost control: Integrated cost/schedule performance
    • ASCE, New York
    • Stevens, W. M. (1983). "Cost control: integrated cost/schedule performance." Proc., Improving Productivity, ASCE, New York, 16-27.
    • (1983) Proc., Improving Productivity , pp. 16-27
    • Stevens, W.M.1
  • 18
    • 0027560002 scopus 로고
    • Probabilistic cost estimation with subjective correlations
    • ASCE
    • Touran, A. (1993). "Probabilistic cost estimation with subjective correlations." J. Constr. Engrg. and Mgmt., ASCE, 119(1), 58-71.
    • (1993) J. Constr. Engrg. and Mgmt. , vol.119 , Issue.1 , pp. 58-71
    • Touran, A.1
  • 19
    • 0028552229 scopus 로고
    • Probabilistic modeling of scheduling uncertainty: Methods and tools
    • ASCE, New York
    • Touran, A. (1994). "Probabilistic modeling of scheduling uncertainty: methods and tools." Proc., Comp. in Civ. Engrg., ASCE, New York, 380-383.
    • (1994) Proc., Comp. in Civ. Engrg. , pp. 380-383
    • Touran, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.