메뉴 건너뛰기




Volumn 125, Issue 5, 1999, Pages 339-346

Application of mathematical matrix to integrate project schedule and cost

Author keywords

[No Author keywords available]

Indexed keywords

ALGORITHMS; COST ACCOUNTING; HOUSING; MATHEMATICAL MODELS; MATRIX ALGEBRA; SCHEDULING; SPREADSHEETS;

EID: 0032684769     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1999)125:5(339)     Document Type: Article
Times cited : (21)

References (7)
  • 3
    • 0345040934 scopus 로고
    • A study on the integration of design/cost/schedule information (I)
    • Kim, J. J. (1995). "A study on the integration of design/cost/schedule information (I)." J. Arch. Inst. of Korea, 11(2), 163-171.
    • (1995) J. Arch. Inst. of Korea , vol.11 , Issue.2 , pp. 163-171
    • Kim, J.J.1
  • 4
    • 0029727089 scopus 로고    scopus 로고
    • New approach for optimization of overall construction schedule
    • Li, S. (1996). "New approach for optimization of overall construction schedule." J. Constr. Engrg. and Mgmt., ASCE, 122(1), 7-13.
    • (1996) J. Constr. Engrg. and Mgmt., ASCE , vol.122 , Issue.1 , pp. 7-13
    • Li, S.1
  • 7
    • 0344609953 scopus 로고
    • Current needs for cost control systems
    • C. W. Ibbs and D. B. Ashley, eds., ASCE, New York
    • Teicholz, P. M. (1987). "Current needs for cost control systems." Project controls: Needs and solutions, C. W. Ibbs and D. B. Ashley, eds., ASCE, New York, 47-57.
    • (1987) Project Controls: Needs and Solutions , pp. 47-57
    • Teicholz, P.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.