|
Volumn 20, Issue 2, 2002, Pages 153-161
|
Modelling and performance evaluation of an overhead hoist transport system in a 300 mm fabrication plant
a |
Author keywords
CTPN; Modelling; OHT; Performance evaluation; Simulation
|
Indexed keywords
COMPUTER SIMULATION;
GRAPHICAL USER INTERFACES;
INTEGRATED CIRCUIT MANUFACTURE;
INTELLIGENT CONTROL;
MATERIALS HANDLING;
MATERIALS HANDLING EQUIPMENT;
PERFORMANCE;
PETRI NETS;
ROBOTICS;
SCHEDULING;
COLOURED TIMED PETRI NET;
OBJECT-BASED SIMULATION TECHNIQUE;
OVERHEAD HOIST TRANSPORT SYSTEM;
COMPUTER AIDED MANUFACTURING;
|
EID: 0036351167
PISSN: 02683768
EISSN: None
Source Type: Journal
DOI: 10.1007/s001700200137 Document Type: Article |
Times cited : (24)
|
References (22)
|