메뉴 건너뛰기




Volumn 33, Issue 10, 2009, Pages 1644-1660

A novel network-based continuous-time representation for process scheduling: Part II. General framework

Author keywords

Mixed integer linear programming; Network based continuous time representation; Process scheduling

Indexed keywords

BATCH PROCESS; CONTINUOUS-TIME REPRESENTATION; FINISHED PRODUCTS; INTEGRATED FRAMEWORKS; MATERIAL TRANSFERS; MIXED-INTEGER LINEAR PROGRAMMING; NETWORK-BASED; NETWORK-BASED CONTINUOUS-TIME REPRESENTATION; PROCESS SCHEDULING; PROCESS-SCHEDULING PROBLEM; RESOURCE-CONSTRAINED; SHARED STORAGE; SHORT-TERM SCHEDULING; STORAGE UNITS;

EID: 68549088725     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2009.04.013     Document Type: Article
Times cited : (23)

References (29)
  • 2
    • 0028319450 scopus 로고
    • Redesign of a multipurpose batch pilot plant with Cleaning In Place (CIP) integration
    • Barbosa-Póvoa A.P., and Macchietto S. Redesign of a multipurpose batch pilot plant with Cleaning In Place (CIP) integration. Computers and Chemical Engineering 18 (1994) S277-S281
    • (1994) Computers and Chemical Engineering , vol.18
    • Barbosa-Póvoa, A.P.1    Macchietto, S.2
  • 3
    • 0035795519 scopus 로고    scopus 로고
    • An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants
    • Castro P., Barbosa-Póvoa A.P., and Matos H. An improved RTN continuous-time formulation for the short-term scheduling of multipurpose batch plants. Industrial and Engineering Chemistry Research 40 (2001) 2059-2068
    • (2001) Industrial and Engineering Chemistry Research , vol.40 , pp. 2059-2068
    • Castro, P.1    Barbosa-Póvoa, A.P.2    Matos, H.3
  • 5
    • 11844300749 scopus 로고    scopus 로고
    • Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations
    • Castro P.M., Barbosa-Póvoa A.P., and Novais A.Q. Simultaneous design and scheduling of multipurpose plants using resource task network based continuous-time formulations. Industrial and Engineering Chemistry Research 44 (2005) 343-357
    • (2005) Industrial and Engineering Chemistry Research , vol.44 , pp. 343-357
    • Castro, P.M.1    Barbosa-Póvoa, A.P.2    Novais, A.Q.3
  • 7
    • 0000685021 scopus 로고    scopus 로고
    • RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants
    • Dimitriadis A.D., Shah N., and Pantelides C.C. RTN-based rolling horizon algorithms for medium term scheduling of multipurpose plants. Computers and Chemical Engineering 21 (1997) S1061-S1066
    • (1997) Computers and Chemical Engineering , vol.21
    • Dimitriadis, A.D.1    Shah, N.2    Pantelides, C.C.3
  • 8
    • 30444434197 scopus 로고    scopus 로고
    • A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants
    • Erdirik-Dogan M., and Grossmann I.E. A decomposition method for the simultaneous planning and scheduling of single-stage continuous multiproduct plants. Industrial and Engineering Chemistry Research 45 (2006) 299-315
    • (2006) Industrial and Engineering Chemistry Research , vol.45 , pp. 299-315
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 10
    • 67651092136 scopus 로고    scopus 로고
    • A novel network-based continuous-time representation for process scheduling: Part I. Basic concepts and mathematical formulation
    • doi:10.1016/j.compchemeng.2009.03.007
    • Giménez, D. M., Henning, G. P. & Maravelias, C. T. (2009). A novel network-based continuous-time representation for process scheduling: Part I. Basic concepts and mathematical formulation. Computers and Chemical Engineering, doi:10.1016/j.compchemeng.2009.03.007.
    • (2009) Computers and Chemical Engineering
    • Giménez, D.M.1    Henning, G.P.2    Maravelias, C.T.3
  • 11
    • 52749096924 scopus 로고    scopus 로고
    • Flexible and configurable MILP-Models for Meltshop scheduling optimization
    • Braunschweig B., and Joulia X. (Eds), Elsevier Science Ltd.
    • Harjunkoski I., and Sand G. Flexible and configurable MILP-Models for Meltshop scheduling optimization. In: Braunschweig B., and Joulia X. (Eds). Computer-aided chemical engineering Vol. 25 (2008), Elsevier Science Ltd. 677-682
    • (2008) Computer-aided chemical engineering , vol.25 , pp. 677-682
    • Harjunkoski, I.1    Sand, G.2
  • 12
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes
    • Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling. 1. Multipurpose batch processes. Industrial and Engineering Chemistry Research 37 (1998) 4341-4359
    • (1998) Industrial and Engineering Chemistry Research , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 13
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: 3. Multiple intermediate due dates
    • Ierapetritou M.G., Hené T.S., and Floudas C.A. Effective continuous-time formulation for short-term scheduling: 3. Multiple intermediate due dates. Industrial and Engineering Chemistry Research 38 (1999) 3446-3461
    • (1999) Industrial and Engineering Chemistry Research , vol.38 , pp. 3446-3461
    • Ierapetritou, M.G.1    Hené, T.S.2    Floudas, C.A.3
  • 14
    • 38849197825 scopus 로고    scopus 로고
    • Improving unit-specific event based continuous-time approaches for batch processes: Integrality gap and task splitting
    • Janak S.L., and Floudas C.A. Improving unit-specific event based continuous-time approaches for batch processes: Integrality gap and task splitting. Computers and Chemical Engineering 32 (2008) 913-955
    • (2008) Computers and Chemical Engineering , vol.32 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 15
    • 33846049584 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling
    • Janak S.L., Floudas C.A., Kallrath J., and Vormbrock N. Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling. Industrial and Engineering Chemistry Research 25 (2006) 8234-8252
    • (2006) Industrial and Engineering Chemistry Research , vol.25 , pp. 8234-8252
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 17
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies
    • Janak S.L., Lin X., and Floudas C.A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: Resource constraints and mixed storage policies. Industrial and Engineering Chemistry Research 43 (2004) 2516-2533
    • (2004) Industrial and Engineering Chemistry Research , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 18
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-I. MILP formulation
    • Kondili E., Pantelides C.C., and Sargent W.H. A general algorithm for short-term scheduling of batch operations-I. MILP formulation. Computers and Chemical Engineering 17 (1993) 211-227
    • (1993) Computers and Chemical Engineering , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, W.H.3
  • 19
    • 0037635200 scopus 로고    scopus 로고
    • A new general continuous-time state task network formulation for the short-term scheduling of multipurpose batch plants
    • Maravelias C.T., and Grossmann I.E. A new general continuous-time state task network formulation for the short-term scheduling of multipurpose batch plants. Industrial and Engineering Chemistry Research 42 (2003) 3056-3074
    • (2003) Industrial and Engineering Chemistry Research , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 20
    • 68549136884 scopus 로고    scopus 로고
    • A general continuous state task network formulation for short term scheduling of multipurpose batch plants with due dates
    • Chen B., and Westerberg A. (Eds), Elsevier Science Ltd.
    • Maravelias C.T., and Grossmann I.E. A general continuous state task network formulation for short term scheduling of multipurpose batch plants with due dates. In: Chen B., and Westerberg A. (Eds). Computer-aided chemical engineering Vol. 15A (2003), Elsevier Science Ltd. 274-279
    • (2003) Computer-aided chemical engineering , vol.15 A , pp. 274-279
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 22
    • 0032997426 scopus 로고    scopus 로고
    • Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation
    • Mockus L., and Reklaitis G.V. Continuous time representation approach to batch and continuous process scheduling. 1. MINLP formulation. Industrial and Engineering Chemistry Research 38 (1999) 197-203
    • (1999) Industrial and Engineering Chemistry Research , vol.38 , pp. 197-203
    • Mockus, L.1    Reklaitis, G.V.2
  • 23
    • 0000763707 scopus 로고
    • Unified frameworks for optimal process planning and scheduling
    • Cache Publications, New York pp. 253-274
    • Pantelides C.C. Unified frameworks for optimal process planning and scheduling. In foundations of computer-aided process operations (1994), Cache Publications, New York pp. 253-274
    • (1994) In foundations of computer-aided process operations
    • Pantelides, C.C.1
  • 25
    • 0031193217 scopus 로고    scopus 로고
    • Batch production and preventive maintenance scheduling under equipment failure uncertainty
    • Sanmartí E., Espuña A., and Puigjaner L. Batch production and preventive maintenance scheduling under equipment failure uncertainty. Computers and Chemical Engineering 21 (1997) 1157-1168
    • (1997) Computers and Chemical Engineering , vol.21 , pp. 1157-1168
    • Sanmartí, E.1    Espuña, A.2    Puigjaner, L.3
  • 26
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G., and Pantelides C.C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Computers and Chemical Engineering 20 (1996) S1221-S1226
    • (1996) Computers and Chemical Engineering , vol.20
    • Schilling, G.1    Pantelides, C.C.2
  • 27
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations-II. Computational issues
    • Shah N., Pantelides C.C., and Sargent W.H. A general algorithm for short-term scheduling of batch operations-II. Computational issues. Computers and Chemical Engineering 17 (1993) 229-244
    • (1993) Computers and Chemical Engineering , vol.17 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, W.H.3
  • 28
    • 15344346066 scopus 로고    scopus 로고
    • A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants
    • Sundaramoorthy A., and Karimi I.A. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants. Chemical Engineering Science 60 (2005) 2679-2702
    • (2005) Chemical Engineering Science , vol.60 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 29
    • 0030174820 scopus 로고    scopus 로고
    • The optimal operation of mixed production facilities-A general formulation and some approaches for the solution
    • Zhang X., and Sargent W.H. The optimal operation of mixed production facilities-A general formulation and some approaches for the solution. Computers and Chemical Engineering 20 (1996) 897-904
    • (1996) Computers and Chemical Engineering , vol.20 , pp. 897-904
    • Zhang, X.1    Sargent, W.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.