Volumn 68, Issue 1, 2012, Pages 36-53

A robust mathematical formulation for multipurpose batch plants

Author keywords

Batch plant; Continuous time; MILP; Multipurpose; Optimization; Scheduling

Indexed keywords

BATCH PLANTS; BINARY VARIABLES; COMPUTATIONAL PERFORMANCE; CONTINUOUS TIME; CONTINUOUS TIME MODELS; CONTINUOUS-TIME REPRESENTATION; INTERMEDIATE STATE; INTERMEDIATE STORAGE; MATERIAL TRANSFERS; MATHEMATICAL FORMULATION; MILP; MULTI-GRID; MULTIPURPOSE; MULTIPURPOSE BATCH PLANTS; NETWORK REPRESENTATION; NON-SIMULTANEOUS; NUMERICAL EVALUATIONS; PROBLEM SIZE; SCHEDULING MODELS; SCHEDULING TECHNIQUES; SPECIFIC TIME; STATE SEQUENCES; TIME POINTS;

EID: 81055157692     PISSN: 00092509     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ces.2011.08.050     Document Type: Article
Times cited : (63)

References (53)
  • 1
    • 0346101524 scopus 로고    scopus 로고
    • Simple continuous-time formulation for short-term scheduling of batch and continuous processes
    • Castro P.M., Barbosa-Povóa A.P., Matos H.A., Novais A.Q. Simple continuous-time formulation for short-term scheduling of batch and continuous processes. Ind. Eng. Chem. Res. 2004, 43:105-118.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , pp. 105-118
    • Castro, P.M.1    Barbosa-Povóa, A.P.2    Matos, H.A.3    Novais, A.Q.4
  • 2
    • 40449111439 scopus 로고    scopus 로고
    • Slot-based formulation for the short-term scheduling of multistage, multiproduct batch plants with sequence-dependent changeovers
    • Erdirik-Dogan M., Grossmann I.E. Slot-based formulation for the short-term scheduling of multistage, multiproduct batch plants with sequence-dependent changeovers. Ind. Eng. Chem. Res. 2008, 47:1159-1163.
    • (2008) Ind. Eng. Chem. Res. , vol.47 , pp. 1159-1163
    • Erdirik-Dogan, M.1    Grossmann, I.E.2
  • 4
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
    • Floudas C.A., Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Comput. Chem. Eng. 2004, 28:2109-2129.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2109-2129
    • Floudas, C.A.1    Lin, X.2
  • 5
    • 0016619730 scopus 로고
    • Improved linear integer programming formulations of nonlinear integer problems
    • Glover F. Improved linear integer programming formulations of nonlinear integer problems. Manage. Sci. 1975, 22:455-460.
    • (1975) Manage. Sci. , vol.22 , pp. 455-460
    • Glover, F.1
  • 6
    • 0037419775 scopus 로고    scopus 로고
    • Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storage
    • Gupta S., Karimi I.A. Scheduling a two-stage multiproduct process with limited product shelf life in intermediate storage. Ind. Eng. Chem. Res. 2003, 42:490-508.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 490-508
    • Gupta, S.1    Karimi, I.A.2
  • 7
    • 0037503184 scopus 로고    scopus 로고
    • An improved MILP formulation for scheduling multiproduct, multistage batch plants
    • Gupta S., Karimi I.A. An improved MILP formulation for scheduling multiproduct, multistage batch plants. Ind. Eng. Chem. Res. 2003, 42:2365-2380.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 2365-2380
    • Gupta, S.1    Karimi, I.A.2
  • 8
    • 0034661353 scopus 로고    scopus 로고
    • A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants
    • Hui C.W., Gupta A. A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants. Comput. Chem. Eng. 2000, 24:2705-2717.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2705-2717
    • Hui, C.W.1    Gupta, A.2
  • 9
    • 0032216021 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes
    • Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling: 1. Multipurpose batch processes. Ind. Eng. Chem. Res. 1998, 37:4341-4359.
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4341-4359
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 10
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: 2. Continuous and semi-continuous processes
    • Ierapetritou M.G., Floudas C.A. Effective continuous-time formulation for short-term scheduling: 2. Continuous and semi-continuous processes. Ind. Eng. Chem. Res. 1998, 37:4360-4374.
    • (1998) Ind. Eng. Chem. Res. , vol.37 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 11
    • 2442436591 scopus 로고    scopus 로고
    • Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies
    • Janak S.L., Lin X., Floudas C.A. Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies. Ind. Eng. Chem. Res. 2004, 43:2516-2533.
    • (2004) Ind. Eng. Chem. Res. , vol.43 , pp. 2516-2533
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 12
    • 38849197825 scopus 로고    scopus 로고
    • Improving unit-specific event based continuous time approaches for batch processes: integrality gap and task splitting
    • Janak S.L., Floudas C.A. Improving unit-specific event based continuous time approaches for batch processes: integrality gap and task splitting. Comput. Chem. Eng. 2008, 32:913-955.
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 913-955
    • Janak, S.L.1    Floudas, C.A.2
  • 13
    • 33846049584 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling
    • Janak S.L., Floudas C.A., Kallrath J., Vormbrock N. Production scheduling of a large-scale industrial batch plant. I. Short-term and medium-term scheduling. Ind. Eng. Chem. Res. 2006, 45:8234-8252.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 8234-8252
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 14
    • 33846071077 scopus 로고    scopus 로고
    • Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling
    • Janak S.L., Floudas C.A., Kallrath J., Vormbrock N. Production scheduling of a large-scale industrial batch plant. II. Reactive scheduling. Ind. Eng. Chem. Res. 2006, 45:8253-8269.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 8253-8269
    • Janak, S.L.1    Floudas, C.A.2    Kallrath, J.3    Vormbrock, N.4
  • 15
    • 11844290763 scopus 로고    scopus 로고
    • Comments on "Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies"
    • Janak S.L., Lin X., Floudas C.A. Comments on "Enhanced continuous-time unit-specific event-based formulation for short-term scheduling of multipurpose batch processes: resource constraints and mixed storage policies". Ind. Eng. Chem. Res. 2005, 44:426.
    • (2005) Ind. Eng. Chem. Res. , vol.44 , pp. 426
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 16
    • 33845624253 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: II. Uncertainty with known probability distribution
    • Janak S.L., Lin X., Floudas C.A. A new robust optimization approach for scheduling under uncertainty: II. Uncertainty with known probability distribution. Comput. Chem. Eng. 2007, 31:171-195.
    • (2007) Comput. Chem. Eng. , vol.31 , pp. 171-195
    • Janak, S.L.1    Lin, X.2    Floudas, C.A.3
  • 17
    • 0031186347 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. II. Short-term scheduling
    • Karimi I.A., McDonald C.M. Planning and scheduling of parallel semicontinuous processes. II. Short-term scheduling. Ind. Eng. Chem. Res. 1997, 36:2701-2714.
    • (1997) Ind. Eng. Chem. Res. , vol.36 , pp. 2701-2714
    • Karimi, I.A.1    McDonald, C.M.2
  • 18
    • 0027545176 scopus 로고
    • A general algorithm for short-term scheduling of batch operations. I. MILP formulation
    • Kondili E., Pantelides C.C., Sargent R.W.H. A general algorithm for short-term scheduling of batch operations. I. MILP formulation. Comput. Chem. Eng. 1993, 17:211-227.
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 211-227
    • Kondili, E.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 19
    • 79955548378 scopus 로고    scopus 로고
    • Optimal event point determination for short-term scheduling of multipurpose batch plants via unit-specific event-based continuous-time approaches
    • Li Jie, Floudas C.A. Optimal event point determination for short-term scheduling of multipurpose batch plants via unit-specific event-based continuous-time approaches. Ind. Eng. Chem. Res. 2010, 49:7446-7469.
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 7446-7469
    • Li, J.1    Floudas, C.A.2
  • 20
    • 75249090444 scopus 로고    scopus 로고
    • An analysis of some unit-specific event-based models for the short-term scheduling of non-continuous processes
    • Li Jie, Susarla N., Karimi I.A., Shaik M., Floudas C.A. An analysis of some unit-specific event-based models for the short-term scheduling of non-continuous processes. Ind. Eng. Chem. Res. 2010, 49:633-647.
    • (2010) Ind. Eng. Chem. Res. , vol.49 , pp. 633-647
    • Li, J.1    Susarla, N.2    Karimi, I.A.3    Shaik, M.4    Floudas, C.A.5
  • 21
    • 0037138682 scopus 로고    scopus 로고
    • Scheduling parallel production lines with resource constraints. I. Model formulation
    • Lamba N., Karimi I.A. Scheduling parallel production lines with resource constraints. I. Model formulation. Ind. Eng. Chem. Res. 2002, 41:779-789.
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 779-789
    • Lamba, N.1    Karimi, I.A.2
  • 22
    • 0037138595 scopus 로고    scopus 로고
    • Scheduling parallel production lines with resource constraints. II. Decomposition algorithm
    • Lamba N., Karimi I.A. Scheduling parallel production lines with resource constraints. II. Decomposition algorithm. Ind. Eng. Chem. Res. 2002, 41:790-800.
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 790-800
    • Lamba, N.1    Karimi, I.A.2
  • 23
    • 0346734333 scopus 로고    scopus 로고
    • Resource-constrained scheduling of parallel production lines using asynchronous slots
    • Lim M.F., Karimi I.A. Resource-constrained scheduling of parallel production lines using asynchronous slots. Ind. Eng. Chem. Res. 2003, 42:6832-6842.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 6832-6842
    • Lim, M.F.1    Karimi, I.A.2
  • 24
    • 0035340986 scopus 로고    scopus 로고
    • Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation
    • Lin X., Floudas C.A. Design, synthesis and scheduling of multipurpose batch plants via an effective continuous-time formulation. Comput. Chem. Eng. 2001, 25:665-674.
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 665-674
    • Lin, X.1    Floudas, C.A.2
  • 25
    • 0037036735 scopus 로고    scopus 로고
    • Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant
    • Lin X., Floudas C.A., Modi S., Juhasz N.M. Continuous-time optimization approach for medium-range production scheduling of a multiproduct batch plant. Ind. Eng. Chem. Res. 2002, 41:3884-3906.
    • (2002) Ind. Eng. Chem. Res. , vol.41 , pp. 3884-3906
    • Lin, X.1    Floudas, C.A.2    Modi, S.3    Juhasz, N.M.4
  • 26
    • 1942532282 scopus 로고    scopus 로고
    • A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty
    • Lin X., Janak S.L., Floudas C.A. A new robust optimization approach for scheduling under uncertainty: I. Bounded uncertainty. Comput. Chem. Eng. 2004, 28:1069-1085.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 1069-1085
    • Lin, X.1    Janak, S.L.2    Floudas, C.A.3
  • 27
    • 34548483161 scopus 로고    scopus 로고
    • Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel units
    • Liu Y., Karimi I.A. Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel units. Comput. Chem. Eng. 2007, 31:1671-1693.
    • (2007) Comput. Chem. Eng. , vol.31 , pp. 1671-1693
    • Liu, Y.1    Karimi, I.A.2
  • 28
    • 33846785064 scopus 로고    scopus 로고
    • Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storage
    • Liu Y., Karimi I.A. Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storage. Chem. Eng. Sci. 2007, 62:1549-1566.
    • (2007) Chem. Eng. Sci. , vol.62 , pp. 1549-1566
    • Liu, Y.1    Karimi, I.A.2
  • 29
    • 38849188495 scopus 로고    scopus 로고
    • Scheduling multistage batch plants with parallel units and no interstage storage
    • Liu Y., Karimi I.A. Scheduling multistage batch plants with parallel units and no interstage storage. Comput. Chem. Eng. 2008, 32:671-693.
    • (2008) Comput. Chem. Eng. , vol.32 , pp. 671-693
    • Liu, Y.1    Karimi, I.A.2
  • 30
    • 0035852008 scopus 로고    scopus 로고
    • A novel continuous-time MILP Formulation for multipurpose bach plants
    • Majozi T., Zhu X.X. A novel continuous-time MILP Formulation for multipurpose bach plants. Ind. Eng. Chem. Res. 2001, 40:5935-5949.
    • (2001) Ind. Eng. Chem. Res. , vol.40 , pp. 5935-5949
    • Majozi, T.1    Zhu, X.X.2
  • 31
    • 0037635200 scopus 로고    scopus 로고
    • New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants
    • Maravelias C.T., Grossmann I.E. New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants. Ind. Eng. Chem. Res. 2003, 42:3056-3074.
    • (2003) Ind. Eng. Chem. Res. , vol.42 , pp. 3056-3074
    • Maravelias, C.T.1    Grossmann, I.E.2
  • 32
    • 0031188902 scopus 로고    scopus 로고
    • Planning and scheduling of parallel semicontinuous processes. I. Production planning
    • McDonald C.M., Karimi I.A. Planning and scheduling of parallel semicontinuous processes. I. Production planning. Ind. Eng. Chem. Res. 1997, 36:2691-2700.
    • (1997) Ind. Eng. Chem. Res. , vol.36 , pp. 2691-2700
    • McDonald, C.M.1    Karimi, I.A.2
  • 33
    • 33748102266 scopus 로고    scopus 로고
    • State of-the-art review of optimization methods for short-term scheduling of batch processes
    • Méndez C.A., Cerdá J., Grossmann I.E., Harjunkoski I., Fahl M. State of-the-art review of optimization methods for short-term scheduling of batch processes. Comput. Chem. Eng. 2006, 30:913-946.
    • (2006) Comput. Chem. Eng. , vol.30 , pp. 913-946
    • Méndez, C.A.1    Cerdá, J.2    Grossmann, I.E.3    Harjunkoski, I.4    Fahl, M.5
  • 34
    • 0343627890 scopus 로고    scopus 로고
    • Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end product facilities
    • Méndez C.A., Cerdá J. Optimal scheduling of a resource-constrained multiproduct batch plant supplying intermediates to nearby end product facilities. Comput. Chem. Eng. 2000, 24:369-376.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 369-376
    • Méndez, C.A.1    Cerdá, J.2
  • 35
    • 2442495043 scopus 로고    scopus 로고
    • An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies
    • Méndez C.A., Cerdá J. An MILP continuous-time framework for short-term scheduling of multipurpose batch processes under different operation strategies. Optim. Eng. 2003, 4:7-22.
    • (2003) Optim. Eng. , vol.4 , pp. 7-22
    • Méndez, C.A.1    Cerdá, J.2
  • 36
    • 0034307307 scopus 로고    scopus 로고
    • Optimal scheduling of batch plants satisfying multiple product orders with different due-dates
    • Méndez C.A., Henning G.P., Cerdá J. Optimal scheduling of batch plants satisfying multiple product orders with different due-dates. Comput. Chem. Eng. 2000, 24:2223-2245.
    • (2000) Comput. Chem. Eng. , vol.24 , pp. 2223-2245
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 37
    • 0035339828 scopus 로고    scopus 로고
    • An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • Méndez C.A., Henning G.P., Cerdá J. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Comput. Chem. Eng. 2001, 25:701-711.
    • (2001) Comput. Chem. Eng. , vol.25 , pp. 701-711
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 38
    • 33748120584 scopus 로고    scopus 로고
    • Short-term scheduling of multistage batch processes subject to limited finite resources
    • Méndez C.A., Cerdá J. Short-term scheduling of multistage batch processes subject to limited finite resources. Comput. Aided Chem. Eng. 2004, 15B:984-989.
    • (2004) Comput. Aided Chem. Eng. , vol.15 B , pp. 984-989
    • Méndez, C.A.1    Cerdá, J.2
  • 39
    • 0031190611 scopus 로고    scopus 로고
    • Mathematical programming formulation for scheduling of batch operations based on non-uniform time discretization
    • Mockus L., Reklaitis Mathematical programming formulation for scheduling of batch operations based on non-uniform time discretization. Comput. Chem. Eng. 1997, 21:1147-1156.
    • (1997) Comput. Chem. Eng. , vol.21 , pp. 1147-1156
    • Mockus, L.1    Reklaitis2
  • 40
    • 0028500039 scopus 로고
    • Optimal cyclic scheduling of multistage continuous multiproduct plants
    • Pinto J.M., Grossmann I.E. Optimal cyclic scheduling of multistage continuous multiproduct plants. Comput. Chem. Eng. 1994, 18:797-816.
    • (1994) Comput. Chem. Eng. , vol.18 , pp. 797-816
    • Pinto, J.M.1    Grossmann, I.E.2
  • 41
    • 0001690679 scopus 로고
    • A continuous-time mixed-integer linear programming model for short-term scheduling of multistage batch plants
    • Pinto J.M., Grossmann I.E. A continuous-time mixed-integer linear programming model for short-term scheduling of multistage batch plants. Ind. Eng. Chem. Res. 1995, 34:3037-3051.
    • (1995) Ind. Eng. Chem. Res. , vol.34 , pp. 3037-3051
    • Pinto, J.M.1    Grossmann, I.E.2
  • 42
    • 1642331599 scopus 로고    scopus 로고
    • A new continuous-time formulation for scheduling crude oil operations
    • Reddy P.C.P., Karimi I.A., Srinivasan R. A new continuous-time formulation for scheduling crude oil operations. Chem. Eng. Sci. 2004, 59:1325-1341.
    • (2004) Chem. Eng. Sci. , vol.59 , pp. 1325-1341
    • Reddy, P.C.P.1    Karimi, I.A.2    Srinivasan, R.3
  • 43
    • 0026108226 scopus 로고
    • MINLP model for cyclic multiproduct scheduling on continuous parallel lines
    • Sahinidis N.V., Grossmann I.E. MINLP model for cyclic multiproduct scheduling on continuous parallel lines. Comput. Chem. Eng. 1991, 15:85-103.
    • (1991) Comput. Chem. Eng. , vol.15 , pp. 85-103
    • Sahinidis, N.V.1    Grossmann, I.E.2
  • 44
    • 0029717404 scopus 로고    scopus 로고
    • A simple continuous-time process scheduling formulation and a novel solution algorithm
    • Schilling G., Pantelides C. A simple continuous-time process scheduling formulation and a novel solution algorithm. Comput. Chem. Eng. 1996, 20:1221-1226.
    • (1996) Comput. Chem. Eng. , vol.20 , pp. 1221-1226
    • Schilling, G.1    Pantelides, C.2
  • 45
    • 0027545175 scopus 로고
    • A general algorithm for short-term scheduling of batch operations II. Computational issues
    • Shah N., Pantelides C.C., Sargent R.W.H. A general algorithm for short-term scheduling of batch operations II. Computational issues. Comput. Chem. Eng. 1993, 17:229-244.
    • (1993) Comput. Chem. Eng. , vol.17 , pp. 229-244
    • Shah, N.1    Pantelides, C.C.2    Sargent, R.W.H.3
  • 46
    • 33947498929 scopus 로고    scopus 로고
    • Improved unit-specific event-based model continuous-time model for short-term scheduling of continuous processes: rigorous treatment of storage requirements
    • Shaik M.A., Floudas C.A. Improved unit-specific event-based model continuous-time model for short-term scheduling of continuous processes: rigorous treatment of storage requirements. Ind. Eng. Chem. Res. 2007, 46:1764-1779.
    • (2007) Ind. Eng. Chem. Res. , vol.46 , pp. 1764-1779
    • Shaik, M.A.1    Floudas, C.A.2
  • 47
    • 65349119397 scopus 로고    scopus 로고
    • Novel unified modeling approach for short term scheduling
    • Shaik M., Floudas C. Novel unified modeling approach for short term scheduling. Ind. Eng. Chem. Res. 2009, 48:2947-2964.
    • (2009) Ind. Eng. Chem. Res. , vol.48 , pp. 2947-2964
    • Shaik, M.1    Floudas, C.2
  • 48
    • 35549009402 scopus 로고    scopus 로고
    • Unit-specific event-based continuous time approach for short-term scheduling of batch plants using RTN framework
    • Shaik M.A., Floudas C.A. Unit-specific event-based continuous time approach for short-term scheduling of batch plants using RTN framework. Comput. Chem. Eng. 32 2008, 260-274.
    • (2008) Comput. Chem. Eng. 32 , pp. 260-274
    • Shaik, M.A.1    Floudas, C.A.2
  • 49
    • 33748760882 scopus 로고    scopus 로고
    • Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study
    • Shaik M.A., Janak S.L., Floudas C.A. Continuous-time models for short-term scheduling of multipurpose batch plants: a comparative study. Ind. Eng. Chem. Res. 2006, 45:6190-6209.
    • (2006) Ind. Eng. Chem. Res. , vol.45 , pp. 6190-6209
    • Shaik, M.A.1    Janak, S.L.2    Floudas, C.A.3
  • 50
    • 15344346066 scopus 로고    scopus 로고
    • A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants
    • Sundaramoorthy A., Karimi I.A. A simpler better slot-based continuous-time formulation for short-term scheduling in multipurpose batch plants. Chem. Eng. Sci. 2005, 60:2679-2702.
    • (2005) Chem. Eng. Sci. , vol.60 , pp. 2679-2702
    • Sundaramoorthy, A.1    Karimi, I.A.2
  • 51
    • 77955820606 scopus 로고    scopus 로고
    • A novel approach to scheduling of multipurpose batch plants using unit slots
    • Susarla N., Li J., Karimi I.A. A novel approach to scheduling of multipurpose batch plants using unit slots. A.I.Ch.E. J. 2010, 56:1859-1879.
    • (2010) A.I.Ch.E. J. , vol.56 , pp. 1859-1879
    • Susarla, N.1    Li, J.2    Karimi, I.A.3
  • 52
    • 4143112202 scopus 로고    scopus 로고
    • Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation
    • Wu D., Ierapetritou M. Cyclic short-term scheduling of multiproduct batch plants using continuous-time representation. Comput. Chem. Eng. 2004, 28:2271-2286.
    • (2004) Comput. Chem. Eng. , vol.28 , pp. 2271-2286
    • Wu, D.1    Ierapetritou, M.2
  • 53
    • 0030174820 scopus 로고    scopus 로고
    • The optimal operation of mixed production facilities-a general formulation and some approaches for the solution
    • Zhang X., Sargent R.W.H. The optimal operation of mixed production facilities-a general formulation and some approaches for the solution. Comput. Chem. Eng. 1996, 20:897-904.
    • (1996) Comput. Chem. Eng. , vol.20 , pp. 897-904
    • Zhang, X.1    Sargent, R.W.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.