-
2
-
-
82255188681
-
-
(accessed on 24 September 2014)
-
United States Department of Labor. Bureau of Labor Statistics. Available online: http://www.bls.gov/(accessed on 24 September 2014).
-
Bureau of Labor Statistics
-
-
-
3
-
-
3242876277
-
Project management under uncertainty: The impact of heuristics and biases
-
McCray, G.E.; Purvis, R.L. Project management under uncertainty: The impact of heuristics and biases. Proj. Manag. J. 2002, 33, 49-57.
-
(2002)
Proj. Manag. J
, vol.33
, pp. 49-57
-
-
McCray, G.E.1
Purvis, R.L.2
-
5
-
-
84986127808
-
A systematic approach to risk management for construction
-
Mills, A. A systematic approach to risk management for construction. Struct. Surv. 2001, 19, 245-252.
-
(2001)
Struct. Surv
, vol.19
, pp. 245-252
-
-
Mills, A.1
-
6
-
-
0004436232
-
Planning repetitive construction: Current practice
-
Lutz, J.D.; Hijazi, A. Planning repetitive construction: Current practice. Constr. Manag. Econ. 1993, 11, 99-110.
-
(1993)
Constr. Manag. Econ
, vol.11
, pp. 99-110
-
-
Lutz, J.D.1
Hijazi, A.2
-
10
-
-
0001242198
-
Estimating variance of output from cyclic exponential queueing systems
-
Duenyas, I.; Hopp, W.J. Estimating variance of output from cyclic exponential queueing systems. Queueing Syst. 1990, 7, 337-353.
-
(1990)
Queueing Syst
, vol.7
, pp. 337-353
-
-
Duenyas, I.1
Hopp, W.J.2
-
11
-
-
84959024091
-
-
Irwin McGraw-Hill: New York, NY, USA, 2nd ed
-
Hopp, W.J.; Spearman, M.L. Factory Physics: Foundations of Manufacturing Management, 2nd ed.; Irwin McGraw-Hill: New York, NY, USA, 1996; p. 726.
-
(1996)
Factory Physics: Foundations of Manufacturing Management
, pp. 726
-
-
Hopp, W.J.1
Spearman, M.L.2
-
13
-
-
0000834220
-
Simulation of nonsteady construction processes
-
Bernold, L.E. Simulation of nonsteady construction processes. J. Constr. Eng. Manag. 1989, 115, 163-178.
-
(1989)
J. Constr. Eng. Manag
, vol.115
, pp. 163-178
-
-
Bernold, L.E.1
-
15
-
-
33847109286
-
Production equations for unsteady-state construction processes
-
Walsh, K.D.; Sawhney, A.; Bashford, H.H. Production equations for unsteady-state construction processes. J. Constr. Eng. Manag. 2007, 133, 245-261.
-
(2007)
J. Constr. Eng. Manag
, vol.133
, pp. 245-261
-
-
Walsh, K.D.1
Sawhney, A.2
Bashford, H.H.3
-
17
-
-
0003463029
-
-
Harper Perennial: New York, NY, USA
-
Womack, J.P.; Jones, D.T.; Roos, D. The Machine that Changed the World; Harper Perennial: New York, NY, USA, 1991; p. 323.
-
(1991)
The Machine that Changed the World
, pp. 323
-
-
Womack, J.P.1
Jones, D.T.2
Roos, D.3
-
20
-
-
0025437152
-
Practical strategies for lead time reduction
-
Hopp, W.J.; Spearman, M.L.; Woodruff, D.L. Practical strategies for lead time reduction. Manuf. Rev. 1990, 3, 1-15.
-
(1990)
Manuf. Rev
, vol.3
, pp. 1-15
-
-
Hopp, W.J.1
Spearman, M.L.2
Woodruff, D.L.3
-
21
-
-
0025494698
-
Machine maintenance with multiple maintenance actions
-
Hopp, W.J.; Wu, S.-C. Machine maintenance with multiple maintenance actions. IIE Trans. 1990, 22, 226-233.
-
(1990)
IIE Trans
, vol.22
, pp. 226-233
-
-
Hopp, W.J.1
Wu, S.-C.2
-
22
-
-
0025430443
-
CONWIP-A pull alternative to Kanban
-
Spearman, M.L.; Woodruff, D.L.; Hopp, W.J. CONWIP-A pull alternative to Kanban. Int. J. Prod. Res. 1990, 28, 879-894.
-
(1990)
Int. J. Prod. Res
, vol.28
, pp. 879-894
-
-
Spearman, M.L.1
Woodruff, D.L.2
Hopp, W.J.3
-
23
-
-
0003228793
-
Availability and average inventory of balanced assembly-like flow systems
-
Simon, J.T.; Hopp, W.J. Availability and average inventory of balanced assembly-like flow systems. IIE Trans. 1991, 23, 161-168.
-
(1991)
IIE Trans
, vol.23
, pp. 161-168
-
-
Simon, J.T.1
Hopp, W.J.2
-
24
-
-
0041308344
-
-
Wakefield, R.R., Carmichael, D.G., Eds.; Institution of Engineers: Sydney, Australia, Sydney, Australia, 17-18 February 1994
-
Koskela, L. In Proceedings of the Lean Construction, National Construction and Management Conference, Sydney, Australia, 17-18 February 1994; Wakefield, R.R., Carmichael, D.G., Eds.; Institution of Engineers: Sydney, Australia, 1994; pp. 205-217.
-
(1994)
Proceedings of the Lean Construction, National Construction and Management Conference
, pp. 205-217
-
-
Koskela, L.1
-
25
-
-
84959024093
-
-
Project Management Institute: Newtown Square, PA, USA, 2nd ed
-
Project Management Institute. Construction Extension to the Pmbok Guide Third Edition, 2nd ed.; Project Management Institute: Newtown Square, PA, USA, 2007; p. 208.
-
(2007)
Construction Extension to the Pmbok Guide Third Edition
, pp. 208
-
-
-
26
-
-
0030406151
-
Construction waste: Quantification and source evaluation
-
Bossink, B.; Brouwers, H. Construction waste: Quantification and source evaluation. J. Constr. Eng. Manag. 1996, 122, 55-60.
-
(1996)
J. Constr. Eng. Manag
, vol.122
, pp. 55-60
-
-
Bossink, B.1
Brouwers, H.2
-
27
-
-
85042808941
-
Construction management: Added value or added cost?
-
Hoffman, T.L. Construction management: Added value or added cost? J. Prop. Manag. 1998, 63, 6531300.
-
(1998)
J. Prop. Manag
, vol.63
-
-
Hoffman, T.L.1
-
28
-
-
0000575583
-
The productivity slowdown, measurement issues, and the explosion of computer power
-
Baily, M.N.; Gordon, R.J.; Nordhaus, W.D.; Romer, D. The productivity slowdown, measurement issues, and the explosion of computer power. Brook. Papers Econ. Act. 1988, 19, 347-431.
-
(1988)
Brook. Papers Econ. Act
, vol.19
, pp. 347-431
-
-
Baily, M.N.1
Gordon, R.J.2
Nordhaus, W.D.3
Romer, D.4
-
29
-
-
84901625185
-
Overlapping design and construction activities and an optimization approach to minimize rework
-
Hossain, M.A.; Chua, D.K.H. Overlapping design and construction activities and an optimization approach to minimize rework. Int. J. Proj. Manag. 2014, 32, 983-994.
-
(2014)
Int. J. Proj. Manag
, vol.32
, pp. 983-994
-
-
Hossain, M.A.1
Chua, D.K.H.2
-
30
-
-
84956505291
-
-
Springer: Berlin/Heidelberg, Germany
-
Li, R.Y.M.; Poon, S.W. Construction Safety; Springer: Berlin/Heidelberg, Germany, 2013; p. 161.
-
(2013)
Construction Safety
, pp. 161
-
-
Li, R.Y.M.1
Poon, S.W.2
-
31
-
-
58049139009
-
-
Project Management Institute: Newtown Square, PA, USA, 5th ed
-
Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide), 5th ed.; Project Management Institute: Newtown Square, PA, USA, 2013; p. 616.
-
(2013)
A Guide to the Project Management Body of Knowledge (Pmbok Guide)
, pp. 616
-
-
-
32
-
-
84959024096
-
-
Project Management Institute: Newtown Square, PA, USA, 1st ed
-
Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide), 1st ed.; Project Management Institute: Newtown Square, PA, USA, 1996; p. 182.
-
(1996)
A Guide to the Project Management Body of Knowledge (Pmbok Guide)
, pp. 182
-
-
-
33
-
-
84959024097
-
-
International Project Management Association: Nijkerk, The Netherlands, 3rd ed
-
International Project Management Association. IPMA Competence Baseline Version 3.0, 3rd ed.; International Project Management Association: Nijkerk, The Netherlands, 2006; p. 212.
-
(2006)
IPMA Competence Baseline Version 3.0
, pp. 212
-
-
-
34
-
-
84959024098
-
-
The Stationery Office: London, UK, 5th ed
-
Office of Government Commerce. Managing Successful Projects with Prince2, 5th ed.; The Stationery Office: London, UK, 2009; p. 346.
-
(2009)
Managing Successful Projects with Prince2
, pp. 346
-
-
-
35
-
-
78650256578
-
Scheduling model for repetitive construction processes for high-rise buildings
-
Cho, K.; Hong, T.; Hyun, C. Scheduling model for repetitive construction processes for high-rise buildings. Can. J. Civil Eng. 2010, 38, 36-48.
-
(2010)
Can. J. Civil Eng
, vol.38
, pp. 36-48
-
-
Cho, K.1
Hong, T.2
Hyun, C.3
-
36
-
-
84958977100
-
Optimal scheduling for repetitive construction projects with multiple resource crews
-
Bhoyar, S.; Parbat, D.K. Optimal scheduling for repetitive construction projects with multiple resource crews. Int. J. Emerg. Technol. Adv. Eng. 2014, 4, 302-307.
-
(2014)
Int. J. Emerg. Technol. Adv. Eng
, vol.4
, pp. 302-307
-
-
Bhoyar, S.1
Parbat, D.K.2
-
37
-
-
0032645520
-
Parade game: Impact of work flow variability on trade performance
-
Tommelein, I.; Riley, D.; Howell, G. Parade game: Impact of work flow variability on trade performance. J. Constr. Eng. Manag. 1999, 125, 304-310.
-
(1999)
J. Constr. Eng. Manag
, vol.125
, pp. 304-310
-
-
Tommelein, I.1
Riley, D.2
Howell, G.3
-
38
-
-
2342441450
-
Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule
-
Berkeley, CA, USA, 26-28 July
-
Alarcon, L.F.; Ashley, D.B. Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule. In Proceedings of the IGLC-7, Berkeley, CA, USA, 26-28 July 1999; pp. 263-274.
-
(1999)
Proceedings of the IGLC-7
, pp. 263-274
-
-
Alarcon, L.F.1
Ashley, D.B.2
-
39
-
-
0036923474
-
Lean Construction and Simulation
-
San Diego, CA, USA, 8-11 December
-
Halpin, D.W.; Kueckmann, M. Lean Construction and Simulation. In Proceedings of the 2002 Winter Simulation Conference, San Diego, CA, USA, 8-11 December 2002; pp. 1697-1703.
-
(2002)
Proceedings of the 2002 Winter Simulation Conference
, pp. 1697-1703
-
-
Halpin, D.W.1
Kueckmann, M.2
-
40
-
-
85060993103
-
A bridge between increasing reliability and reducing variability in construction work flow: A fuzzy-based sizing buffer model
-
Farag, M.A.M. A bridge between increasing reliability and reducing variability in construction work flow: A fuzzy-based sizing buffer model. J. Adv. Manag. Sci. 2014, 2, 287-294.
-
(2014)
J. Adv. Manag. Sci
, vol.2
, pp. 287-294
-
-
Farag, M.A.M.1
-
41
-
-
33748155228
-
Intelligence approach to production planning system for bespoke precast concrete products
-
Benjaoran, V.; Dawood, N. Intelligence approach to production planning system for bespoke precast concrete products. Autom. Constr. 2006, 15, 737-745.
-
(2006)
Autom. Constr
, vol.15
, pp. 737-745
-
-
Benjaoran, V.1
Dawood, N.2
-
42
-
-
0025694102
-
Modeling construction labor productivity
-
Thomas, H.R.; Maloney, W.F.; Horner, R.M.W.; Smith, G.R.; Handa, V.K.; Sanders, S.R. Modeling construction labor productivity. J. Constr. Eng. Manag.1990, 116, 705-726.
-
(1990)
J. Constr. Eng. Manag
, vol.116
, pp. 705-726
-
-
Thomas, H.R.1
Maloney, W.F.2
Horner, R.M.W.3
Smith, G.R.4
Handa, V.K.5
Sanders, S.R.6
-
43
-
-
0022779734
-
Linear scheduling using optimal control theory
-
Handa, M.V.K.; Barcia, R.M. Linear scheduling using optimal control theory. J. Constr. Eng. Manag. 1986, 112, 387-393.
-
(1986)
J. Constr. Eng. Manag
, vol.112
, pp. 387-393
-
-
Handa, M.V.K.1
Barcia, R.M.2
-
44
-
-
12344273517
-
Production system loading-cycle time relationship in residential construction
-
Bashford, H.H.; Walsh, K.D.; Sawhney, A. Production system loading-cycle time relationship in residential construction. J. Constr. Eng. Manag. 2005, 131, 15-22.
-
(2005)
J. Constr. Eng. Manag
, vol.131
, pp. 15-22
-
-
Bashford, H.H.1
Walsh, K.D.2
Sawhney, A.3
-
45
-
-
84879670010
-
Integrated methodology to design and manage work-in-process buffers in repetitive building projects
-
Gonzalez, V.; Alarcon, L.F.; Yiu, T.W. Integrated methodology to design and manage work-in-process buffers in repetitive building projects. J. Oper. Res. Soc. 2013, 64, 1182-1193.
-
(2013)
J. Oper. Res. Soc
, vol.64
, pp. 1182-1193
-
-
Gonzalez, V.1
Alarcon, L.F.2
Yiu, T.W.3
-
46
-
-
57649231503
-
Multiobjective design of work-in-process buffer for scheduling repetitive building projects
-
Gonzalez, V.; Alarcon, L.F.; Molenaar, K. Multiobjective design of work-in-process buffer for scheduling repetitive building projects. Autom. Constr. 2009, 18, 95-108.
-
(2009)
Autom. Constr
, vol.18
, pp. 95-108
-
-
Gonzalez, V.1
Alarcon, L.F.2
Molenaar, K.3
-
47
-
-
84958986853
-
-
(accessed on 27 October 2014)
-
American Society for Testing and Materials. Building Economics. Available online: http://www.astm.org (accessed on 27 October 2014).
-
Building Economics
-
-
-
48
-
-
84958966789
-
-
Blackwell Publishing: Malden, MA, USA, 2nd ed
-
Smith, N.J.; Merna, T.; Jobling, P. Managing Risk in Construction Projects, 2nd ed.; Blackwell Publishing: Malden, MA, USA, 2006; p. 257.
-
(2006)
Managing Risk in Construction Projects
, pp. 257
-
-
Smith, N.J.1
Merna, T.2
Jobling, P.3
-
49
-
-
84959024099
-
-
Association for Project Management: Buckinghamshire, UK, 5th ed
-
Association for Project Management. APM Body of Knowledge, 5th ed.; Association for Project Management: Buckinghamshire, UK, 2006; p. 197.
-
(2006)
APM Body of Knowledge
, pp. 197
-
-
-
50
-
-
0041620446
-
Project management strategy-Project management represented as a process based set of management domains and the consequences for project management strategy
-
Anderson, D.K.; Merna, T. Project management strategy-Project management represented as a process based set of management domains and the consequences for project management strategy. Int. J. Proj. Manag. 2003, 21, 387-393.
-
(2003)
Int. J. Proj. Manag
, vol.21
, pp. 387-393
-
-
Anderson, D.K.1
Merna, T.2
-
51
-
-
84959024100
-
-
Project Management Institute: Newtown Square, PA, USA, 3rd ed
-
Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide), 3rd ed.; Project Management Institute: Newtown Square, PA, USA, 2004; p. 405.
-
(2004)
A Guide to the Project Management Body of Knowledge (Pmbok Guide)
, pp. 405
-
-
-
52
-
-
0037367528
-
Re-engineering through pre-assembly: Client expectations and drivers
-
Gibb, A.; Isack, F. Re-engineering through pre-assembly: Client expectations and drivers. Build. Res. Inf. 2003, 31, 146-160.
-
(2003)
Build. Res. Inf
, vol.31
, pp. 146-160
-
-
Gibb, A.1
Isack, F.2
-
53
-
-
32144456186
-
Benefit evaluation for off-site production in construction
-
Blismas, N.; Pasquire, C.; Gibb, A. Benefit evaluation for off-site production in construction. Constr. Manag. Econ. 2006, 24, 121-130.
-
(2006)
Constr. Manag. Econ
, vol.24
, pp. 121-130
-
-
Blismas, N.1
Pasquire, C.2
Gibb, A.3
-
54
-
-
20044377916
-
Rebuilding the world trade center
-
Borg, R.; Gambatese, J.; Haines, K.; Hendrickson, C.; Hinze, J.; Horvath, A.; Koehn, E.; Moritz, S.; Mass, M.; Haughney, R. Rebuilding the world trade center. Pract. Period. Struct. Des. Constr. 2003, 8, 137-145.
-
(2003)
Pract. Period. Struct. Des. Constr
, vol.8
, pp. 137-145
-
-
Borg, R.1
Gambatese, J.2
Haines, K.3
Hendrickson, C.4
Hinze, J.5
Horvath, A.6
Koehn, E.7
Moritz, S.8
Mass, M.9
Haughney, R.10
-
55
-
-
84930136739
-
Remote oil and gas facility construction
-
Wyrik, D.A.; Eschenbach, T.G. Remote oil and gas facility construction. J. Constr. Eng. Manag. 1989, 115, 228-236.
-
(1989)
J. Constr. Eng. Manag
, vol.115
, pp. 228-236
-
-
Wyrik, D.A.1
Eschenbach, T.G.2
-
56
-
-
0042260808
-
Construction supply chain partnerships: Skills, knowledge and attitudinal requirements
-
Briscoe, G.; Dainty, A.R.J.; Millett, S. Construction supply chain partnerships: Skills, knowledge and attitudinal requirements. Eur. J. Purch. Supply Manag. 2001, 7, 243-255.
-
(2001)
Eur. J. Purch. Supply Manag
, vol.7
, pp. 243-255
-
-
Briscoe, G.1
Dainty, A.R.J.2
Millett, S.3
-
57
-
-
84872790095
-
Optimal utilization of interior building spaces for material procurement and storage in congested construction sites
-
Said, H.; El-Rayes, K. Optimal utilization of interior building spaces for material procurement and storage in congested construction sites. Autom. Constr. 2013, 31, 292-306.
-
(2013)
Autom. Constr
, vol.31
, pp. 292-306
-
-
Said, H.1
El-Rayes, K.2
-
58
-
-
84959024101
-
-
McGraw-Hill: New York, NY, USA, 7th ed
-
Baye, M.R. Magerial Economics and Business Strategy, 7th ed.; McGraw-Hill: New York, NY, USA, 2010; p. 658.
-
(2010)
Magerial Economics and Business Strategy
, pp. 658
-
-
Baye, M.R.1
-
59
-
-
84959024102
-
-
South-Western: Mason, OH, USA, 12th ed
-
McGuigan, J.R.; Moyer, R.C.; Harris, F.H.D. Managerial Economics: Applications, Strategy, and Tactics, 12th ed.; South-Western: Mason, OH, USA, 2011; p. 792.
-
(2011)
Managerial Economics: Applications, Strategy, and Tactics
, pp. 792
-
-
McGuigan, J.R.1
Moyer, R.C.2
Harris, F.H.D.3
-
60
-
-
84959024103
-
-
TCM Framework: 7.6-Risk Management; AACE International: Morgantown, WV, USA
-
AACE International. Risk Analysis and Contingency Determination Using Expected Value. In TCM Framework: 7.6-Risk Management; AACE International: Morgantown, WV, USA, 2012; Volume 44R-08, pp. 1-14.
-
(2012)
Risk Analysis and Contingency Determination Using Expected Value
, vol.44R-08
, pp. 1-14
-
-
-
61
-
-
84958962211
-
-
Project Management Institute: Newtown Square, PA, USA
-
Project Management Institute. Managing Change in Organization: A Practice Guide; Project Management Institute: Newtown Square, PA, USA, 2013; p. 141.
-
(2013)
Managing Change in Organization: A Practice Guide
, pp. 141
-
-
-
66
-
-
84862619424
-
Modelling project Complexity
-
ICED'07, Paris, France, 28-31 July
-
Vidal, L.-A.; Marle, F.; Bocquet, J.-C. Modelling project Complexity. In Proceedings of the International Conference on Engineering Design, ICED'07, Paris, France, 28-31 July 2007; pp. 1-10.
-
(2007)
Proceedings of the International Conference on Engineering Design
, pp. 1-10
-
-
Vidal, L.-A.1
Marle, F.2
Bocquet, J.-C.3
-
67
-
-
0030212023
-
The concept of project complexity a review
-
Baccarini, D. The concept of project complexity a review. Int. J. Proj. Manag. 1996, 14, 201-204.
-
(1996)
Int. J. Proj. Manag
, vol.14
, pp. 201-204
-
-
Baccarini, D.1
-
68
-
-
70349510694
-
-
Oxford University Press: Oxford, UK
-
Mitchell, M. Complexity a Guided Tour; Oxford University Press: Oxford, UK, 2009; p. 366.
-
(2009)
Complexity a Guided Tour
, pp. 366
-
-
Mitchell, M.1
-
69
-
-
84883303121
-
-
John Wiley & Sons: Hoboken, NJ, USA
-
Curlee, W.; Gordon, R.L. Complexity Theory and Project Management; John Wiley & Sons: Hoboken, NJ, USA, 2011; p. 419.
-
(2011)
Complexity Theory and Project Management
, pp. 419
-
-
Curlee, W.1
Gordon, R.L.2
-
70
-
-
84959024106
-
-
Project Management Institute: Newtown Square, PA, USA, 2nd ed
-
Project Management Institute. Practice Standard for Work Breakdown Structures, 2nd ed.; Project Management Institute: Newtown Square, PA, USA, 2006; p. 123.
-
(2006)
Practice Standard for Work Breakdown Structures
, pp. 123
-
-
-
71
-
-
77952741261
-
-
2nd ed.; Project Management Institute: Newtown Square, PA, USA
-
Project Management Institute. Practice Standard for Work Breakdown Structures, 2nd ed.; Project Management Institute: Newtown Square, PA, USA, 2006; p 156.
-
(2006)
Practice Standard for Work Breakdown Structures
, pp. 156
-
-
-
73
-
-
0039204681
-
Coefficient of network complexity
-
Kaimann, R.A. Coefficient of network complexity. Manag. Sci. 1974, 21, 172-177.
-
(1974)
Manag. Sci
, vol.21
, pp. 172-177
-
-
Kaimann, R.A.1
-
74
-
-
79960036627
-
Measuring project complexity using the analytic hierarchy process
-
Vidal, L.-A.; Marle, F.; Bocquet, J.-C. Measuring project complexity using the analytic hierarchy process. Int. J. Proj. Manag. 2010, 29, 718-727.
-
(2010)
Int. J. Proj. Manag
, vol.29
, pp. 718-727
-
-
Vidal, L.-A.1
Marle, F.2
Bocquet, J.-C.3
-
75
-
-
84930757745
-
-
Project Management Institute: Newtown Square, PA, USA
-
Project Management Institute. Navigating Complexity: A Practice Guide; Project Management Institute: Newtown Square, PA, USA, 2014; p. 114.
-
(2014)
Navigating Complexity: A Practice Guide
, pp. 114
-
-
-
77
-
-
33646745988
-
Developing a complexity measure for project schedules
-
Nassar, K.M.; Hegab, M.Y. Developing a complexity measure for project schedules. J. Constr. Eng. Manag. 2006, 132, 554-561.
-
(2006)
J. Constr. Eng. Manag
, vol.132
, pp. 554-561
-
-
Nassar, K.M.1
Hegab, M.Y.2
-
78
-
-
0003443506
-
-
RWS Pubns: Pittsburgh, PA, USA, 2nd ed
-
Saaty, T.L. Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation, 2nd ed.; RWS Pubns: Pittsburgh, PA, USA, 1990.
-
(1990)
Multicriteria Decision Making: The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation
-
-
Saaty, T.L.1
-
80
-
-
0004064059
-
-
Harcourt Brace & World: New York, NY, USA
-
Keynes, J.M. The General Theory of Employment, Interest, and Money; Harcourt Brace & World: New York, NY, USA, 1936; p. 403.
-
(1936)
The General Theory of Employment, Interest, and Money
, pp. 403
-
-
Keynes, J.M.1
-
81
-
-
84958975936
-
-
European Commission: Brussels, Belgium
-
European Commission. Value Management; European Commission: Brussels, Belgium, 1995; p. 190.
-
(1995)
Value Management
, pp. 190
-
-
-
82
-
-
37849000156
-
Defining uncertainty in projects-A new perspective
-
Perminova, O.; Gustafsson, M.; Wikstrom, K. Defining uncertainty in projects-A new perspective. Int. J. Proj. Manag. 2008, 26, 73-79.
-
(2008)
Int. J. Proj. Manag
, vol.26
, pp. 73-79
-
-
Perminova, O.1
Gustafsson, M.2
Wikstrom, K.3
-
83
-
-
0004066308
-
-
Library of Economics and Liberty: Boston, MA, USA
-
Knight, F.H. Risk, Uncertainty and Profit; Library of Economics and Liberty: Boston, MA, USA, 1921; p. 381.
-
(1921)
Risk, Uncertainty and Profit
, pp. 381
-
-
Knight, F.H.1
-
84
-
-
54749094482
-
-
McGraw-Hill: New York, NY, USA
-
Crouhy, M.; Galai, D.; Mark, R. The Essentials of Risk Management; McGraw-Hill: New York, NY, USA, 2005; p. 416.
-
(2005)
The Essentials of Risk Management
, pp. 416
-
-
Crouhy, M.1
Galai, D.2
Mark, R.3
-
85
-
-
46349093638
-
-
John Wiley & Sons: Hoboken, NJ, USA
-
Mun, J. Modeling Risk: Applying Monte Carlo Simulation, Real Options Analysis, Forecasting, and Optimization Techniques; John Wiley & Sons: Hoboken, NJ, USA, 2006; p 623.
-
(2006)
Modeling Risk: Applying Monte Carlo Simulation, Real Options Analysis, Forecasting, and Optimization Techniques
, pp. 623
-
-
Mun, J.1
-
86
-
-
84959024107
-
-
Project Management Institute: Newtown Square, PA, USA, 4th ed
-
Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide), 4th ed.; Project Management Institute: Newtown Square, PA, USA, 2008; p. 507.
-
(2008)
A Guide to the Project Management Body of Knowledge (Pmbok Guide)
, pp. 507
-
-
-
87
-
-
84959024108
-
-
McGraw-Hill: New York, NY, USA, 3rd ed
-
Jorion, P. Value at Risk the New Bechmark for Managing Financial Risk, 3rd ed.; McGraw-Hill: New York, NY, USA, 2007; p. 594.
-
(2007)
Value at Risk the New Bechmark for Managing Financial Risk
, pp. 594
-
-
Jorion, P.1
-
89
-
-
84958950138
-
-
Wikipedia. (accessed on 22 April 2014)
-
Wikipedia. Variability. Available online: https://en.wikipedia.org/wiki/Variability (accessed on 22 April 2014).
-
Variability
-
-
-
90
-
-
0036140878
-
The evidence of complex variability in construction labour productivity
-
Radosavljevic, M.; Horner, R.M.W. The evidence of complex variability in construction labour productivity. Constr. Manag. Econ. 2002, 20, 3-12.
-
(2002)
Constr. Manag. Econ
, vol.20
, pp. 3-12
-
-
Radosavljevic, M.1
Horner, R.M.W.2
-
91
-
-
33751094291
-
Fundamental uncertainties in projects and the scope of project management
-
Atkinson, R.; Crawford, L.; Ward, S. Fundamental uncertainties in projects and the scope of project management. Int. J. Proj. Manag. 2006, 24, 687-698.
-
(2006)
Int. J. Proj. Manag
, vol.24
, pp. 687-698
-
-
Atkinson, R.1
Crawford, L.2
Ward, S.3
-
93
-
-
0001018806
-
An analysis of the product-process matrix and repetitive manufacturing
-
Spencer, M.S.; Cox, J.F. An analysis of the product-process matrix and repetitive manufacturing. Int. J. Prod. Res. 1995, 33, 1275-1294.
-
(1995)
Int. J. Prod. Res
, vol.33
, pp. 1275-1294
-
-
Spencer, M.S.1
Cox, J.F.2
-
94
-
-
84959024109
-
One World Trade Center
-
PBS: Arlington, VA, USA
-
Public Broadcasting Service (PBS). One World Trade Center. In Super Skyscrapers; PBS: Arlington, VA, USA, 2014.
-
(2014)
Super Skyscrapers
-
-
-
97
-
-
84959024111
-
-
(accessed on 5 July 2014)
-
University of Alberta Dictionary. Universal Function Approximator. Available online: http://www.bcp.psych.ualberta.ca/~mike/Pearl_Street/Dictionary/contents/U/universalfn.html (accessed on 5 July 2014).
-
Universal Function Approximator
-
-
-
98
-
-
1542326420
-
-
Springer: Berlin, Germany
-
Xu, J.-X.; Tan, Y. Linear and Nonlinear Iterative Learning Control; Springer: Berlin, Germany, 2003; Volume 291, p. 177.
-
(2003)
Linear and Nonlinear Iterative Learning Control
, vol.291
, pp. 177
-
-
Xu, J.-X.1
Tan, Y.2
-
99
-
-
34648854572
-
-
Springer: New York, NY, USA
-
Dager, R.; Zuazua, E. Wave Propagation, Observation and Control in 1-d Flexible Multi-Structures; Springer: New York, NY, USA, 2006; Volume 50, p. 227.
-
(2006)
Wave Propagation, Observation and Control in 1-d Flexible Multi-Structures
, vol.50
, pp. 227
-
-
Dager, R.1
Zuazua, E.2
-
100
-
-
0003564548
-
-
Prentice Hall: Upper Saddle River, NJ, USA, 5th ed
-
Ogata, K. Modern Control Engineering, 5th ed.; Prentice Hall: Upper Saddle River, NJ, USA, 2010; p. 905.
-
(2010)
Modern Control Engineering
, pp. 905
-
-
Ogata, K.1
|