메뉴 건너뛰기




Volumn 5, Issue 1, 2015, Pages 209-228

A production model for construction: A Theoretical Framework

Author keywords

Building construction; Lean construction; Process control; Production model; Risk management; System model; Uncertainty; Variability

Indexed keywords


EID: 84958751315     PISSN: None     EISSN: 20755309     Source Type: Journal    
DOI: 10.3390/buildings5010209     Document Type: Article
Times cited : (75)

References (100)
  • 2
    • 82255188681 scopus 로고    scopus 로고
    • (accessed on 24 September 2014)
    • United States Department of Labor. Bureau of Labor Statistics. Available online: http://www.bls.gov/(accessed on 24 September 2014).
    • Bureau of Labor Statistics
  • 3
    • 3242876277 scopus 로고    scopus 로고
    • Project management under uncertainty: The impact of heuristics and biases
    • McCray, G.E.; Purvis, R.L. Project management under uncertainty: The impact of heuristics and biases. Proj. Manag. J. 2002, 33, 49-57.
    • (2002) Proj. Manag. J , vol.33 , pp. 49-57
    • McCray, G.E.1    Purvis, R.L.2
  • 5
    • 84986127808 scopus 로고    scopus 로고
    • A systematic approach to risk management for construction
    • Mills, A. A systematic approach to risk management for construction. Struct. Surv. 2001, 19, 245-252.
    • (2001) Struct. Surv , vol.19 , pp. 245-252
    • Mills, A.1
  • 6
    • 0004436232 scopus 로고
    • Planning repetitive construction: Current practice
    • Lutz, J.D.; Hijazi, A. Planning repetitive construction: Current practice. Constr. Manag. Econ. 1993, 11, 99-110.
    • (1993) Constr. Manag. Econ , vol.11 , pp. 99-110
    • Lutz, J.D.1    Hijazi, A.2
  • 10
    • 0001242198 scopus 로고
    • Estimating variance of output from cyclic exponential queueing systems
    • Duenyas, I.; Hopp, W.J. Estimating variance of output from cyclic exponential queueing systems. Queueing Syst. 1990, 7, 337-353.
    • (1990) Queueing Syst , vol.7 , pp. 337-353
    • Duenyas, I.1    Hopp, W.J.2
  • 13
    • 0000834220 scopus 로고
    • Simulation of nonsteady construction processes
    • Bernold, L.E. Simulation of nonsteady construction processes. J. Constr. Eng. Manag. 1989, 115, 163-178.
    • (1989) J. Constr. Eng. Manag , vol.115 , pp. 163-178
    • Bernold, L.E.1
  • 15
    • 33847109286 scopus 로고    scopus 로고
    • Production equations for unsteady-state construction processes
    • Walsh, K.D.; Sawhney, A.; Bashford, H.H. Production equations for unsteady-state construction processes. J. Constr. Eng. Manag. 2007, 133, 245-261.
    • (2007) J. Constr. Eng. Manag , vol.133 , pp. 245-261
    • Walsh, K.D.1    Sawhney, A.2    Bashford, H.H.3
  • 20
    • 0025437152 scopus 로고
    • Practical strategies for lead time reduction
    • Hopp, W.J.; Spearman, M.L.; Woodruff, D.L. Practical strategies for lead time reduction. Manuf. Rev. 1990, 3, 1-15.
    • (1990) Manuf. Rev , vol.3 , pp. 1-15
    • Hopp, W.J.1    Spearman, M.L.2    Woodruff, D.L.3
  • 21
    • 0025494698 scopus 로고
    • Machine maintenance with multiple maintenance actions
    • Hopp, W.J.; Wu, S.-C. Machine maintenance with multiple maintenance actions. IIE Trans. 1990, 22, 226-233.
    • (1990) IIE Trans , vol.22 , pp. 226-233
    • Hopp, W.J.1    Wu, S.-C.2
  • 23
    • 0003228793 scopus 로고
    • Availability and average inventory of balanced assembly-like flow systems
    • Simon, J.T.; Hopp, W.J. Availability and average inventory of balanced assembly-like flow systems. IIE Trans. 1991, 23, 161-168.
    • (1991) IIE Trans , vol.23 , pp. 161-168
    • Simon, J.T.1    Hopp, W.J.2
  • 24
    • 0041308344 scopus 로고
    • Wakefield, R.R., Carmichael, D.G., Eds.; Institution of Engineers: Sydney, Australia, Sydney, Australia, 17-18 February 1994
    • Koskela, L. In Proceedings of the Lean Construction, National Construction and Management Conference, Sydney, Australia, 17-18 February 1994; Wakefield, R.R., Carmichael, D.G., Eds.; Institution of Engineers: Sydney, Australia, 1994; pp. 205-217.
    • (1994) Proceedings of the Lean Construction, National Construction and Management Conference , pp. 205-217
    • Koskela, L.1
  • 25
    • 84959024093 scopus 로고    scopus 로고
    • Project Management Institute: Newtown Square, PA, USA, 2nd ed
    • Project Management Institute. Construction Extension to the Pmbok Guide Third Edition, 2nd ed.; Project Management Institute: Newtown Square, PA, USA, 2007; p. 208.
    • (2007) Construction Extension to the Pmbok Guide Third Edition , pp. 208
  • 26
    • 0030406151 scopus 로고    scopus 로고
    • Construction waste: Quantification and source evaluation
    • Bossink, B.; Brouwers, H. Construction waste: Quantification and source evaluation. J. Constr. Eng. Manag. 1996, 122, 55-60.
    • (1996) J. Constr. Eng. Manag , vol.122 , pp. 55-60
    • Bossink, B.1    Brouwers, H.2
  • 27
    • 85042808941 scopus 로고    scopus 로고
    • Construction management: Added value or added cost?
    • Hoffman, T.L. Construction management: Added value or added cost? J. Prop. Manag. 1998, 63, 6531300.
    • (1998) J. Prop. Manag , vol.63
    • Hoffman, T.L.1
  • 28
    • 0000575583 scopus 로고
    • The productivity slowdown, measurement issues, and the explosion of computer power
    • Baily, M.N.; Gordon, R.J.; Nordhaus, W.D.; Romer, D. The productivity slowdown, measurement issues, and the explosion of computer power. Brook. Papers Econ. Act. 1988, 19, 347-431.
    • (1988) Brook. Papers Econ. Act , vol.19 , pp. 347-431
    • Baily, M.N.1    Gordon, R.J.2    Nordhaus, W.D.3    Romer, D.4
  • 29
    • 84901625185 scopus 로고    scopus 로고
    • Overlapping design and construction activities and an optimization approach to minimize rework
    • Hossain, M.A.; Chua, D.K.H. Overlapping design and construction activities and an optimization approach to minimize rework. Int. J. Proj. Manag. 2014, 32, 983-994.
    • (2014) Int. J. Proj. Manag , vol.32 , pp. 983-994
    • Hossain, M.A.1    Chua, D.K.H.2
  • 30
    • 84956505291 scopus 로고    scopus 로고
    • Springer: Berlin/Heidelberg, Germany
    • Li, R.Y.M.; Poon, S.W. Construction Safety; Springer: Berlin/Heidelberg, Germany, 2013; p. 161.
    • (2013) Construction Safety , pp. 161
    • Li, R.Y.M.1    Poon, S.W.2
  • 31
    • 58049139009 scopus 로고    scopus 로고
    • Project Management Institute: Newtown Square, PA, USA, 5th ed
    • Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide), 5th ed.; Project Management Institute: Newtown Square, PA, USA, 2013; p. 616.
    • (2013) A Guide to the Project Management Body of Knowledge (Pmbok Guide) , pp. 616
  • 32
    • 84959024096 scopus 로고    scopus 로고
    • Project Management Institute: Newtown Square, PA, USA, 1st ed
    • Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide), 1st ed.; Project Management Institute: Newtown Square, PA, USA, 1996; p. 182.
    • (1996) A Guide to the Project Management Body of Knowledge (Pmbok Guide) , pp. 182
  • 33
    • 84959024097 scopus 로고    scopus 로고
    • International Project Management Association: Nijkerk, The Netherlands, 3rd ed
    • International Project Management Association. IPMA Competence Baseline Version 3.0, 3rd ed.; International Project Management Association: Nijkerk, The Netherlands, 2006; p. 212.
    • (2006) IPMA Competence Baseline Version 3.0 , pp. 212
  • 34
    • 84959024098 scopus 로고    scopus 로고
    • The Stationery Office: London, UK, 5th ed
    • Office of Government Commerce. Managing Successful Projects with Prince2, 5th ed.; The Stationery Office: London, UK, 2009; p. 346.
    • (2009) Managing Successful Projects with Prince2 , pp. 346
  • 35
    • 78650256578 scopus 로고    scopus 로고
    • Scheduling model for repetitive construction processes for high-rise buildings
    • Cho, K.; Hong, T.; Hyun, C. Scheduling model for repetitive construction processes for high-rise buildings. Can. J. Civil Eng. 2010, 38, 36-48.
    • (2010) Can. J. Civil Eng , vol.38 , pp. 36-48
    • Cho, K.1    Hong, T.2    Hyun, C.3
  • 36
    • 84958977100 scopus 로고    scopus 로고
    • Optimal scheduling for repetitive construction projects with multiple resource crews
    • Bhoyar, S.; Parbat, D.K. Optimal scheduling for repetitive construction projects with multiple resource crews. Int. J. Emerg. Technol. Adv. Eng. 2014, 4, 302-307.
    • (2014) Int. J. Emerg. Technol. Adv. Eng , vol.4 , pp. 302-307
    • Bhoyar, S.1    Parbat, D.K.2
  • 37
    • 0032645520 scopus 로고    scopus 로고
    • Parade game: Impact of work flow variability on trade performance
    • Tommelein, I.; Riley, D.; Howell, G. Parade game: Impact of work flow variability on trade performance. J. Constr. Eng. Manag. 1999, 125, 304-310.
    • (1999) J. Constr. Eng. Manag , vol.125 , pp. 304-310
    • Tommelein, I.1    Riley, D.2    Howell, G.3
  • 38
    • 2342441450 scopus 로고    scopus 로고
    • Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule
    • Berkeley, CA, USA, 26-28 July
    • Alarcon, L.F.; Ashley, D.B. Playing Games: Evaluating the Impact of Lean Production Strategies on Project Cost and Schedule. In Proceedings of the IGLC-7, Berkeley, CA, USA, 26-28 July 1999; pp. 263-274.
    • (1999) Proceedings of the IGLC-7 , pp. 263-274
    • Alarcon, L.F.1    Ashley, D.B.2
  • 40
    • 85060993103 scopus 로고    scopus 로고
    • A bridge between increasing reliability and reducing variability in construction work flow: A fuzzy-based sizing buffer model
    • Farag, M.A.M. A bridge between increasing reliability and reducing variability in construction work flow: A fuzzy-based sizing buffer model. J. Adv. Manag. Sci. 2014, 2, 287-294.
    • (2014) J. Adv. Manag. Sci , vol.2 , pp. 287-294
    • Farag, M.A.M.1
  • 41
    • 33748155228 scopus 로고    scopus 로고
    • Intelligence approach to production planning system for bespoke precast concrete products
    • Benjaoran, V.; Dawood, N. Intelligence approach to production planning system for bespoke precast concrete products. Autom. Constr. 2006, 15, 737-745.
    • (2006) Autom. Constr , vol.15 , pp. 737-745
    • Benjaoran, V.1    Dawood, N.2
  • 43
    • 0022779734 scopus 로고
    • Linear scheduling using optimal control theory
    • Handa, M.V.K.; Barcia, R.M. Linear scheduling using optimal control theory. J. Constr. Eng. Manag. 1986, 112, 387-393.
    • (1986) J. Constr. Eng. Manag , vol.112 , pp. 387-393
    • Handa, M.V.K.1    Barcia, R.M.2
  • 44
    • 12344273517 scopus 로고    scopus 로고
    • Production system loading-cycle time relationship in residential construction
    • Bashford, H.H.; Walsh, K.D.; Sawhney, A. Production system loading-cycle time relationship in residential construction. J. Constr. Eng. Manag. 2005, 131, 15-22.
    • (2005) J. Constr. Eng. Manag , vol.131 , pp. 15-22
    • Bashford, H.H.1    Walsh, K.D.2    Sawhney, A.3
  • 45
    • 84879670010 scopus 로고    scopus 로고
    • Integrated methodology to design and manage work-in-process buffers in repetitive building projects
    • Gonzalez, V.; Alarcon, L.F.; Yiu, T.W. Integrated methodology to design and manage work-in-process buffers in repetitive building projects. J. Oper. Res. Soc. 2013, 64, 1182-1193.
    • (2013) J. Oper. Res. Soc , vol.64 , pp. 1182-1193
    • Gonzalez, V.1    Alarcon, L.F.2    Yiu, T.W.3
  • 46
    • 57649231503 scopus 로고    scopus 로고
    • Multiobjective design of work-in-process buffer for scheduling repetitive building projects
    • Gonzalez, V.; Alarcon, L.F.; Molenaar, K. Multiobjective design of work-in-process buffer for scheduling repetitive building projects. Autom. Constr. 2009, 18, 95-108.
    • (2009) Autom. Constr , vol.18 , pp. 95-108
    • Gonzalez, V.1    Alarcon, L.F.2    Molenaar, K.3
  • 47
    • 84958986853 scopus 로고    scopus 로고
    • (accessed on 27 October 2014)
    • American Society for Testing and Materials. Building Economics. Available online: http://www.astm.org (accessed on 27 October 2014).
    • Building Economics
  • 49
    • 84959024099 scopus 로고    scopus 로고
    • Association for Project Management: Buckinghamshire, UK, 5th ed
    • Association for Project Management. APM Body of Knowledge, 5th ed.; Association for Project Management: Buckinghamshire, UK, 2006; p. 197.
    • (2006) APM Body of Knowledge , pp. 197
  • 50
    • 0041620446 scopus 로고    scopus 로고
    • Project management strategy-Project management represented as a process based set of management domains and the consequences for project management strategy
    • Anderson, D.K.; Merna, T. Project management strategy-Project management represented as a process based set of management domains and the consequences for project management strategy. Int. J. Proj. Manag. 2003, 21, 387-393.
    • (2003) Int. J. Proj. Manag , vol.21 , pp. 387-393
    • Anderson, D.K.1    Merna, T.2
  • 51
    • 84959024100 scopus 로고    scopus 로고
    • Project Management Institute: Newtown Square, PA, USA, 3rd ed
    • Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide), 3rd ed.; Project Management Institute: Newtown Square, PA, USA, 2004; p. 405.
    • (2004) A Guide to the Project Management Body of Knowledge (Pmbok Guide) , pp. 405
  • 52
    • 0037367528 scopus 로고    scopus 로고
    • Re-engineering through pre-assembly: Client expectations and drivers
    • Gibb, A.; Isack, F. Re-engineering through pre-assembly: Client expectations and drivers. Build. Res. Inf. 2003, 31, 146-160.
    • (2003) Build. Res. Inf , vol.31 , pp. 146-160
    • Gibb, A.1    Isack, F.2
  • 53
    • 32144456186 scopus 로고    scopus 로고
    • Benefit evaluation for off-site production in construction
    • Blismas, N.; Pasquire, C.; Gibb, A. Benefit evaluation for off-site production in construction. Constr. Manag. Econ. 2006, 24, 121-130.
    • (2006) Constr. Manag. Econ , vol.24 , pp. 121-130
    • Blismas, N.1    Pasquire, C.2    Gibb, A.3
  • 55
    • 84930136739 scopus 로고
    • Remote oil and gas facility construction
    • Wyrik, D.A.; Eschenbach, T.G. Remote oil and gas facility construction. J. Constr. Eng. Manag. 1989, 115, 228-236.
    • (1989) J. Constr. Eng. Manag , vol.115 , pp. 228-236
    • Wyrik, D.A.1    Eschenbach, T.G.2
  • 56
    • 0042260808 scopus 로고    scopus 로고
    • Construction supply chain partnerships: Skills, knowledge and attitudinal requirements
    • Briscoe, G.; Dainty, A.R.J.; Millett, S. Construction supply chain partnerships: Skills, knowledge and attitudinal requirements. Eur. J. Purch. Supply Manag. 2001, 7, 243-255.
    • (2001) Eur. J. Purch. Supply Manag , vol.7 , pp. 243-255
    • Briscoe, G.1    Dainty, A.R.J.2    Millett, S.3
  • 57
    • 84872790095 scopus 로고    scopus 로고
    • Optimal utilization of interior building spaces for material procurement and storage in congested construction sites
    • Said, H.; El-Rayes, K. Optimal utilization of interior building spaces for material procurement and storage in congested construction sites. Autom. Constr. 2013, 31, 292-306.
    • (2013) Autom. Constr , vol.31 , pp. 292-306
    • Said, H.1    El-Rayes, K.2
  • 60
    • 84959024103 scopus 로고    scopus 로고
    • TCM Framework: 7.6-Risk Management; AACE International: Morgantown, WV, USA
    • AACE International. Risk Analysis and Contingency Determination Using Expected Value. In TCM Framework: 7.6-Risk Management; AACE International: Morgantown, WV, USA, 2012; Volume 44R-08, pp. 1-14.
    • (2012) Risk Analysis and Contingency Determination Using Expected Value , vol.44R-08 , pp. 1-14
  • 61
    • 84958962211 scopus 로고    scopus 로고
    • Project Management Institute: Newtown Square, PA, USA
    • Project Management Institute. Managing Change in Organization: A Practice Guide; Project Management Institute: Newtown Square, PA, USA, 2013; p. 141.
    • (2013) Managing Change in Organization: A Practice Guide , pp. 141
  • 67
    • 0030212023 scopus 로고    scopus 로고
    • The concept of project complexity a review
    • Baccarini, D. The concept of project complexity a review. Int. J. Proj. Manag. 1996, 14, 201-204.
    • (1996) Int. J. Proj. Manag , vol.14 , pp. 201-204
    • Baccarini, D.1
  • 68
    • 70349510694 scopus 로고    scopus 로고
    • Oxford University Press: Oxford, UK
    • Mitchell, M. Complexity a Guided Tour; Oxford University Press: Oxford, UK, 2009; p. 366.
    • (2009) Complexity a Guided Tour , pp. 366
    • Mitchell, M.1
  • 70
    • 84959024106 scopus 로고    scopus 로고
    • Project Management Institute: Newtown Square, PA, USA, 2nd ed
    • Project Management Institute. Practice Standard for Work Breakdown Structures, 2nd ed.; Project Management Institute: Newtown Square, PA, USA, 2006; p. 123.
    • (2006) Practice Standard for Work Breakdown Structures , pp. 123
  • 71
    • 77952741261 scopus 로고    scopus 로고
    • 2nd ed.; Project Management Institute: Newtown Square, PA, USA
    • Project Management Institute. Practice Standard for Work Breakdown Structures, 2nd ed.; Project Management Institute: Newtown Square, PA, USA, 2006; p 156.
    • (2006) Practice Standard for Work Breakdown Structures , pp. 156
  • 73
    • 0039204681 scopus 로고
    • Coefficient of network complexity
    • Kaimann, R.A. Coefficient of network complexity. Manag. Sci. 1974, 21, 172-177.
    • (1974) Manag. Sci , vol.21 , pp. 172-177
    • Kaimann, R.A.1
  • 74
    • 79960036627 scopus 로고    scopus 로고
    • Measuring project complexity using the analytic hierarchy process
    • Vidal, L.-A.; Marle, F.; Bocquet, J.-C. Measuring project complexity using the analytic hierarchy process. Int. J. Proj. Manag. 2010, 29, 718-727.
    • (2010) Int. J. Proj. Manag , vol.29 , pp. 718-727
    • Vidal, L.-A.1    Marle, F.2    Bocquet, J.-C.3
  • 75
    • 84930757745 scopus 로고    scopus 로고
    • Project Management Institute: Newtown Square, PA, USA
    • Project Management Institute. Navigating Complexity: A Practice Guide; Project Management Institute: Newtown Square, PA, USA, 2014; p. 114.
    • (2014) Navigating Complexity: A Practice Guide , pp. 114
  • 77
    • 33646745988 scopus 로고    scopus 로고
    • Developing a complexity measure for project schedules
    • Nassar, K.M.; Hegab, M.Y. Developing a complexity measure for project schedules. J. Constr. Eng. Manag. 2006, 132, 554-561.
    • (2006) J. Constr. Eng. Manag , vol.132 , pp. 554-561
    • Nassar, K.M.1    Hegab, M.Y.2
  • 81
    • 84958975936 scopus 로고
    • European Commission: Brussels, Belgium
    • European Commission. Value Management; European Commission: Brussels, Belgium, 1995; p. 190.
    • (1995) Value Management , pp. 190
  • 83
    • 0004066308 scopus 로고
    • Library of Economics and Liberty: Boston, MA, USA
    • Knight, F.H. Risk, Uncertainty and Profit; Library of Economics and Liberty: Boston, MA, USA, 1921; p. 381.
    • (1921) Risk, Uncertainty and Profit , pp. 381
    • Knight, F.H.1
  • 86
    • 84959024107 scopus 로고    scopus 로고
    • Project Management Institute: Newtown Square, PA, USA, 4th ed
    • Project Management Institute. A Guide to the Project Management Body of Knowledge (Pmbok Guide), 4th ed.; Project Management Institute: Newtown Square, PA, USA, 2008; p. 507.
    • (2008) A Guide to the Project Management Body of Knowledge (Pmbok Guide) , pp. 507
  • 89
    • 84958950138 scopus 로고    scopus 로고
    • Wikipedia. (accessed on 22 April 2014)
    • Wikipedia. Variability. Available online: https://en.wikipedia.org/wiki/Variability (accessed on 22 April 2014).
    • Variability
  • 90
    • 0036140878 scopus 로고    scopus 로고
    • The evidence of complex variability in construction labour productivity
    • Radosavljevic, M.; Horner, R.M.W. The evidence of complex variability in construction labour productivity. Constr. Manag. Econ. 2002, 20, 3-12.
    • (2002) Constr. Manag. Econ , vol.20 , pp. 3-12
    • Radosavljevic, M.1    Horner, R.M.W.2
  • 91
    • 33751094291 scopus 로고    scopus 로고
    • Fundamental uncertainties in projects and the scope of project management
    • Atkinson, R.; Crawford, L.; Ward, S. Fundamental uncertainties in projects and the scope of project management. Int. J. Proj. Manag. 2006, 24, 687-698.
    • (2006) Int. J. Proj. Manag , vol.24 , pp. 687-698
    • Atkinson, R.1    Crawford, L.2    Ward, S.3
  • 93
    • 0001018806 scopus 로고
    • An analysis of the product-process matrix and repetitive manufacturing
    • Spencer, M.S.; Cox, J.F. An analysis of the product-process matrix and repetitive manufacturing. Int. J. Prod. Res. 1995, 33, 1275-1294.
    • (1995) Int. J. Prod. Res , vol.33 , pp. 1275-1294
    • Spencer, M.S.1    Cox, J.F.2
  • 94
    • 84959024109 scopus 로고    scopus 로고
    • One World Trade Center
    • PBS: Arlington, VA, USA
    • Public Broadcasting Service (PBS). One World Trade Center. In Super Skyscrapers; PBS: Arlington, VA, USA, 2014.
    • (2014) Super Skyscrapers
  • 97
    • 84959024111 scopus 로고    scopus 로고
    • (accessed on 5 July 2014)
    • University of Alberta Dictionary. Universal Function Approximator. Available online: http://www.bcp.psych.ualberta.ca/~mike/Pearl_Street/Dictionary/contents/U/universalfn.html (accessed on 5 July 2014).
    • Universal Function Approximator
  • 100
    • 0003564548 scopus 로고    scopus 로고
    • Prentice Hall: Upper Saddle River, NJ, USA, 5th ed
    • Ogata, K. Modern Control Engineering, 5th ed.; Prentice Hall: Upper Saddle River, NJ, USA, 2010; p. 905.
    • (2010) Modern Control Engineering , pp. 905
    • Ogata, K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.