메뉴 건너뛰기




Volumn 2, Issue , 2002, Pages 1697-1703

Lean construction and simulation

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTER SIMULATION; COSTS; LINEAR EQUATIONS; MOTIVATION; PRODUCT DESIGN; PRODUCTIVITY; PROJECT MANAGEMENT; TOTAL QUALITY MANAGEMENT;

EID: 0036923474     PISSN: 02750708     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (28)

References (8)
  • 1
    • 0032284096 scopus 로고    scopus 로고
    • Simulation of large precast operations
    • ed. D. J. Medeiros and E. F. Watson, Washington, D.C.
    • Balbontin-Bravo, E. 1998. Simulation of large precast operations. Proceedings of 1998 Winter Simulation Conference, ed. D. J. Medeiros and E. F. Watson, Washington, D.C., pp. 1311-1317.
    • (1998) Proceedings of 1998 Winter Simulation Conference , pp. 1311-1317
    • Balbontin-Bravo, E.1
  • 2
    • 0012257213 scopus 로고    scopus 로고
    • Waste water treatment project in Lafayette: Case study
    • Construction Engineering & Management, Purdue University, West Lafayette, IN
    • Cui, Q., and S. Lee 2001. Waste water treatment project in Lafayette: Case study. CE 520 Project, Construction Engineering & Management, Purdue University, West Lafayette, IN.
    • (2001) CE 520 Project
    • Cui, Q.1    Lee, S.2
  • 4
    • 0003656231 scopus 로고
    • Technical Report No. 72, Center for Integrated Facility Engineering, Department of Civil Engineering, Stanford University
    • Koskela, L. 1992. Application of the new production philosophy to construction. Technical Report No. 72, Center for Integrated Facility Engineering, Department of Civil Engineering, Stanford University, 75 p.
    • (1992) Application of the New Production Philosophy to Construction , pp. 75
    • Koskela, L.1
  • 5
    • 0004007948 scopus 로고    scopus 로고
    • Doctoral dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, Michigan
    • Martinez, J. C. 1996. STROBOSCOPE: State and resource based simulation of construction process. Doctoral dissertation, Department of Civil and Environmental Engineering, University of Michigan, Ann Arbor, Michigan.
    • (1996) STROBOSCOPE: State and Resource Based Simulation of Construction Process
    • Martinez, J.C.1
  • 6
    • 0000012732 scopus 로고    scopus 로고
    • Pull-driven scheduling for pipe-spool installation: Simulation of a lean construction technique
    • Tommelein, I. 1998. Pull-driven scheduling for pipe-spool installation: Simulation of a lean construction technique. Journal of Construction Engineering and Management, Vol. 124, No. 4, pp. 279-288.
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.4 , pp. 279-288
    • Tommelein, I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.