메뉴 건너뛰기




Volumn 31, Issue 2, 2003, Pages 146-160

Re-engineering through pre-assembly: Client expectations and drivers

Author keywords

Business process re engineering; Clients; Modularization; Pre assembly; Re engineering construction; System building

Indexed keywords

CUSTOMER SATISFACTION; INDUSTRIAL RESEARCH; MODULAR CONSTRUCTION; PROJECT MANAGEMENT; REENGINEERING;

EID: 0037367528     PISSN: 09613218     EISSN: None     Source Type: Trade Journal    
DOI: 10.1080/09613210302000     Document Type: Article
Times cited : (311)

References (23)
  • 8
    • 0002908379 scopus 로고    scopus 로고
    • Construction as a manufacturing process? - Similarities and differences between industrialised housing and car production in Japan
    • Gann, D.M. (1996) Construction as a manufacturing process? - Similarities and differences between industrialised housing and car production in Japan. Construction Management and Economics, 14, 437-450.
    • (1996) Construction Management and Economics , vol.14 , pp. 437-450
    • Gann, D.M.1
  • 12
    • 0000683034 scopus 로고    scopus 로고
    • Standardisation and pre-assembly - Distinguishing myth from reality
    • [Invited Paper]
    • Gibb, A.G.F. (2001) Standardisation and pre-assembly - distinguishing myth from reality [Invited Paper]. Construction Management and Economics, 19, 307-315.
    • (2001) Construction Management and Economics , vol.19 , pp. 307-315
    • Gibb, A.G.F.1
  • 16
    • 0033312917 scopus 로고    scopus 로고
    • Methodology for priority setting with application to software development process
    • Lee, M., Pham, H. and Zhang, X.A. (1999) Methodology for priority setting with application to software development process. European Journal of Operational Research, 118.
    • (1999) European Journal of Operational Research , pp. 118
    • Lee, M.1    Pham, H.2    Zhang, X.A.3
  • 19
    • 2242485025 scopus 로고
    • The analytical hierarchy process: What it is and how it is used
    • Saaty, R.W. (1987) The analytical hierarchy process: what it is and how it is used. Mathematical Modelling, 9(3-5), 161-176.
    • (1987) Mathematical Modelling , vol.9 , Issue.3-5 , pp. 161-176
    • Saaty, R.W.1
  • 20
    • 12244300600 scopus 로고    scopus 로고
    • Salford process protocol - Generic design and construction process
    • University of Salford; University of Salford, Salford
    • University of Salford (1998) Salford Process Protocol - Generic Design and Construction Process, University of Salford, Salford.
    • (1998)
  • 21
    • 0002534393 scopus 로고    scopus 로고
    • Sarja, A. (ed.); E & FN Spon/Routledge, London
    • Sarja, A. (ed.) (1998) Open and Industrialised Building, E & FN Spon/Routledge, London.
    • (1998) Open and Industrialised Building


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.