Scheduling model for repetitive construction processes for high-rise buildings

Author keywords

Core walls; High rise buildings; Mathematical models; Productivity; Scheduling

Indexed keywords

CONSTRUCTION PROCESS; CORE WALL; DEVELOPED MODEL; HIGH RISE BUILDING; KEY FACTORS; LINEAR SCHEDULING METHODS; MATHEMATICAL FORMULAS; PRODUCTION RATES; REPETITIVE PROCESS; SCHEDULING METHODS; SCHEDULING MODELS; WORK TASK;

EID: 78650256578     PISSN: 03151468     EISSN: 12086029     Source Type: Journal    
DOI: 10.1139/L10-108     Document Type: Article
Times cited : (13)

References (23)
  • 1
    • 0035399998 scopus 로고    scopus 로고
    • Effect of learning on line-of-balance scheduling
    • doi:10.1016/S0263-7863(99)00079-4
    • Arditi, D., Tokdemir, O.B., and Suh, K. 2001. Effect of learning on line-of-balance scheduling. International Journal of Project Management, 19(5): 265-277. doi:10.1016/S0263-7863(99)00079-4.
    • (2001) International Journal of Project Management , vol.19 , Issue.5 , pp. 265-277
    • Arditi, D.1    Tokdemir, O.B.2    Suh, K.3
  • 2
    • 0035335276 scopus 로고    scopus 로고
    • Object-oriented model for repetitive construction scheduling
    • doi:10.1061/(ASCE)0733-9364(2001)127:3(199)
    • El-Rayes, K. 2001. Object-oriented model for repetitive construction scheduling. Journal of Construction Engineering and Management, 127(3): 199-205. doi:10.1061/(ASCE)0733-9364(2001)127:3(199).
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.3 , pp. 199-205
    • El-Rayes, K.1
  • 3
    • 12444344998 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities
    • doi:10.1080/014461998372213
    • El-Rayes, K., and Moselhi, O. 1998. Resource-driven scheduling of repetitive activities. Journal of Construction Management and Economics, 16(4): 433-446. doi:10.1080/014461998372213.
    • (1998) Journal of Construction Management and Economics , vol.16 , Issue.4 , pp. 433-446
    • El-Rayes, K.1    Moselhi, O.2
  • 4
    • 33645522898 scopus 로고    scopus 로고
    • Object oriented scheduling for repetitive projects with soft logic
    • doi:10.1061/(ASCE) 0733-9364(2006)132:1(35)
    • Fan, S.L., and Tserng, H.P. 2006. Object oriented scheduling for repetitive projects with soft logic. Journal of Construction Engineering and Management, 132(1): 35-48. doi:10.1061/(ASCE) 0733-9364(2006)132:1(35).
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.1 , pp. 35-48
    • Fan, S.L.1    Tserng, H.P.2
  • 6
    • 0000802988 scopus 로고    scopus 로고
    • Linear scheduling model: Development of controlling activity path
    • doi:10.1061/(ASCE)0733-9364(1998)124:4(263)
    • Harmelink, D.J., and Rowings, J.E. 1998. Linear scheduling model: development of controlling activity path. Journal of Construction Engineering and Management, 124(4): 263-268. doi:10.1061/(ASCE)0733-9364(1998)124:4(263).
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.4 , pp. 263-268
    • Harmelink, D.J.1    Rowings, J.E.2
  • 7
    • 33646741580 scopus 로고    scopus 로고
    • Non unit based planning and scheduling of repetitive construction projects
    • doi:10.1061/(ASCE)0733-9364(2006)132:6(585)
    • Huang, R.Y., and Sun, K.S. 2006. Non unit based planning and scheduling of repetitive construction projects. Journal of Construction Engineering and Management, 132(6): 585-597. doi:10.1061/(ASCE)0733-9364(2006)132:6(585).
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.6 , pp. 585-597
    • Huang, R.Y.1    Sun, K.S.2
  • 8
    • 33646584142 scopus 로고    scopus 로고
    • Optimal planning and scheduling for repetitive construction projects
    • doi:10.1061/(ASCE)0742-597X(2006) 22:1(11)
    • Hyari, K., and El-Rayes, K. 2006. Optimal planning and scheduling for repetitive construction projects. Journal of Management Engineering, 22(1): 11-19. doi:10.1061/(ASCE)0742-597X(2006) 22:1(11).
    • (2006) Journal of Management Engineering , vol.22 , Issue.1 , pp. 11-19
    • Hyari, K.1    El-Rayes, K.2
  • 9
    • 0022128947 scopus 로고
    • SIREN: A repetitive construction simulation model
    • doi:10.1061/(ASCE)0733-9364(1985) 111:3(308)
    • Kavanagh, D.P. 1985. SIREN: A repetitive construction simulation model. Journal of Construction Engineering and Management, 111(3): 308-323. doi:10.1061/(ASCE)0733-9364(1985) 111:3(308).
    • (1985) Journal of Construction Engineering and Management , vol.111 , Issue.3 , pp. 308-323
    • Kavanagh, D.P.1
  • 12
    • 0345813224 scopus 로고    scopus 로고
    • Simplified CPM/PERT simulation model
    • doi:10.1061/(ASCE)0733-9364(2000) 126:3(219)
    • Lu, M., and AbouRizk, S.M. 2000. Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3): 219-226. doi:10.1061/(ASCE)0733-9364(2000) 126:3(219).
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.3 , pp. 219-226
    • Lu, M.1    Abourizk, S.M.2
  • 14
    • 13944263588 scopus 로고    scopus 로고
    • Comparison of linear scheduling model and repetitive scheduling method
    • doi:10.1061/(ASCE)0733-9364(2003)129:1(56)
    • Mattila, K.G., and Park, A. 2003. Comparison of linear scheduling model and repetitive scheduling method. Journal of Construction Engineering and Management, 129(1): 56-64. doi:10.1061/(ASCE)0733-9364(2003)129:1(56).
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.1 , pp. 56-64
    • Mattila, K.G.1    Park, A.2
  • 15
    • 0027866760 scopus 로고
    • Scheduling of repetitive projects with cost optimization
    • doi:10.1061/(ASCE)0733-9364(1993)119:4(681)
    • Moselhi, O., and El-Rayes, K. 1993. Scheduling of repetitive projects with cost optimization. Journal of Construction Engineering and Management, 119(4): 681-697. doi:10.1061/(ASCE)0733-9364(1993)119:4(681).
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.4 , pp. 681-697
    • Moselhi, O.1    El-Rayes, K.2
  • 17
    • 0025447970 scopus 로고
    • RPM: Repetitive project modeling
    • doi:10.1061/(ASCE)0733-9364(1990)116:2(316)
    • Reda, R.M. 1990. RPM: Repetitive project modeling. Journal of Construction Engineering and Management, 116(2): 316-330. doi:10.1061/(ASCE)0733-9364(1990)116:2(316).
    • (1990) Journal of Construction Engineering and Management , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.M.1
  • 18
    • 0027555168 scopus 로고
    • Masonry productivity forecasting model
    • doi:10.1061/(ASCE)0733-9364(1993)119:1(163)
    • Sanders, S.R., and Thomas, R.H. 1993. Masonry productivity forecasting model. Journal of Construction Engineering and Management, 119(1): 163-179. doi:10.1061/(ASCE)0733-9364(1993)119:1(163).
    • (1993) Journal of Construction Engineering and Management , vol.119 , Issue.1 , pp. 163-179
    • Sanders, S.R.1    Thomas, R.H.2
  • 20
    • 0032206731 scopus 로고    scopus 로고
    • Construction labor productivity modeling with neural network
    • doi:10.1061/(ASCE) 0733-9364(1998)124:6(498)
    • Sonmez, R., and Rowings, J.E. 1998. Construction labor productivity modeling with neural network. Journal of Construction Engineering and Management, 124(6): 498-504. doi:10.1061/(ASCE) 0733-9364(1998)124:6(498).
    • (1998) Journal of Construction Engineering and Management , vol.124 , Issue.6 , pp. 498-504
    • Sonmez, R.1    Rowings, J.E.2
  • 21
    • 0028495816 scopus 로고
    • CPM/LOB: New methodology to integrate CPM and Line of Balance
    • doi:10.1061/(ASCE)0733-9364(1994)120:3(667)
    • Suhail, S.A., and Neale, R.H. 1994. CPM/LOB: New methodology to integrate CPM and Line of Balance. Journal of Construction Engineering and Management, 120(3): 667-684. doi:10.1061/(ASCE)0733-9364(1994)120:3(667).
    • (1994) Journal of Construction Engineering and Management , vol.120 , Issue.3 , pp. 667-684
    • Suhail, S.A.1    Neale, R.H.2
  • 22
    • 0035454491 scopus 로고    scopus 로고
    • Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM)
    • doi:10.1061/(ASCE)0733-9364(2001)127:5(374)
    • Yamin, R.A., and Harmelink, D.J. 2001. Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM). Journal of Construction Engineering and Management, 127(5): 374-381.doi:10.1061/(ASCE)0733-9364(2001)127:5(374).
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.5 , pp. 374-381
    • Yamin, R.A.1    Harmelink, D.J.2
  • 23
    • 4043093611 scopus 로고    scopus 로고
    • Scheduling system focus on practical concerns in repetitive projects
    • doi:10.1080/01446190310001649065
    • Yang, I., and Ioannou, P.G. 2004. Scheduling system focus on practical concerns in repetitive projects. Construction Management and Economics, 22(6): 619-630. doi:10.1080/01446190310001649065.
    • (2004) Construction Management and Economics , vol.22 , Issue.6 , pp. 619-630
    • Yang, I.1    Ioannou, P.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.