메뉴 건너뛰기




Volumn 36, Issue 4, 2006, Pages 563-577

Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey

Author keywords

Agents; Distributed manufacturing systems; Manufacturing scheduling; Multiagent systems; Process planning

Indexed keywords

AGENTS; INDUSTRIAL RESEARCH; MANUFACTURE; MULTI AGENT SYSTEMS; PROCESS PLANNING;

EID: 80052993037     PISSN: 10946977     EISSN: None     Source Type: Journal    
DOI: 10.1109/TSMCC.2006.874022     Document Type: Review
Times cited : (415)

References (136)
  • 2
    • 0024640250 scopus 로고
    • Computer aided process planning: The state-of-the-art survey
    • L. Alting and H. C. Zhang, "Computer aided process planning: The state-of-the-art survey," Int. J. Prod. Res., vol. 27, no. 4, pp. 553-605, 1989.
    • (1989) Int. J. Prod. Res. , vol.27 , Issue.4 , pp. 553-605
    • Alting, L.1    Zhang, H.C.2
  • 3
    • 0033742932 scopus 로고    scopus 로고
    • Selection of cutting tools and conditions of machining operations using an expert system
    • B. Arezoo, K. Ridgway, and A. M. A. Al-Ahmari, "Selection of cutting tools and conditions of machining operations using an expert system," Comput. Ind., vol. 42, pp. 43-60, 2000.
    • (2000) Comput. Ind. , vol.42 , pp. 43-60
    • Arezoo, B.1    Ridgway, K.2    Al-Ahmari, A.M.A.3
  • 4
    • 1342287338 scopus 로고    scopus 로고
    • A distributed scheduling methodology for a two-machine flowshop using cooperative interaction via multiple coupling agents
    • A. Babayan and D. He, "A distributed scheduling methodology for a two-machine flowshop using cooperative interaction via multiple coupling agents," Int. J. Prod. Res., vol. 42, no. 4, pp. 777-7104, 2004.
    • (2004) Int. J. Prod. Res. , vol.42 , Issue.4 , pp. 777-7104
    • Babayan, A.1    He, D.2
  • 7
    • 0029659082 scopus 로고    scopus 로고
    • Tool paths and cutting technology in computer-aided process planning
    • R. M. Boogert, H. J. Kals, and F. J. Van Houten, "Tool paths and cutting technology in computer-aided process planning," Int. J. Adv. Manuf. Technol., vol. 11, pp. 186-197, 1996.
    • (1996) Int. J. Adv. Manuf. Technol. , vol.11 , pp. 186-197
    • Boogert, R.M.1    Kals, H.J.2    Van Houten, F.J.3
  • 8
    • 0000955243 scopus 로고
    • A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
    • P. Brandimarte and M. Calderini, "A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling," Int. J. Prod. Res., vol. 33, no. 1, pp. 161-181, 1995.
    • (1995) Int. J. Prod. Res. , vol.33 , Issue.1 , pp. 161-181
    • Brandimarte, P.1    Calderini, M.2
  • 9
    • 0002648815 scopus 로고    scopus 로고
    • Agents, holons and function blocks: Distributed intelligent control in manufacturing
    • R. W. Brennan and D. H. Norrie, "Agents, holons and function blocks: Distributed intelligent control in manufacturing," J. Appl. Syst. Stud., vol. 2, no. 1, pp. 1-19, 2001.
    • (2001) J. Appl. Syst. Stud. , vol.2 , Issue.1 , pp. 1-19
    • Brennan, R.W.1    Norrie, D.H.2
  • 10
    • 0001794206 scopus 로고
    • The distributed asynchronous scheduler
    • M. Zweben and M. S. Fox, Eds. San Francisco, CA: Morgan Kaufmann
    • P. Burke and P. Prosser, "The distributed asynchronous scheduler," in Intelligent Scheduling, M. Zweben and M. S. Fox, Eds. San Francisco, CA: Morgan Kaufmann, 1994, pp. 309-339.
    • (1994) Intelligent Scheduling , pp. 309-339
    • Burke, P.1    Prosser, P.2
  • 11
    • 0001951032 scopus 로고    scopus 로고
    • An agent-oriented architecture for holonic manufacturing control
    • Lausanne, Switzerland
    • S. Bussmann, "An agent-oriented architecture for holonic manufacturing control," in Proc. 1st Int. Workshop Intell. Manuf. Syst., Lausanne, Switzerland, 1998, pp. 1-12.
    • (1998) Proc. 1st Int. Workshop Intell. Manuf. Syst. , pp. 1-12
    • Bussmann, S.1
  • 12
    • 0002326640 scopus 로고
    • ADDYMS: Architecture for distributed dynamic manufacturing scheduling
    • A. Famili, D. S. Nau, and S. H. Kim, Eds. Menlo Park, CA: AAAI Press
    • J. Butler and H. Ohtsubo, "ADDYMS: Architecture for distributed dynamic manufacturing scheduling," in Artificial Intelligence Applications in Manufacturing, A. Famili, D. S. Nau, and S. H. Kim, Eds. Menlo Park, CA: AAAI Press, 1992, pp. 199-214.
    • (1992) Artificial Intelligence Applications in Manufacturing , pp. 199-214
    • Butler, J.1    Ohtsubo, H.2
  • 14
    • 2642547919 scopus 로고    scopus 로고
    • Modelling of integrated, distributed and cooperative process planning system using an agent-based approach
    • F. T. S. Chan, J. Zhang, and P. Li, "Modelling of integrated, distributed and cooperative process planning system using an agent-based approach," in Proc. Inst. Mech. Eng., Part B-J. Eng. Manuf., vol. 215, no. B10, 2001, pp. 1437-1451.
    • (2001) Proc. Inst. Mech. Eng., Part B-J. Eng. Manuf. , vol.215 , Issue.B10 , pp. 1437-1451
    • Chan, F.T.S.1    Zhang, J.2    Li, P.3
  • 15
    • 0012857111 scopus 로고    scopus 로고
    • An integrated artificial intelligent computeraided process planning system
    • P. T. Chang and C. H. Chang, "An integrated artificial intelligent computeraided process planning system," Int. J. Comput. Integr. Manuf., vol. 13, no. 6, pp. 483-497, 2000.
    • (2000) Int. J. Comput. Integr. Manuf. , vol.13 , Issue.6 , pp. 483-497
    • Chang, P.T.1    Chang, C.H.2
  • 16
    • 84876152333 scopus 로고
    • Scheduling with flexible process plans
    • Q. Chen and B. Khoshnevis, "Scheduling with flexible process plans," Prod. Planning Control, vol. 4, no. 4, pp. 333-343, 1993.
    • (1993) Prod. Planning Control , vol.4 , Issue.4 , pp. 333-343
    • Chen, Q.1    Khoshnevis, B.2
  • 17
    • 0141919583 scopus 로고    scopus 로고
    • A multi-agent architecture for dynamic scheduling of steel hot rolling
    • P. I. Cowling, D. Ouelhadj, and S. Petrovic, "A multi-agent architecture for dynamic scheduling of steel hot rolling," J. Intell. Manuf., vol. 14, no. 5, pp. 457-470, 2003.
    • (2003) J. Intell. Manuf. , vol.14 , Issue.5 , pp. 457-470
    • Cowling, P.I.1    Ouelhadj, D.2    Petrovic, S.3
  • 21
    • 0002319695 scopus 로고    scopus 로고
    • Feature-based modeling and neural network-based CAPP for integrated manufacturing
    • C. R. Devireddy and K. Ghosh, "Feature-based modeling and neural network-based CAPP for integrated manufacturing," Int. J. Comput. Integr. Manuf., vol. 12, no. 1, pp. 61-74, 1999.
    • (1999) Int. J. Comput. Integr. Manuf. , vol.12 , Issue.1 , pp. 61-74
    • Devireddy, C.R.1    Ghosh, K.2
  • 23
    • 46149135961 scopus 로고
    • Non-hierarchical control of manufacturing systems
    • N. A. Duffie and R. S. Piper, "Non-hierarchical control of manufacturing systems," J. Manuf. Syst., vol. 5, no. 2, pp. 137-139, 1986.
    • (1986) J. Manuf. Syst. , vol.5 , Issue.2 , pp. 137-139
    • Duffie, N.A.1    Piper, R.S.2
  • 24
    • 0034989549 scopus 로고    scopus 로고
    • A computer-based intelligent system for automatic tool selection
    • K. O. Edalew, H. S. Abdalla, and R. J. Nash, "A computer-based intelligent system for automatic tool selection," Mater. Design, vol. 22, pp. 337-351, 2001.
    • (2001) Mater. Design , vol.22 , pp. 337-351
    • Edalew, K.O.1    Abdalla, H.S.2    Nash, R.J.3
  • 25
    • 0027808818 scopus 로고
    • Evolution and future perspectives on CAPP
    • H. A. Elmaraghy, "Evolution and future perspectives on CAPP," CIRP Ann. (Keynote), vol. 42, no. 2, pp. 739-751, 1993.
    • (1993) CIRP Ann. (Keynote) , vol.42 , Issue.2 , pp. 739-751
    • Elmaraghy, H.A.1
  • 26
    • 84922781401 scopus 로고    scopus 로고
    • FIPA (Foundation of Intelligent Physical Agents) [Online]
    • FIPA (Foundation of Intelligent Physical Agents). [Online]. Available: http://www.fipa.org/
  • 27
    • 0000142524 scopus 로고
    • A model for cooperative transportation scheduling
    • San Francisco, CA
    • K. Fischer, J. P. Muller, M. Pischel, and D. Schier, "A model for cooperative transportation scheduling," in Proc. ICMAS'95, San Francisco, CA, 1995, pp. 109-116.
    • (1995) Proc. ICMAS'95 , pp. 109-116
    • Fischer, K.1    Muller, J.P.2    Pischel, M.3    Schier, D.4
  • 28
    • 0001811353 scopus 로고
    • Logistics management system (LMS): Integrating decision technologies for dispatch scheduling in semiconductor manufacturing
    • M. Zweben and M. S. Fox, Eds. San Francisco, CA: Morgan Kaufmann
    • K. Fordyce and G. G. Sullivan, "Logistics management system (LMS): Integrating decision technologies for dispatch scheduling in semiconductor manufacturing," in Intelligent Scheduling, M. Zweben and M. S. Fox, Eds. San Francisco, CA: Morgan Kaufmann, 1994, pp. 473-516.
    • (1994) Intelligent Scheduling , pp. 473-516
    • Fordyce, K.1    Sullivan, G.G.2
  • 30
    • 0036352425 scopus 로고    scopus 로고
    • Scheduling of flexible-sequenced process plans in a mould manufacturing shop
    • P. Y. Gan and K. S. Lee, "Scheduling of flexible-sequenced process plans in a mould manufacturing shop," Int. J. Adv. Manuf. Technol., vol. 20, pp. 214-222, 2002.
    • (2002) Int. J. Adv. Manuf. Technol. , vol.20 , pp. 214-222
    • Gan, P.Y.1    Lee, K.S.2
  • 31
    • 0027602378 scopus 로고
    • Coadaptive behavior in a simple distributed job scheduling
    • May-Jun.
    • A. Glockner and J. Pasquale, "Coadaptive behavior in a simple distributed job scheduling," IEEE Trans. Syst., Man, Cybern., vol. 23, no. 3, pp. 902-907, May-Jun. 1993.
    • (1993) IEEE Trans. Syst., Man, Cybern. , vol.23 , Issue.3 , pp. 902-907
    • Glockner, A.1    Pasquale, J.2
  • 34
    • 1142292504 scopus 로고    scopus 로고
    • Task allocation using a market-based planning mechanism
    • Melbourne, Australia
    • D. Goldberg, V. Cicirello, and M. B. Dias, "Task allocation using a market-based planning mechanism," in Proc. Int. Conf. AAMAS'03, vol. 2, Melbourne, Australia, 2003, pp. 996-997.
    • (2003) Proc. Int. Conf. AAMAS'03 , vol.2 , pp. 996-997
    • Goldberg, D.1    Cicirello, V.2    Dias, M.B.3
  • 35
    • 0031121228 scopus 로고    scopus 로고
    • Bidding-based process planning and scheduling in a multi-agent system
    • P. Gu, S. Balasubramanian, and D. H. Norrie, "Bidding-based process planning and scheduling in a multi-agent system," Comput. Ind. Eng., vol. 32, no. 2, pp. 477-496, 1997.
    • (1997) Comput. Ind. Eng. , vol.32 , Issue.2 , pp. 477-496
    • Gu, P.1    Balasubramanian, S.2    Norrie, D.H.3
  • 36
    • 0029510875 scopus 로고
    • Application of decentralized cooperative problem solving in dynamic flexible scheduling
    • Bellingham, WA
    • Z. Guan, M. Lei, B. Wu, Y. Wu, and S. Yang, "Application of decentralized cooperative problem solving in dynamic flexible scheduling," in Proc. SPIE, Bellingham, WA, 1995, pp. 179-183.
    • (1995) Proc. SPIE , pp. 179-183
    • Guan, Z.1    Lei, M.2    Wu, B.3    Wu, Y.4    Yang, S.5
  • 37
    • 0032306219 scopus 로고    scopus 로고
    • Fuzzy logic based intelligent selection of machining parameters
    • K. Hashmi, M. A. El Baradie, and M. Ryan, "Fuzzy logic based intelligent selection of machining parameters," Comput. Ind. Eng., vol. 35, no. 3-4, pp. 571-574, 1998.
    • (1998) Comput. Ind. Eng. , vol.35 , Issue.3-4 , pp. 571-574
    • Hashmi, K.1    El Baradie, M.A.2    Ryan, M.3
  • 38
    • 0027835943 scopus 로고
    • Multi-agent knowledge-based system for planning and scheduling medical tests
    • Jun. 13-16
    • L. T. Herren, B. L. Robey, and P. K. Fink, "Multi-agent knowledge-based system for planning and scheduling medical tests," in Proc. IEEE Symp. Comput-Based Med. Syst., Jun. 13-16, 1993, pp. 159-164.
    • (1993) Proc. IEEE Symp. Comput-Based Med. Syst. , pp. 159-164
    • Herren, L.T.1    Robey, B.L.2    Fink, P.K.3
  • 39
    • 1342302588 scopus 로고    scopus 로고
    • Affordable space systems manufacturing: Intelligent synthesis technology, process planning, and production scheduling
    • Pittsburgh, US, DETC2001/CIE-21281
    • J. W. Herrmann, M. Eleischer, E. Lin, V. Mathur, and J. Glasser, "Affordable space systems manufacturing: Intelligent synthesis technology, process planning, and production scheduling," presented at the ASME DETC/CIE 2001, Pittsburgh, US, 2001, DETC2001/CIE-21281.
    • (2001) Presented at the ASME DETC/CIE 2001
    • Herrmann, J.W.1    Eleischer, M.2    Lin, E.3    Mathur, V.4    Glasser, J.5
  • 40
    • 0036721870 scopus 로고    scopus 로고
    • Evaluation of agent-based manufacturing systems based on a parallel simulator
    • C. Y. Huang and S. Y. Nof, "Evaluation of agent-based manufacturing systems based on a parallel simulator," Comput. Ind. Eng., vol. 43, pp. 529-552, 2002.
    • (2002) Comput. Ind. Eng. , vol.43 , pp. 529-552
    • Huang, C.Y.1    Nof, S.Y.2
  • 41
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • S. H. Huang, H. C. Zhang, and M. L. Smith, "A progressive approach for the integration of process planning and scheduling," IEE Trans., vol. 27, no. 4, pp. 456-464, 1995.
    • (1995) IEE Trans. , vol.27 , Issue.4 , pp. 456-464
    • Huang, S.H.1    Zhang, H.C.2    Smith, M.L.3
  • 43
    • 84973774282 scopus 로고
    • Active rescheduling and collaboration in dynamic manufacturing systems
    • L. D. Interrante and D. M. Rochowiak, "Active rescheduling and collaboration in dynamic manufacturing systems," Concurrent Eng.: Res. Appl., vol. 2, no. 2, pp. 97-105, 1994.
    • (1994) Concurrent Eng.: Res. Appl. , vol.2 , Issue.2 , pp. 97-105
    • Interrante, L.D.1    Rochowiak, D.M.2
  • 45
    • 0003059040 scopus 로고
    • Prismatic part feature extraction and feature-based tool path selection
    • J. Y. Jung and R. S. Ahluwalia, "Prismatic part feature extraction and feature-based tool path selection," J. Des. Manuf., vol. 3, no. 1, pp. 1-19, 1993.
    • (1993) J. Des. Manuf. , vol.3 , Issue.1 , pp. 1-19
    • Jung, J.Y.1    Ahluwalia, R.S.2
  • 46
    • 0029733731 scopus 로고    scopus 로고
    • Acollaborative process planning and scheduling system
    • J. Kempenaers, J. Pinte, J. Detand, and J. P. Kruth, "Acollaborative process planning and scheduling system," Adv. Eng. Softw., vol. 25, no. 1, pp. 3-8, 1996.
    • (1996) Adv. Eng. Softw. , vol.25 , Issue.1 , pp. 3-8
    • Kempenaers, J.1    Pinte, J.2    Detand, J.3    Kruth, J.P.4
  • 47
    • 0032690982 scopus 로고    scopus 로고
    • Scheduling in a production environment with multiple process plans per job
    • K. H. Kim and P. J. Egbelu, "Scheduling in a production environment with multiple process plans per job," Int. J. Prod. Res., vol. 37, no. 12, pp. 2725-2753, 1999.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.12 , pp. 2725-2753
    • Kim, K.H.1    Egbelu, P.J.2
  • 48
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • S. Kirkpatrick, C. D. Gelatt, and M. P. Vecchi, "Optimization by simulated annealing," Science, vol. 220, pp. 671-680, 1983.
    • (1983) Science , vol.220 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 49
    • 0031069104 scopus 로고    scopus 로고
    • Using multi-agent architecture in FMS for dynamic scheduling
    • K. Kouiss, H. Pierreval, and N. Mebarki, "Using multi-agent architecture in FMS for dynamic scheduling," J. Intell. Manuf., vol. 8, no. 1, pp. 41-47, 1997.
    • (1997) J. Intell. Manuf. , vol.8 , Issue.1 , pp. 41-47
    • Kouiss, K.1    Pierreval, H.2    Mebarki, N.3
  • 50
    • 1442302499 scopus 로고    scopus 로고
    • Flexible manufacturing process planning based on the multi-agent technology
    • Innsbruck, Austria, Feb. 10-13
    • S. Kornienko, O. Kornienko, and P. Levi, "Flexible manufacturing process planning based on the multi-agent technology," in Proc. 21st IASTED Int. Conf. Applied Informatics, Innsbruck, Austria, Feb. 10-13, 2003, pp. 156-161.
    • (2003) Proc. 21st IASTED Int. Conf. Applied Informatics , pp. 156-161
    • Kornienko, S.1    Kornienko, O.2    Levi, P.3
  • 51
    • 0027073047 scopus 로고
    • A CAPP system for nonlinear process plans
    • J. P. Kruth and J. Detand, "A CAPP system for nonlinear process plans," Ann. CIRP, vol. 41, no. 1, pp. 489-492, 1992.
    • (1992) Ann. CIRP , vol.41 , Issue.1 , pp. 489-492
    • Kruth, J.P.1    Detand, J.2
  • 52
    • 0035175069 scopus 로고    scopus 로고
    • Integration of process planning and scheduling using simulation based genetic algorithms
    • H. Lee and S. S. Kim, "Integration of process planning and scheduling using simulation based genetic algorithms," Int. J. Adv. Manuf. Technol., vol. 18, no. 8, pp. 606-590, 2001.
    • (2001) Int. J. Adv. Manuf. Technol. , vol.18 , Issue.8 , pp. 606-590
    • Lee, H.1    Kim, S.S.2
  • 53
    • 0001076077 scopus 로고
    • Flexible process sequencing using Petri net theory
    • K. Y. Lee and M. Y. Jung, "Flexible process sequencing using Petri net theory," Comput. Ind. Eng., vol. 28, no. 2, pp. 279-290, 1995.
    • (1995) Comput. Ind. Eng. , vol.28 , Issue.2 , pp. 279-290
    • Lee, K.Y.1    Jung, M.Y.2
  • 54
    • 0141885117 scopus 로고    scopus 로고
    • Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism
    • Y. Lee, S. R. Kumara, and K. Chatterjee, "Multiagent based dynamic resource scheduling for distributed multiple projects using a market mechanism," J. Intell. Manuf., vol. 14, no. 5, pp. 471-484, 2003.
    • (2003) J. Intell. Manuf. , vol.14 , Issue.5 , pp. 471-484
    • Lee, Y.1    Kumara, S.R.2    Chatterjee, K.3
  • 55
    • 33748435526 scopus 로고    scopus 로고
    • APPSS-An agent-based dynamic process planning and scheduling system
    • M. Lim and Z. Zhang, "APPSS-An agent-based dynamic process planning and scheduling system," in Proc. Volume from the IFAC Workshop, 2000, pp. 51-56.
    • (2000) Proc. Volume from the IFAC Workshop , pp. 51-56
    • Lim, M.1    Zhang, Z.2
  • 57
    • 0242265501 scopus 로고    scopus 로고
    • Conversation specification-A schema-based approach to specifying conversation policies
    • F. Dignum and M. Greaves, Eds. Lecture Notes in Computer Science, New York: Springer-Verlag
    • F. Lin, D. H. Norrie, W. Shen, and R. Kremer, "Conversation specification-A schema-based approach to specifying conversation policies," in Issues in Agent Communication, F. Dignum and M. Greaves, Eds. Lecture Notes in Computer Science, vol. 1916, New York: Springer-Verlag, 2000, pp. 193-204.
    • (2000) Issues in Agent Communication , vol.1916 , pp. 193-204
    • Lin, F.1    Norrie, D.H.2    Shen, W.3    Kremer, R.4
  • 58
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • G. Y. J. Lin and J. J. Solberg, "Integrated shop floor control using autonomous agents," IIE Trans.: Des. Manuf., vol. 24, no. 3, pp. 57-71, 1992.
    • (1992) IIE Trans.: Des. Manuf. , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.J.1    Solberg, J.J.2
  • 60
    • 0000762544 scopus 로고
    • Exploiting problem structure for distributed constraint optimization
    • -, "Exploiting problem structure for distributed constraint optimization," in Proc. 1st Int. Conf. Multi-Agent Systems, 1995, pp. 246-253.
    • (1995) Proc. 1st Int. Conf. Multi-Agent Systems , pp. 246-253
    • Liu, J.1    Sycara, K.P.2
  • 61
    • 0035838752 scopus 로고    scopus 로고
    • An agent-based production control framework for multiple-line collaborative manufacturing
    • T. P. Lu and Y. Yih, "An agent-based production control framework for multiple-line collaborative manufacturing," Int. J. Prod. Res., vol. 39, no. 10, pp. 2155-2176, 2001.
    • (2001) Int. J. Prod. Res. , vol.39 , Issue.10 , pp. 2155-2176
    • Lu, T.P.1    Yih, Y.2
  • 62
    • 79953758495 scopus 로고    scopus 로고
    • Online integration of process planning module with production scheduling
    • A. G. Mamalis, I. Malagardis, and K. Kanbouris, "online integration of process planning module with production scheduling," Int. J. Adv. Manuf. Technol., vol. 12, no. 5, pp. 330-338, 1996.
    • (1996) Int. J. Adv. Manuf. Technol. , vol.12 , Issue.5 , pp. 330-338
    • Mamalis, A.G.1    Malagardis, I.2    Kanbouris, K.3
  • 64
    • 0032663605 scopus 로고    scopus 로고
    • MetaMorph: An adaptive agentbased architecture for intelligent manufacturing
    • F. Maturana, W. Shen, and D. H. Norrie, "MetaMorph: An adaptive agentbased architecture for intelligent manufacturing," Int. J. Prod. Res., vol. 37, no. 10, pp. 2159-2174, 1999.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.10 , pp. 2159-2174
    • Maturana, F.1    Shen, W.2    Norrie, D.H.3
  • 66
    • 0032628935 scopus 로고    scopus 로고
    • A cascading auction protocol as a framework for integrating process planning and heterarchical shop floor control
    • P. McDonnell, G. Smith, S. Joshi, and S. R. T. Kumara, "A cascading auction protocol as a framework for integrating process planning and heterarchical shop floor control," Int. J. Flexible Manuf. Syst., vol. 11, no. 1, pp. 37-62, 1999.
    • (1999) Int. J. Flexible Manuf. Syst. , vol.11 , Issue.1 , pp. 37-62
    • McDonnell, P.1    Smith, G.2    Joshi, S.3    Kumara, S.R.T.4
  • 67
    • 0034286607 scopus 로고    scopus 로고
    • Developments in holonic production planning and control
    • D. C. McFarlane and S. Bussmann, "Developments in holonic production planning and control," Prod. Planning Control, vol. 11, no. 6, pp. 522-536, 2000.
    • (2000) Prod. Planning Control , vol.11 , Issue.6 , pp. 522-536
    • McFarlane, D.C.1    Bussmann, S.2
  • 68
    • 0032050336 scopus 로고    scopus 로고
    • CAMPS: A constraint-based architecture for multi-agent planning and scheduling
    • K. Miyashita, "CAMPS: A constraint-based architecture for multi-agent planning and scheduling," J. Intell. Manuf., vol. 9, no. 2, pp. 147-154, 1998.
    • (1998) J. Intell. Manuf. , vol.9 , Issue.2 , pp. 147-154
    • Miyashita, K.1
  • 69
    • 0034318021 scopus 로고    scopus 로고
    • Satisfying various requirements in different levels and stages of machining using one general ANNbased process model
    • L. Monostori, Z. J. Viharos, and S. Markos, "Satisfying various requirements in different levels and stages of machining using one general ANNbased process model," J. Mater. Process. Technol., vol. 107, pp. 228-235, 2000.
    • (2000) J. Mater. Process. Technol. , vol.107 , pp. 228-235
    • Monostori, L.1    Viharos, Z.J.2    Markos, S.3
  • 70
    • 0032642660 scopus 로고    scopus 로고
    • Genetic algorithms in integrated process planning and scheduling
    • N. Morad and A. Zalzala, "Genetic algorithms in integrated process planning and scheduling," J. Intell. Manuf., vol. 6, pp. 169-179, 1999.
    • (1999) J. Intell. Manuf. , vol.6 , pp. 169-179
    • Morad, N.1    Zalzala, A.2
  • 71
    • 84957662973 scopus 로고    scopus 로고
    • Some issues in the design of marketoriented agents
    • M. Wooldridge, J. P. Müller, and M. Tambe, Eds. Lecture Notes in Artificial Intelligence, New York: Springer-Verlag
    • T. Mullen and M. P. Wellman, "Some issues in the design of marketoriented agents," in Intelligent Agents II: Agent Theories, Architectures, and Languages, M. Wooldridge, J. P. Müller, and M. Tambe, Eds. Lecture Notes in Artificial Intelligence, vol. 1037, New York: Springer-Verlag, 1996, pp. 283-298.
    • (1996) Intelligent Agents II: Agent Theories, Architectures, and Languages , vol.1037 , pp. 283-298
    • Mullen, T.1    Wellman, M.P.2
  • 73
    • 84922830355 scopus 로고    scopus 로고
    • Nat. Center for Manuf. Sci. Ann Arbor, MI, Tech. Rep.
    • NCMS, "Shop floor agents," Nat. Center for Manuf. Sci. Ann Arbor, MI, Tech. Rep., 1998.
    • (1998) Shop Floor Agents
    • NCMS1
  • 74
    • 0012781929 scopus 로고
    • Mechanized process selection for planning new designs
    • Paper 737
    • B. W. Nieble, "Mechanized process selection for planning new designs," presented at the ASTME, 1965, Paper 737.
    • (1965) Presented at the ASTME
    • Nieble, B.W.1
  • 75
    • 0030129839 scopus 로고    scopus 로고
    • Fuzzy-set-based approach for concurrent constraint setup planning
    • S. K. Ong and A. Y. C. Nee, "Fuzzy-set-based approach for concurrent constraint setup planning," J. Intell. Manuf., vol. 7, no. 2, pp. 107-120, 1996.
    • (1996) J. Intell. Manuf. , vol.7 , Issue.2 , pp. 107-120
    • Ong, S.K.1    Nee, A.Y.C.2
  • 77
    • 0000481860 scopus 로고    scopus 로고
    • A simulated annealing approach to integrated production scheduling
    • G. J. Palmer, "A simulated annealing approach to integrated production scheduling," J. Intell. Manuf., vol. 7, no. 3, pp. 163-176, 1996.
    • (1996) J. Intell. Manuf. , vol.7 , Issue.3 , pp. 163-176
    • Palmer, G.J.1
  • 78
    • 0032599586 scopus 로고    scopus 로고
    • Enhancing manufacturing product development through learning agent system over internet
    • H. G. Park and J. M. Baik, "Enhancing manufacturing product development through learning agent system over internet," Comput. Ind. Eng., vol. 37, pp. 117-120, 1999.
    • (1999) Comput. Ind. Eng. , vol.37 , pp. 117-120
    • Park, H.G.1    Baik, J.M.2
  • 79
    • 0030673502 scopus 로고    scopus 로고
    • The AARIA agent architecture: An example of requirements-driven agent-based system design
    • Marina del Rey, CA
    • V. D. Parunak, A. D. Baker, and S. J. Clark, "The AARIA agent architecture: An example of requirements-driven agent-based system design," presented at the 1st Int. Conf. Autonomous Agents, Marina del Rey, CA, 1997.
    • (1997) Presented at the 1st Int. Conf. Autonomous Agents
    • Parunak, V.D.1    Baker, A.D.2    Clark, S.J.3
  • 80
    • 0001538571 scopus 로고
    • Manufacturing experience with the contract net
    • M.N. Huhns, Ed. New York: Pitman
    • V. D. Parunak, "Manufacturing experience with the contract net," in Distributed Artificial Intelligence, M.N. Huhns, Ed. New York: Pitman, 1987, pp. 285-310.
    • (1987) Distributed Artificial Intelligence , pp. 285-310
    • Parunak, V.D.1
  • 81
    • 0042132834 scopus 로고
    • MASCOT: Avirtual factory for research and development inmanufacturing scheduling and control
    • -, "MASCOT: Avirtual factory for research and development inmanufacturing scheduling and control," Ind. Technol. Inst., Tech. Memo. 93-02, 1993.
    • (1993) Ind. Technol. Inst., Tech. Memo. 93-02
    • Parunak, V.D.1
  • 83
    • 0008649140 scopus 로고
    • Evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems
    • Montreal, QC, Canada
    • A. Saad, G. Biswas, K. Kawamura, M. E. Johnson, and A. Salama, "Evaluation of contract net-based heterarchical scheduling for flexible manufacturing systems," in Proc. 1995 IJCAI'95, Workshop Intell. Manuf., Montreal, QC, Canada, 1995, pp. 310-321.
    • (1995) Proc. 1995 IJCAI'95, Workshop Intell. Manuf. , pp. 310-321
    • Saad, A.1    Biswas, G.2    Kawamura, K.3    Johnson, M.E.4    Salama, A.5
  • 85
    • 0003101953 scopus 로고
    • Issues in automated negotiation and electronic commerce: Extending the contract net framework
    • T. Sandholm and V. Lesser, "Issues in automated negotiation and electronic commerce: Extending the contract net framework," in Proc. 1st Int. Conf. Multi-Agent Systems, 1995, pp. 328-335.
    • (1995) Proc. 1st Int. Conf. Multi-Agent Systems , pp. 328-335
    • Sandholm, T.1    Lesser, V.2
  • 87
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing systems
    • C. Saygin and S. E. Kilic, "Integrating flexible process plans with scheduling in flexible manufacturing systems," Int. J. Adv. Manuf. Technol., vol. 15, no. 4, pp. 268-280, 1999.
    • (1999) Int. J. Adv. Manuf. Technol. , vol.15 , Issue.4 , pp. 268-280
    • Saygin, C.1    Kilic, S.E.2
  • 89
    • 0023830408 scopus 로고
    • Dynamic scheduling in cellular manufacturing systems: A framework for networked decision making
    • M. J. Shaw, "Dynamic scheduling in cellular manufacturing systems: A framework for networked decision making," J. Manuf. Syst., vol. 7, no. 2, pp. 83-94, 1988.
    • (1988) J. Manuf. Syst. , vol.7 , Issue.2 , pp. 83-94
    • Shaw, M.J.1
  • 92
    • 85133749042 scopus 로고    scopus 로고
    • Agent-based systems for intelligent manufacturing: A state-of-the-art survey
    • W. Shen and D. H. Norrie, "Agent-based systems for intelligent manufacturing: A state-of-the-art survey," Knowl. Inf. Syst., vol. 1, no. 2, pp. 129-156, 1999.
    • (1999) Knowl. Inf. Syst. , vol.1 , Issue.2 , pp. 129-156
    • Shen, W.1    Norrie, D.H.2
  • 95
    • 0036200385 scopus 로고    scopus 로고
    • Distributed manufacturing scheduling using intelligent agents
    • Jan./Feb.
    • W. Shen, "Distributed manufacturing scheduling using intelligent agents," IEEE Expert/Intell. Syst., vol. 17, no. 1, pp. 88-94, Jan./Feb. 2002.
    • (2002) IEEE Expert/Intell. Syst. , vol.17 , Issue.1 , pp. 88-94
    • Shen, W.1
  • 96
    • 0036340742 scopus 로고    scopus 로고
    • Genetic algorithms in agent-based manufacturing scheduling systems
    • -, "Genetic algorithms in agent-based manufacturing scheduling systems," Integr. Comput.-Aided Eng., vol. 9, no. 3, pp. 207-218, 2002.
    • (2002) Integr. Comput.-Aided Eng. , vol.9 , Issue.3 , pp. 207-218
    • Shen, W.1
  • 98
    • 0141954033 scopus 로고    scopus 로고
    • Editorial of the special issue on agent-based manufacturing process planning and scheduling
    • W. Shen and H. Ghenniwa, "Editorial of the special issue on agent-based manufacturing process planning and scheduling," J. Intell. Manuf., vol. 14, no. 5, pp. 427-428, 2003.
    • (2003) J. Intell. Manuf. , vol.14 , Issue.5 , pp. 427-428
    • Shen, W.1    Ghenniwa, H.2
  • 99
    • 0029369568 scopus 로고
    • Distributed artificial intelligence in manufacturing systems control
    • W. Shih and K. Srihari, "Distributed artificial intelligence in manufacturing systems control," Comput. Ind. Eng., vol. 29, no. 1-4, pp. 199-203, 1995.
    • (1995) Comput. Ind. Eng. , vol.29 , Issue.1-4 , pp. 199-203
    • Shih, W.1    Srihari, K.2
  • 100
    • 84958056416 scopus 로고    scopus 로고
    • An architecture for multi-agent negotiation using private preferences in ameeting scheduler
    • T. Shintani and T. Ito, "An architecture for multi-agent negotiation using private preferences in ameeting scheduler," in Proc. 5th PRICAI'98, 1998, pp. 47-60.
    • (1998) Proc. 5th PRICAI'98 , pp. 47-60
    • Shintani, T.1    Ito, T.2
  • 101
    • 0031142080 scopus 로고    scopus 로고
    • Coordination mechanisms for multiagent manufacturing systems: Applications to integrated manufacturing scheduling
    • May
    • R. Sikora and M. J. Shaw, "Coordination mechanisms for multiagent manufacturing systems: Applications to integrated manufacturing scheduling," IEEE Trans. Eng. Manage., vol. 44, no. 2, pp. 175-187, May 1997.
    • (1997) IEEE Trans. Eng. Manage. , vol.44 , Issue.2 , pp. 175-187
    • Sikora, R.1    Shaw, M.J.2
  • 102
    • 0032311567 scopus 로고    scopus 로고
    • A multi-agent approach to process planning and fabrication in distributed manufacturing
    • A. Sluga, P. Butala, and G. Bervar, "A multi-agent approach to process planning and fabrication in distributed manufacturing," Comput. Ind. Eng., vol. 35, no. 3-4, pp. 455-460, 1998.
    • (1998) Comput. Ind. Eng. , vol.35 , Issue.3-4 , pp. 455-460
    • Sluga, A.1    Butala, P.2    Bervar, G.3
  • 103
    • 77951547981 scopus 로고    scopus 로고
    • CyberCut: A world wide web based design-to-fabrication tool
    • C. S. Smith and P. K. Right, "CyberCut: A world wide web based design-to-fabrication tool," J. Manuf. Syst., vol. 15, no. 6, pp. 432-442, 1996.
    • (1996) J. Manuf. Syst. , vol.15 , Issue.6 , pp. 432-442
    • Smith, C.S.1    Right, P.K.2
  • 104
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • R. G. Smith, "The contract net protocol: High-level communication and control in a distributed problem solver," IEEE Trans. Comput., vol. C-29, no. 12, pp. 1104-1113, 1980.
    • (1980) IEEE Trans. Comput. , vol.C-29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 105
    • 0002926111 scopus 로고    scopus 로고
    • Process planning knowledge representation using an object-oriented data model
    • D. N. Sormaz and B. Khoshnevis, "Process planning knowledge representation using an object-oriented data model," Int. J. Comput. Integr. Manuf., vol. 10, no. 1-4, pp. 92-104, 1997.
    • (1997) Int. J. Comput. Integr. Manuf. , vol.10 , Issue.1-4 , pp. 92-104
    • Sormaz, D.N.1    Khoshnevis, B.2
  • 106
    • 0032045595 scopus 로고    scopus 로고
    • A dynamic scheduling holon for manufacturing orders
    • P. Sousa and C. Ramos, "A dynamic scheduling holon for manufacturing orders," J. Intell. Manuf., vol. 9, no. 2, pp. 107-112, 1997.
    • (1997) J. Intell. Manuf. , vol.9 , Issue.2 , pp. 107-112
    • Sousa, P.1    Ramos, C.2
  • 107
    • 0141988707 scopus 로고    scopus 로고
    • The Fabricare scheduling prototype suite: Agent interaction and knowledge base
    • P. Sousa, C. Ramos, and J. Neves, "The Fabricare scheduling prototype suite: Agent interaction and knowledge base," J. Intell. Manuf., vol. 14, no. 5, pp. 441-456, 2003.
    • (2003) J. Intell. Manuf. , vol.14 , Issue.5 , pp. 441-456
    • Sousa, P.1    Ramos, C.2    Neves, J.3
  • 108
    • 85101988175 scopus 로고    scopus 로고
    • A knowledge-based system for machining operation planning in feature based, open-architecture manufacturing
    • Irvine, CA
    • J. A. Stori and P. K. Wright, "A knowledge-based system for machining operation planning in feature based, open-architecture manufacturing," presented at the ASME Design Technical Conf., Irvine, CA, 1996.
    • (1996) Presented at the ASME Design Technical Conf
    • Stori, J.A.1    Wright, P.K.2
  • 110
    • 0035836316 scopus 로고    scopus 로고
    • A distributed multi-agent environment for product design and manufacturing planning
    • J. Sun, Y. F. Zhang, and A. Y. C. Nee, "A distributed multi-agent environment for product design and manufacturing planning," Int. J. Prod. Res., vol. 39, no. 4, pp. 625-645, 2001.
    • (2001) Int. J. Prod. Res. , vol.39 , Issue.4 , pp. 625-645
    • Sun, J.1    Zhang, Y.F.2    Nee, A.Y.C.3
  • 111
    • 0026103848 scopus 로고
    • Resource allocation in distributed factory scheduling
    • M. Zweben and M. S. Fox, Eds. San Francisco, CA: Morgan Kaufmann
    • K. P. Sycara, S. Oth, N. Sadeh, and M. S. Fox, "Resource allocation in distributed factory scheduling," in Intelligent Scheduling, M. Zweben and M. S. Fox, Eds. San Francisco, CA: Morgan Kaufmann, 1991, pp. 29-40.
    • (1991) Intelligent Scheduling , pp. 29-40
    • Sycara, K.P.1    Oth, S.2    Sadeh, N.3    Fox, M.S.4
  • 112
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and scheduling-A review
    • W. Tan, "Integration of process planning and scheduling-A review," J. Intell. Manuf., vol. 11, pp. 51-63, 2000.
    • (2000) J. Intell. Manuf. , vol.11 , pp. 51-63
    • Tan, W.1
  • 113
    • 0031647536 scopus 로고    scopus 로고
    • Hybrid production control approach for JIT scheduling
    • D. Trentesaux, C. Tahon, and P. Ladet, "Hybrid production control approach for JIT scheduling," Artif. Intell. Eng., vol. 12, no. 1, pp. 49-67, 1998.
    • (1998) Artif. Intell. Eng. , vol.12 , Issue.1 , pp. 49-67
    • Trentesaux, D.1    Tahon, C.2    Ladet, P.3
  • 114
    • 0028497724 scopus 로고
    • Recognizingmultiple interpretations of interacting machining features
    • Y. J. Tseng and S. B. Joshi, "Recognizingmultiple interpretations of interacting machining features," Comput.-Aided Des., vol. 26, no. 9, pp. 667-688, 1994.
    • (1994) Comput.-Aided Des. , vol.26 , Issue.9 , pp. 667-688
    • Tseng, Y.J.1    Joshi, S.B.2
  • 115
    • 0033875844 scopus 로고    scopus 로고
    • Computer-aided process planning in virtual one-of-A-kind production
    • Y. Tu, X. Chu, and W. Yang, "Computer-aided process planning in virtual one-of-a-kind production," Comput. Ind., vol. 41, pp. 99-110, 2000.
    • (2000) Comput. Ind. , vol.41 , pp. 99-110
    • Tu, Y.1    Chu, X.2    Yang, W.3
  • 116
    • 0141885118 scopus 로고    scopus 로고
    • Negotiation-based routing in job shops via collaborative agents
    • J. M. Usher, "Negotiation-based routing in job shops via collaborative agents," J. Intell. Manuf., vol. 14, no. 5, pp. 485-499, 2003.
    • (2003) J. Intell. Manuf. , vol.14 , Issue.5 , pp. 485-499
    • Usher, J.M.1
  • 117
    • 0032202527 scopus 로고    scopus 로고
    • Reference architecture for holonic manufacturing systems: PROSA
    • H. V. Brussel, J. Wyns, P. Valckenaers, L. Bongaerts, and P. Peeters, "Reference architecture for holonic manufacturing systems: PROSA," Comput. Ind., vol. 37, no. 3, pp. 255-274, 1998.
    • (1998) Comput. Ind. , vol.37 , Issue.3 , pp. 255-274
    • Brussel, H.V.1    Wyns, J.2    Valckenaers, P.3    Bongaerts, L.4    Peeters, P.5
  • 118
    • 0012797419 scopus 로고
    • Knowledge-based selection and sequencing of hole-making operations for prismatic parts
    • G. C. Vosniakos and B. J. Davies, "Knowledge-based selection and sequencing of hole-making operations for prismatic parts," Int. J. Adv. Manuf. Technol., vol. 8, pp. 9-16, 1993.
    • (1993) Int. J. Adv. Manuf. Technol. , vol.8 , pp. 9-16
    • Vosniakos, G.C.1    Davies, B.J.2
  • 119
    • 0012797418 scopus 로고    scopus 로고
    • Process planning and control in a holonic manufacturing environment
    • L. Wang and D. H. Norrie, "Process planning and control in a holonic manufacturing environment," J. Appl. Syst. Stud., vol. 2, no. 1, pp. 106-126, 2001.
    • (2001) J. Appl. Syst. Stud. , vol.2 , Issue.1 , pp. 106-126
    • Wang, L.1    Norrie, D.H.2
  • 120
    • 0141988713 scopus 로고    scopus 로고
    • DPP: An agent-based approach for distributed process planning
    • L. Wang and W. Shen, "DPP: An agent-based approach for distributed process planning," J. Intell. Manuf., vol. 14, no. 5, pp. 429-440, 2003.
    • (2003) J. Intell. Manuf. , vol.14 , Issue.5 , pp. 429-440
    • Wang, L.1    Shen, W.2
  • 122
    • 0242576359 scopus 로고    scopus 로고
    • An adaptive negotiation framework for agent based dynamic manufacturing scheduling
    • Washington, DC, Oct. 5-8
    • C. Wang, W. Shen, and H. Ghenniwa, "An adaptive negotiation framework for agent based dynamic manufacturing scheduling," in Proc. IEEE SMC, vol. 2, Washington, DC, Oct. 5-8, 2003, pp. 1211-1216.
    • (2003) Proc. IEEE SMC , vol.2 , pp. 1211-1216
    • Wang, C.1    Shen, W.2    Ghenniwa, H.3
  • 123
    • 0032044735 scopus 로고    scopus 로고
    • Modelling with colored timed object-oriented petri nets for automated manufacturing systems
    • L. C. Wang and S. Y. Wu, "Modelling with colored timed object-oriented petri nets for automated manufacturing systems," Comput. Ind. Eng., vol. 34, no. 2, pp. 463-480, 1998.
    • (1998) Comput. Ind. Eng. , vol.34 , Issue.2 , pp. 463-480
    • Wang, L.C.1    Wu, S.Y.2
  • 124
    • 0142247355 scopus 로고    scopus 로고
    • A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems
    • Y. H. Wang, C. W. Yin, and Y. Zhang, "A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems," Int. J. Comput. Integ. Manuf., vol. 16, no. 2, pp. 81-92, 2003.
    • (2003) Int. J. Comput. Integ. Manuf. , vol.16 , Issue.2 , pp. 81-92
    • Wang, Y.H.1    Yin, C.W.2    Zhang, Y.3
  • 125
    • 0031637226 scopus 로고    scopus 로고
    • Object-oriented and fuzzy-set-based approach for setup planning
    • R. R. Wu and H. M. Zhang, "Object-oriented and fuzzy-set-based approach for setup planning," Int. J. Adv. Manuf. Technol., vol. 14, pp. 406-411, 1998.
    • (1998) Int. J. Adv. Manuf. Technol. , vol.14 , pp. 406-411
    • Wu, R.R.1    Zhang, H.M.2
  • 128
    • 1542605225 scopus 로고    scopus 로고
    • Internet scheduling environment with market driven agents
    • Mar.
    • B. P.-C. Yen and O.Q. Wu, "Internet scheduling environment with market driven agents," IEEE Trans. Syst., Man, Cybern. A, Syst., Humans, vol. 34, no. 2, pp. 281-289, Mar. 2004.
    • (2004) IEEE Trans. Syst., Man, Cybern. A, Syst., Humans , vol.34 , Issue.2 , pp. 281-289
    • Yen, B.P.-C.1    Wu, O.Q.2
  • 129
    • 0031998178 scopus 로고    scopus 로고
    • Process sequence optimization based on a new cost-tolerance model
    • S. H. Yeo, B. K. A. Ngoi, and H. Chen, "Process sequence optimization based on a new cost-tolerance model," J. Intell. Manuf., vol. 9, pp. 29-37, 1998.
    • (1998) J. Intell. Manuf. , vol.9 , pp. 29-37
    • Yeo, S.H.1    Ngoi, B.K.A.2    Chen, H.3
  • 130
    • 0027151172 scopus 로고
    • IPPM-A prototype to integrate process planning and job shop scheduling functions
    • H. C. Zhang and E. Merchant, "IPPM-A prototype to integrate process planning and job shop scheduling functions," CIRP Ann., vol. 42, no. 1, pp. 513-518, 1993.
    • (1993) CIRP Ann. , vol.42 , Issue.1 , pp. 513-518
    • Zhang, H.C.1    Merchant, E.2
  • 131
    • 0031274424 scopus 로고    scopus 로고
    • Using genetic algorithms in process planning for job shop machining
    • Nov.
    • F. Zhang, Y. F. Zhang, and A. Y. C. Nee, "Using genetic algorithms in process planning for job shop machining," IEEE Trans. Evol. Comput., vol. 1, no. 4, pp. 278-289, Nov. 1997.
    • (1997) IEEE Trans. Evol. Comput. , vol.1 , Issue.4 , pp. 278-289
    • Zhang, F.1    Zhang, Y.F.2    Nee, A.Y.C.3
  • 132
    • 0033345048 scopus 로고    scopus 로고
    • Object oriented manufacturing resource modeling for adaptive process planning
    • Y. Zhang, S. C. Feng, X. Wang, W. Tian, and R. Wu, "Object oriented manufacturing resource modeling for adaptive process planning," Int. J. Prod. Res., vol. 37, no. 18, pp. 4179-4195, 1999.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.18 , pp. 4179-4195
    • Zhang, Y.1    Feng, S.C.2    Wang, X.3    Tian, W.4    Wu, R.5
  • 133
    • 0008942697 scopus 로고    scopus 로고
    • A cooperative framework for process planning
    • F. L. Zhao and P. S. Y. Wu, "A cooperative framework for process planning," Int. J. Comput. Integr. Manuf., vol. 12, no. 2, pp. 168-178, 1999.
    • (1999) Int. J. Comput. Integr. Manuf. , vol.12 , Issue.2 , pp. 168-178
    • Zhao, F.L.1    Wu, P.S.Y.2
  • 134
    • 0033889902 scopus 로고    scopus 로고
    • A cooperative agent modeling approach for process planning
    • F. L. Zhao, S. K. Tso, and P. S. Y. Wu, "A cooperative agent modeling approach for process planning," Comput. Ind., vol. 41, no. 1, pp. 83-97, 2000.
    • (2000) Comput. Ind. , vol.41 , Issue.1 , pp. 83-97
    • Zhao, F.L.1    Tso, S.K.2    Wu, P.S.Y.3
  • 135
    • 0029220198 scopus 로고
    • The integration of process planning and shop floor scheduling in small batch part manufacturing
    • W. H. M. Zijm, "The integration of process planning and shop floor scheduling in small batch part manufacturing," Ann. CIRP, vol. 44, no. 1, pp. 429-432, 1995.
    • (1995) Ann. CIRP , vol.44 , Issue.1 , pp. 429-432
    • Zijm, W.H.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.