메뉴 건너뛰기




Volumn 8, Issue 1, 1997, Pages 41-47

Using multi-agent architecture in FMS for dynamic scheduling

Author keywords

Dispatching rules; Dynamic scheduling; Flexible manufacturing systems; Multi agent system; Object oriented models; Simulation optimization

Indexed keywords

DYNAMIC PROGRAMMING; OBJECT ORIENTED PROGRAMMING; OPTIMIZATION; SCHEDULING;

EID: 0031069104     PISSN: 09565515     EISSN: None     Source Type: Journal    
DOI: 10.1023/A:1018540317470     Document Type: Article
Times cited : (135)

References (29)
  • 2
    • 84974747919 scopus 로고
    • Concurrent decisions in production management
    • special issue on 'AI in manufacturing and robotics'
    • Ayel, J. (1994) Concurrent decisions in production management. Integrated Computer-Aided Engineering Journal, special issue on 'AI in manufacturing and robotics'.
    • (1994) Integrated Computer-Aided Engineering Journal
    • Ayel, J.1
  • 3
    • 0021496929 scopus 로고
    • Sequencing rules and due-date assignments in a job-shop
    • Baker, K.R. (1984) Sequencing rules and due-date assignments in a job-shop. Management Science, 30, 1093-1104.
    • (1984) Management Science , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 5
    • 1442314416 scopus 로고
    • Pilotage d'un anneau flexible de production: Une approche définissant un comportement autonome par station
    • Marseilles, 15-17 December
    • Baptiste, P. and Manier, H. (1993) Pilotage d'un anneau flexible de production: une approche définissant un comportement autonome par station, in Proceedings of GSI4: Quatrième Congrès International de Génie Industriel, Marseilles, 15-17 December, pp. 117-126.
    • (1993) Proceedings of GSI4: Quatrième Congrès International de Génie Industriel , pp. 117-126
    • Baptiste, P.1    Manier, H.2
  • 7
    • 0022807123 scopus 로고
    • A SLAM II simulation study of a simplified flow shop
    • Barrett, R.T. and Barman, S. (1986) A SLAM II simulation study of a simplified flow shop. Simulation, 47, (November), 181-189.
    • (1986) Simulation , vol.47 , Issue.NOVEMBER , pp. 181-189
    • Barrett, R.T.1    Barman, S.2
  • 11
    • 0010842657 scopus 로고
    • A survey of priority rules for FMS scheduling and their performance for the benchmark problem
    • Tucson, AZ, December
    • Engell, S. and Moser, M. (1992) A survey of priority rules for FMS scheduling and their performance for the benchmark problem, in Proceedings of the 31st IEEE Conference on Decision and Control, Tucson, AZ, December, pp. 392-396.
    • (1992) Proceedings of the 31st IEEE Conference on Decision and Control , pp. 392-396
    • Engell, S.1    Moser, M.2
  • 16
    • 0000420958 scopus 로고
    • Intelligent agent systems for manufacturing applications
    • Kwok, A. and Norrie, D. (1993) Intelligent agent systems for manufacturing applications. Journal of Intelligent Manufacturing, 4, 285-293.
    • (1993) Journal of Intelligent Manufacturing , vol.4 , pp. 285-293
    • Kwok, A.1    Norrie, D.2
  • 23
    • 0004909888 scopus 로고
    • Expert system for selecting priority rules in flexible manufacturing systems
    • Pierreval, H. (1992) Expert system for selecting priority rules in flexible manufacturing systems. Expert Systems with Applications, 5, 51-57.
    • (1992) Expert Systems with Applications , vol.5 , pp. 51-57
    • Pierreval, H.1
  • 25
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russel, R., Dar-EL, E.M. and Taylor, B.W. (1987) A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research, 25, 1523-1540.
    • (1987) International Journal of Production Research , vol.25 , pp. 1523-1540
    • Russel, R.1    Dar-El, E.M.2    Taylor, B.W.3
  • 26
    • 0024303126 scopus 로고
    • An expediting heuristic for the shortest processing time dispatching rule
    • Schultz, C.R. (1989) An expediting heuristic for the shortest processing time dispatching rule. International Journal of Production Research, 1, 31-41.
    • (1989) International Journal of Production Research , vol.1 , pp. 31-41
    • Schultz, C.R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.