![]() |
Volumn 14, Issue 3, 2001, Pages 377-386
|
Minimizing maximum lateness in a single machine scheduling problem with fuzzy processing times and fuzzy due dates
|
Author keywords
Expected value; Fuzzy number; Maximum lateness; Necessity index; Possibility index; Scheduling; Single machine
|
Indexed keywords
ALGORITHMS;
DECISION MAKING;
DECISION THEORY;
FUZZY SETS;
PROBLEM SOLVING;
PROCESS ENGINEERING;
PRODUCTION ENGINEERING;
SCHEDULING;
LAWLER ALGORITHM;
ARTIFICIAL INTELLIGENCE;
|
EID: 0035369592
PISSN: 09521976
EISSN: None
Source Type: Journal
DOI: 10.1016/S0952-1976(01)00011-2 Document Type: Article |
Times cited : (58)
|
References (19)
|