메뉴 건너뛰기




Volumn , Issue , 2015, Pages

Integration of agent technology into manufacturing enterprise: A review and platform for industry 4.0

Author keywords

Agent and multi agents technology; industry 4.0; manufacturing enterprise level; reconfigurable manufacturing system

Indexed keywords

COMPUTER AIDED MANUFACTURING; INDUSTRY 4.0; MULTI AGENT SYSTEMS; SUPPLY CHAIN MANAGEMENT; SUPPLY CHAINS;

EID: 84931094611     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IEOM.2015.7093910     Document Type: Conference Paper
Times cited : (48)

References (81)
  • 6
    • 73149107277 scopus 로고    scopus 로고
    • Agent-based systems for manufacturing
    • L. Monostori, "Agent-based Systems for Manufacturing," CIRP Annals-Manufacturing Technology, 2006. 55(2): P. 697-720
    • (2006) CIRP Annals-Manufacturing Technology , vol.55 , Issue.2 , pp. 697-720
    • Monostori, L.1
  • 7
    • 30844467966 scopus 로고    scopus 로고
    • Development and applications of holonic manufacturing systems, a survey
    • R. F. Babiceanu, and F. F. Chen, "Development and Applications of Holonic Manufacturing Systems, a Survey," Journal of Intelligent Manufacturing, 2006. 17(1): P. 111-131
    • (2006) Journal of Intelligent Manufacturing , vol.17 , Issue.1 , pp. 111-131
    • Babiceanu, R.F.1    Chen, F.F.2
  • 8
    • 2442667823 scopus 로고    scopus 로고
    • Multi-agent systems in production planning and control: An overview
    • M. Caridi, and S. Cavalieri, "Multi-agent Systems in Production Planning and Control: An Overview," Production Planning & Control, 2004. 15(2): P. 106-118
    • (2004) Production Planning & Control , vol.15 , Issue.2 , pp. 106-118
    • Caridi, M.1    Cavalieri, S.2
  • 9
    • 71549136791 scopus 로고    scopus 로고
    • A framework to develop an analysis agent for evaluating human performance in manufacturing systems
    • M. Shahrokhi and A. Bernard, "A Framework to Develop an Analysis Agent for Evaluating Human Performance in Manufacturing Systems," CIRP Journal of Manufacturing Science and Technology 2 (2009) 55-60
    • (2009) CIRP Journal of Manufacturing Science and Technology , vol.2 , pp. 55-60
    • Shahrokhi, M.1    Bernard, A.2
  • 12
    • 33750480564 scopus 로고    scopus 로고
    • Applications of agent-based systems in intelligent manufacturing: An updated review
    • W. Shen, Q. Hao, H. J. Yoon and D. H. Norrie, "Applications of Agent-based Systems in Intelligent Manufacturing: An Updated Review" Advanced Engineering Informatics 20 (2006) 415-431
    • (2006) Advanced Engineering Informatics , vol.20 , pp. 415-431
    • Shen, W.1    Hao, Q.2    Yoon, H.J.3    Norrie, D.H.4
  • 13
    • 0141458073 scopus 로고    scopus 로고
    • Solving difficulties in integrating information from different partners and exploring dynamically changing planning and scheduling alternatives
    • A. Karageorgos, N. Mehandjiev, G. Wechhart and A. Hammerle (2003), "Solving Difficulties in Integrating Information from Different Partners and Exploring Dynamically Changing Planning and Scheduling Alternatives," Engineering Applications of Artificial Intelligence 16(2003) pp335-348
    • (2003) Engineering Applications of Artificial Intelligence , vol.16 , Issue.2003 , pp. 335-348
    • Karageorgos, A.1    Mehandjiev, N.2    Wechhart, G.3    Hammerle, A.4
  • 15
    • 84890860229 scopus 로고    scopus 로고
    • Investigating virtual enterprise models: Literature review and empirical findings
    • E. Esposito and P. Evangelista, "Investigating virtual enterprise models: literature review and empirical findings," International Journal of Production Economics 148, (2014) pp145-157
    • (2014) International Journal of Production Economics , vol.148 , pp. 145-157
    • Esposito, E.1    Evangelista, P.2
  • 18
    • 32644476109 scopus 로고    scopus 로고
    • An agent-based negotiation approach to integrate process planning and scheduling
    • 1 April
    • T. N. Wong, C. W. Leung, K. L. Mak and R. Y. K. Fung, "An agent-based negotiation approach to integrate process planning and scheduling," International Journal of Production Research, Vol. 44, No. 7, 1 April 2006, 1331-1351
    • (2006) International Journal of Production Research , vol.44 , Issue.7 , pp. 1331-1351
    • Wong, T.N.1    Leung, C.W.2    Mak, K.L.3    Fung, R.Y.K.4
  • 19
    • 74249095498 scopus 로고    scopus 로고
    • Capacity reconfiguration management in reconfigurable manufacturing systems
    • P. Renna, "Capacity Reconfiguration Management in Reconfigurable Manufacturing Systems," Int. Journal of Advanced Manufacturing Technology, (2010) 46:395-404
    • (2010) Int. Journal of Advanced Manufacturing Technology , vol.46 , pp. 395-404
    • Renna, P.1
  • 20
    • 30344469411 scopus 로고    scopus 로고
    • The application of multi-agent systems for step-nc computer aided process planning of prismatic components
    • A. S. T. Nassehi, S. T. Newman and R. D. Allen, "The Application of Multi-agent Systems for STEP-NC Computer Aided Process Planning of Prismatic Components," International Journal of Machine Tools & Manufacture 46 (2006) 559-574
    • (2006) International Journal of Machine Tools & Manufacture , vol.46 , pp. 559-574
    • Nassehi, A.S.T.1    Newman, S.T.2    Allen, R.D.3
  • 21
    • 71549136791 scopus 로고    scopus 로고
    • A framework to develop an analysis agent for evaluating human performance in manufacturing systems
    • M. Shahrokhi and A. Bernard, "A Framework to Develop an Analysis Agent for Evaluating Human Performance in Manufacturing Systems," CIRP Journal of Manufacturing Science and Technology 2 (2009) 55-60
    • (2009) CIRP Journal of Manufacturing Science and Technology , vol.2 , pp. 55-60
    • Shahrokhi, M.1    Bernard, A.2
  • 23
    • 84883883216 scopus 로고    scopus 로고
    • Multi-agent systems vs iec 61499 for holonic resource control in reconfigurable systems
    • K. Kruger and A. H. Basson, "Multi-Agent Systems vs IEC 61499 for Holonic Resource Control in Reconfigurable Systems," Procedia CIRP 7 (2013) 503 - 508
    • (2013) Procedia CIRP , vol.7 , pp. 503-508
    • Kruger, K.1    Basson, A.H.2
  • 24
    • 40649091620 scopus 로고    scopus 로고
    • Multi-agent based reconfigurable manufacturing execution system
    • M. Yu, W. Zhang and P. Klemm, "Multi-agent Based Reconfigurable Manufacturing Execution System," Proceedings of the 2007 IEEE IEEM, pp 718-722
    • Proceedings of the 2007 IEEE IEEM , pp. 718-722
    • Yu, M.1    Zhang, W.2    Klemm, P.3
  • 26
    • 84921538549 scopus 로고    scopus 로고
    • An agent-based peerto-peer architecture for semantic discovery of manufacturing services across virtual enterprises
    • iFirst article
    • W. Zhang, S. Zhang, M. Cai and J. Wu, "An agent-based Peerto-Peer Architecture for Semantic Discovery of Manufacturing Services across Virtual Enterprises," Enterprise Information Systems, 2012, iFirst article, http://dx. doi. org/10. 1080/17517575. 2012. 747002
    • (2012) Enterprise Information Systems
    • Zhang, W.1    Zhang, S.2    Cai, M.3    Wu, J.4
  • 30
    • 33746832822 scopus 로고    scopus 로고
    • Application of mobile agents in interoperable step-nc compliant manufacturing
    • 15 September-1 October
    • A. Nassehi, R. D. Allen and S. T. Newman, "Application of Mobile Agents in Interoperable STEP-NC Compliant Manufacturing," International Journal of Production Research, Vol. 44, Nos. 18-19, 15 September-1 October 2006, 4159-4174
    • (2006) International Journal of Production Research , vol.44 , Issue.18-19 , pp. 4159-4174
    • Nassehi, A.1    Allen, R.D.2    Newman, S.T.3
  • 31
    • 33746103274 scopus 로고    scopus 로고
    • An agent-based Web service Workflow Model for inter-enterprise collaboration
    • S. Wang, W. Shen, and Q. Hao, "An agent-based Web service Workflow Model for inter-enterprise collaboration," Expert Systems with Applications 31 (2006) 787-799
    • (2006) Expert Systems with Applications , vol.31 , pp. 787-799
    • Wang, S.1    Shen, W.2    Hao, Q.3
  • 33
    • 71549136791 scopus 로고    scopus 로고
    • A framework to develop an analysis agent for evaluating human performance in manufacturing systems
    • M. Shahrokhi, and A. Bernard, "A Framework to Develop an Analysis Agent for Evaluating Human Performance in Manufacturing Systems," CIRP Journal of Manufacturing Science and Technology 2 (2009) 55-60
    • (2009) CIRP Journal of Manufacturing Science and Technology , vol.2 , pp. 55-60
    • Shahrokhi, M.1    Bernard, A.2
  • 34
    • 60249089721 scopus 로고    scopus 로고
    • Development of an agent-based system for manufacturing control and coordination with ontology and RFID technology
    • R. Chen, and M. Tu, "Development of an Agent-based System for Manufacturing Control and Coordination with Ontology and RFID Technology," Expert Systems with Applications 36 (2009) 7581-7593
    • (2009) Expert Systems with Applications , vol.36 , pp. 7581-7593
    • Chen, R.1    Tu, M.2
  • 35
    • 70349448089 scopus 로고    scopus 로고
    • An agent-based workflow system for enterprise based on FIPA-os framework
    • Y. J. Yang, T. Sung, C. Wu and H. Chen, "An Agent-based Workflow System for Enterprise Based on FIPA-OS Framework," Expert Systems with Applications 37 (2010) 393- 400
    • (2010) Expert Systems with Applications , vol.37 , pp. 393-400
    • Yang, Y.J.1    Sung, T.2    Wu, C.3    Chen, H.4
  • 36
    • 33744981616 scopus 로고    scopus 로고
    • A multi-agent virtual enterprise model and its simulation with swarm
    • 1 May
    • H. LI and R. Xiao, "A Multi-agent Virtual Enterprise Model and its Simulation with Swarm" International Journal of Production Research, vol. 44, No. 9, 1 May 2006, 1719-1737
    • (2006) International Journal of Production Research , vol.44 , Issue.9 , pp. 1719-1737
    • Li, H.1    Xiao, R.2
  • 37
    • 44949191970 scopus 로고    scopus 로고
    • Decision strategies and design of agent interactions in hierarchical manufacturing systems
    • C. Wernz and A. Deshmukh, "Decision strategies and design of agent interactions in hierarchical manufacturing systems" Journal of Manufacturing Systems 26 (2007) 135-143
    • (2007) Journal of Manufacturing Systems , vol.26 , pp. 135-143
    • Wernz, C.1    Deshmukh, A.2
  • 38
    • 0038449844 scopus 로고    scopus 로고
    • A multi-agent based manufacturing control strategy for responsive manufacturing
    • M. K. Lim and Z. Zhang, "A multi-agent based manufacturing control strategy for responsive manufacturing," Journal of Materials Processing Technology 139 (2003) 379-384
    • (2003) Journal of Materials Processing Technology , vol.139 , pp. 379-384
    • Lim, M.K.1    Zhang, Z.2
  • 39
    • 0043011156 scopus 로고    scopus 로고
    • Intelligent policy recommendations on enterprise resource planning by the use of agent technology and data mining techniques
    • L. Andreas, D. K. Symeonidis, and P. A. Mitkas; "Intelligent Policy Recommendations on Enterprise Resource Planning by the Use of Agent Technology and Data Mining Techniques," Expert Systems with Applications 25 (2003) 589-602
    • (2003) Expert Systems with Applications , vol.25 , pp. 589-602
    • Andreas, L.1    Symeonidis, D.K.2    Mitkas, P.A.3
  • 40
    • 84884501671 scopus 로고    scopus 로고
    • Agent-supported Collaboration and Interoperability for Networked Enterprises: Modeling Interactions and Service Compositions
    • I. Zinnikus, X. Cao and K. Fischer; "Agent-supported Collaboration and Interoperability for Networked Enterprises: Modeling Interactions and Service Compositions," Computers in Industry 64 (2013) 938-950
    • (2013) Computers in Industry , vol.64 , pp. 938-950
    • Zinnikus, I.1    Cao, X.2    Fischer, K.3
  • 41
    • 1542605225 scopus 로고    scopus 로고
    • Internet scheduling environment with market driven agents
    • B. P C. Yen, and O. Q. Wu, "Internet Scheduling Environment with Market Driven Agents," IEEE TSMC-A 34 (2) (2003) 281-289
    • (2003) IEEE TSMC-A , vol.34 , Issue.2 , pp. 281-289
    • Yen, B.P.C.1    Wu, O.Q.2
  • 42
    • 1642337074 scopus 로고    scopus 로고
    • An introduction to a methodological approach for the simulation of distributed industrial systems
    • S. Galland, F. Grimaud, P. Beaune and J. P. Campagne, "An Introduction to a Methodological Approach for the Simulation of Distributed Industrial Systems," IJPE 85 (1) (2003) 11-31
    • (2003) IJPE , vol.85 , Issue.1 , pp. 11-31
    • Galland, S.1    Grimaud, F.2    Beaune, P.3    Campagne, J.P.4
  • 43
    • 0141569720 scopus 로고    scopus 로고
    • A multi-agent-based emaintenance system with case-based reasoning decision support
    • R. Yu, B. Iung, H. Panetto, "A Multi-agent-Based Emaintenance System with Case-based Reasoning Decision Support," EAAI 16 (2003) 321-333
    • (2003) EAAI , vol.16 , pp. 321-333
    • Yu, R.1    Iung, B.2    Panetto, H.3
  • 44
    • 84902469231 scopus 로고    scopus 로고
    • Towards an internet enabled cooperative manufacturing management framework
    • Lugano, Switzerland
    • Q. Hao, W. Shen, G. Stecca, L. Wang, "Towards an Internet Enabled Cooperative Manufacturing Management Framework," in: Proc. of PRO-VE'03, Lugano, Switzerland, 2003, pp. 191- 200
    • (2003) Proc. of PRO-VE'03 , pp. 191-200
    • Hao, Q.1    Shen, W.2    Stecca, G.3    Wang, L.4
  • 45
    • 1642634491 scopus 로고    scopus 로고
    • An adaptive and upgradable agent-based system for coordinated product development and manufacture
    • H. Z. Jia, S. K. Ong, J. Y. H. Fuh, Y. F. Zhang and A. Y. C. Nee, "An Adaptive and Upgradable Agent-based System for Coordinated Product Development and Manufacture," RCIM 20 (2004) 79-90
    • (2004) RCIM , vol.20 , pp. 79-90
    • Jia, H.Z.1    Ong, S.K.2    Fuh, J.Y.H.3    Zhang, Y.F.4    Nee, A.Y.C.5
  • 46
    • 0242375709 scopus 로고    scopus 로고
    • A hybrid scheduling and control system architecture for warehouse management
    • B. I. Kim, S. S. Heragu, R. J. Graves and A. St. Onge, "A Hybrid Scheduling and Control System Architecture for Warehouse Management," IEEE TR&A 19 (6) (2003) 991-1001
    • (2003) IEEE TR&A , vol.19 , Issue.6 , pp. 991-1001
    • Kim, B.I.1    Heragu, S.S.2    Graves, R.J.3    St. Onge, A.4
  • 47
    • 1242332734 scopus 로고    scopus 로고
    • Case-based modification for optimization agents: Agent-opt
    • Y. S. Chan and J. K. Lee, "Case-based Modification for Optimization Agents: AGENT-OPT," DSS 36 (4) (2004) 355- 370
    • (2004) DSS , vol.36 , Issue.4 , pp. 355-370
    • Chan, Y.S.1    Lee, J.K.2
  • 49
    • 0141458073 scopus 로고    scopus 로고
    • Agent-based optimisation of logistics and production planning
    • A. Karageorgos, N. Mehandjiev, G. Weichhart and A. Hammerle, "Agent-based Optimisation of Logistics and Production Planning," EAAI 16 (4) (2003) 335-348
    • (2003) EAAI , vol.16 , Issue.4 , pp. 335-348
    • Karageorgos, A.1    Mehandjiev, N.2    Weichhart, G.3    Hammerle, A.4
  • 50
    • 0346639128 scopus 로고    scopus 로고
    • Asking the right question: Risk and expectation in multi-agent contracting
    • A. Babanov, J. Collins and M. Gini, "Asking the Right Question: Risk and Expectation in Multi-agent Contracting," AIEDAM 17 (3) (2003) 173-186
    • (2003) AIEDAM , vol.17 , Issue.3 , pp. 173-186
    • Babanov, A.1    Collins, J.2    Gini, M.3
  • 52
    • 0442278530 scopus 로고    scopus 로고
    • Design and evaluations of a co-learning multiagent system to collaborative supply chain management
    • Washington DC, USA
    • H. D. Zhou, "Design and Evaluations of a Co-learning Multiagent System to Collaborative Supply Chain Management," in: Proc. of the 34 Annual Meeting of the Decision Sciences Institute, Washington DC, USA, 2003, pp. 163-174
    • (2003) Proc. of the 34 Annual Meeting of the Decision Sciences Institute , pp. 163-174
    • Zhou, H.D.1
  • 53
    • 0242576357 scopus 로고    scopus 로고
    • Agent-based collaborative project management system for distributed manufacturing
    • Washington DC, USA
    • S. Wu, D. B. Kotak, "Agent-based Collaborative Project Management System for Distributed Manufacturing," in: Proc. of IEEE SMC 2003, vol. 2, Washington DC, USA, 2003, pp. 1233-1238
    • (2003) Proc. of IEEE SMC 2003 , vol.2 , pp. 1233-1238
    • Wu, S.1    Kotak, D.B.2
  • 55
    • 1642559464 scopus 로고    scopus 로고
    • Combining agent-based supply net simulation and constraint technology for highly efficient simulation of supply networks using aps systems
    • New Orleans, LA
    • H. Baumgaertel and U. John, Combining agent-based Supply Net Simulation and Constraint Technology for Highly Efficient Simulation of Supply Networks Using APS Systems," in: Proc. of the 2003 Winter Simulation Conference, New Orleans, LA, 2003, pp. 1765-1773
    • (2003) Proc. of the 2003 Winter Simulation Conference , pp. 1765-1773
    • Baumgaertel, H.1    John, U.2
  • 56
    • 1142280332 scopus 로고    scopus 로고
    • Multi-agent-based negotiation support system for order based manufacturers
    • Pittsburgh, PA
    • H. R. Choi, H. S. Kim and Y. J. Park, "Multi-agent-based Negotiation Support System for Order Based Manufacturers," in: Proc. of ICEC2003, vol. 5, Pittsburgh, PA, 2003, pp. 480- 488
    • (2003) Proc. of ICEC2003 , vol.5 , pp. 480-488
    • Choi, H.R.1    Kim, H.S.2    Park, Y.J.3
  • 57
    • 1242287854 scopus 로고    scopus 로고
    • An agent for selecting optimal order set in EC market place
    • H. R. Choi, H. S. Kim, B. J. Park, Y. J. Park and A. B. Whinston, "An agent for Selecting Optimal Order Set in EC Market Place," DSS 36 (4) (2004) 371-383
    • (2004) DSS , vol.36 , Issue.4 , pp. 371-383
    • Choi, H.R.1    Kim, H.S.2    Park, B.J.3    Park, Y.J.4    Whinston, A.B.5
  • 58
    • 1442334888 scopus 로고    scopus 로고
    • A document-driven agent-based approach for business process management
    • J. Y. Kuo, "A Document-driven Agent-based Approach for Business Process Management," Information and Software Technology 46 (2003) 373-382
    • (2003) Information and Software Technology , vol.46 , pp. 373-382
    • Kuo, J.Y.1
  • 59
    • 0142093040 scopus 로고    scopus 로고
    • Coordination policies to support decision making in distributed production planning
    • G. Lo Nigro, S. Noto La Diega, G. Perrone and P. Renna, "Coordination Policies to Support Decision Making in Distributed Production Planning," RCIM 19 (6) (2003) 521- 531
    • (2003) RCIM , vol.19 , Issue.6 , pp. 521-531
    • Lo Nigro, G.1    Noto La Diega, S.2    Perrone, G.3    Renna, P.4
  • 60
    • 2942556785 scopus 로고    scopus 로고
    • Research on CAPP/ scheduling integration multi-agent system model and implementation
    • Y. Wang, T. Xiao, G. Duan and X. Wang, "Research on CAPP/ Scheduling Integration Multi-agent System Model and Implementation," CJME 16 (4) (2003) 348-351
    • (2003) CJME , vol.16 , Issue.4 , pp. 348-351
    • Wang, Y.1    Xiao, T.2    Duan, G.3    Wang, X.4
  • 61
    • 0042364765 scopus 로고    scopus 로고
    • Interoperating standards in multi-agent agile manufacturing scheduling systems
    • R. J. Rabelo, "Interoperating Standards in Multi-agent Agile Manufacturing Scheduling Systems," IJCAT 18 (1-4) (2003) 146-159
    • (2003) IJCAT , vol.18 , Issue.1-4 , pp. 146-159
    • Rabelo, R.J.1
  • 62
    • 1342287338 scopus 로고    scopus 로고
    • Solving the n-job 3-stage flexible flow-shop scheduling problem using an agent-based approach
    • A. Babayan and D. He, "Solving the n-job 3-stage Flexible Flow-shop Scheduling Problem using an Agent-based Approach," International Journal of Production Research 42 (4) (2004) 777-799
    • (2004) International Journal of Production Research , vol.42 , Issue.4 , pp. 777-799
    • Babayan, A.1    He, D.2
  • 63
    • 1242265406 scopus 로고    scopus 로고
    • Opportunistic coordination of operations in job shop production
    • H. Corsten and R. Gosinger, "Opportunistic Coordination of Operations in Job Shop Production," Technovation 24 (2004) 219-234
    • (2004) Technovation , vol.24 , pp. 219-234
    • Corsten, H.1    Gosinger, R.2
  • 64
    • 2442695353 scopus 로고    scopus 로고
    • Dynamic scheduling of steel casting and milling using multi-agents
    • P. I. Cowling, D. Ouelhadj and S. Petrovic, "Dynamic Scheduling of Steel Casting and Milling Using Multi-agents," PPC 15 (2) (2004) 178-188
    • (2004) PPC , vol.15 , Issue.2 , pp. 178-188
    • Cowling, P.I.1    Ouelhadj, D.2    Petrovic, S.3
  • 65
    • 1142292504 scopus 로고    scopus 로고
    • Task allocation using a market-based planning mechanism
    • Melbourne, Australia
    • D. Goldberg, V. Cicirello and M. B. Dias, "Task Allocation using a Market-based Planning Mechanism," in: Proc. of AAMAS'03, vol. 2, Melbourne, Australia, 2003, pp. 996-997
    • (2003) Proc. of AAMAS'03 , vol.2 , pp. 996-997
    • Goldberg, D.1    Cicirello, V.2    Dias, M.B.3
  • 66
    • 1542475379 scopus 로고    scopus 로고
    • Manufacturing planner agents in network enterprises
    • L. Imberti, T. Tolio, Manufacturing Planner Agents in Network Enterprises," IJATM 3 (3/4) (2003) 315-327
    • (2003) IJATM , vol.3 , Issue.3-4 , pp. 315-327
    • Imberti, L.1    Tolio, T.2
  • 68
    • 0141885117 scopus 로고    scopus 로고
    • Multi-agent-based dynamic resource scheduling for distributed multiple projects using a market mechanism
    • Y. H. Lee, S. R. T. Kumara, K. Chatterjee, "Multi-agent-based Dynamic Resource Scheduling for Distributed Multiple Projects Using a Market Mechanism," Journal of Intelligent Manufacturing 14 (5) (2003) 471-484
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.5 , pp. 471-484
    • Lee, Y.H.1    Kumara, S.R.T.2    Chatterjee, K.3
  • 69
    • 2042478705 scopus 로고    scopus 로고
    • An integrated agent-based approach for responsive control of manufacturing resources
    • M. K. Lim, D. Z. Zhang, "An Integrated Agent-based Approach for Responsive Control of Manufacturing Resources," Computers and Industrial Engineering 46 (2) (2004) 221-232
    • (2004) Computers and Industrial Engineering , vol.46 , Issue.2 , pp. 221-232
    • Lim, M.K.1    Zhang, D.Z.2
  • 70
    • 0141885118 scopus 로고    scopus 로고
    • Negotiation-based routing in job shops via collaborative agents
    • J. M. Usher, "Negotiation-based Routing in job shops via Collaborative Agents," Journal of Intelligent Manufacturing 14 (5) (2003) 485-499
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.5 , pp. 485-499
    • Usher, J.M.1
  • 71
    • 0242408752 scopus 로고    scopus 로고
    • A multi-agent approach for the job shop scheduling problem with earliness and tardiness
    • Washington DC, USA
    • L. B. Valencia and G. Rabadi, "A Multi-agent Approach for the Job Shop Scheduling Problem with Earliness and Tardiness," in: Proc. of 2003 IEEE SMC 2003, Washington DC, USA, vol. 2, 2003, pp. 1217-1222
    • (2003) Proc. of 2003 IEEE SMC 2003 , vol.2 , pp. 1217-1222
    • Valencia, L.B.1    Rabadi, G.2
  • 72
    • 0242576359 scopus 로고    scopus 로고
    • An adaptive negotiation framework for agent-based dynamic manufacturing scheduling
    • Washington DC, USA
    • C. Wang, W. Shen, H. Ghenniwa, "An Adaptive Negotiation Framework for Agent-based Dynamic Manufacturing Scheduling," in: Proc. of 2003 IEEE SMC 2003, vol. 2, Washington DC, USA, 2003, pp. 1211-1216
    • (2003) Proc. of 2003 IEEE SMC 2003 , vol.2 , pp. 1211-1216
    • Wang, C.1    Shen, W.2    Ghenniwa, H.3
  • 73
    • 0142247355 scopus 로고    scopus 로고
    • A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems
    • Y. H. Wang, C. W. Yin and Y. Zhang, "A Multi-agent and Distributed Ruler Based Approach to Production Scheduling of Agile Manufacturing Systems, IJCIM 16 (2) (2003) 81-92
    • (2003) IJCIM , vol.16 , Issue.2 , pp. 81-92
    • Wang, Y.H.1    Yin, C.W.2    Zhang, Y.3
  • 74
    • 0442311730 scopus 로고    scopus 로고
    • Multi-agent technology in scheduling of semiconductor production line
    • J. Wu, Y. Xiao, "Multi-agent Technology in Scheduling of Semiconductor Production Line," Chinese Journal of CIMS 9 (8) (2003) 641-644
    • (2003) Chinese Journal of CIMS , vol.9 , Issue.8 , pp. 641-644
    • Wu, J.1    Xiao, Y.2
  • 75
    • 1642371658 scopus 로고    scopus 로고
    • Mobile multi-agent-based scheduling and coordination of maintenance network
    • Las Vegas, NV
    • F. Zhang, E. Santos Jr., P. B. Luh, "Mobile Multi-agent-based Scheduling and Coordination of Maintenance Network," in: Proc. of PDPTA'2003, Las Vegas, NV, 2003, pp. 279-285
    • (2003) Proc. of PDPTA'2003 , pp. 279-285
    • Zhang, F.1    Santos, E.2    Luh, P.B.3
  • 76
    • 84931029782 scopus 로고    scopus 로고
    • An agent-based system for production control of semiconductor manufacturing processes
    • Prague, Czech Republic
    • L. Monch, M. Stehli, and J. Zimmerman, "An Agent-based System for Production Control of Semiconductor Manufacturing Processes," in: Proc. of HoloMAS 2003, Prague, Czech Republic, 2003
    • (2003) Proc. of HoloMAS 2003
    • Monch, L.1    Stehli, M.2    Zimmerman, J.3
  • 77
    • 33750456357 scopus 로고    scopus 로고
    • Flexibility through multi-agent systems: Solution or illusion?
    • P. Van Emde Boas, J. Pokorny, M. Bielikova, J. Stuller (Eds. ), LNCS, 2932, Springer-Verlag
    • P. C. Lockemann, J. Nimis, Flexibility through Multi-agent Systems: Solution or Illusion?," in: P. Van Emde Boas, J. Pokorny, M. Bielikova, J. Stuller (Eds. ), Theory and Practice of Computer Science, LNCS, 2932, Springer-Verlag, 2003, pp. 41- 56
    • (2003) Theory and Practice of Computer Science , pp. 41-56
    • Lockemann, P.C.1    Nimis, J.2
  • 78
    • 0242301593 scopus 로고    scopus 로고
    • Distributed intelligent control of exceptions in reconfigurable manufacturing systems
    • M. Bruccoleri, M. Amico, G. Perrone, "Distributed Intelligent Control of Exceptions in Reconfigurable Manufacturing Systems," International Journal of Production Research 41 (7) (2003) 1393-1412
    • (2003) International Journal of Production Research , vol.41 , Issue.7 , pp. 1393-1412
    • Bruccoleri, M.1    Amico, M.2    Perrone, G.3
  • 79
    • 0242301626 scopus 로고    scopus 로고
    • Sequential resource allocation utilizing agents
    • A. Wallace, "Sequential Resource Allocation Utilizing Agents," International Journal of Production Research 41 (11) (2003) 2481-2499
    • (2003) International Journal of Production Research , vol.41 , Issue.11 , pp. 2481-2499
    • Wallace, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.