메뉴 건너뛰기




Volumn 19, Issue 6, 2003, Pages 991-1001

A hybrid scheduling and control system architecture for warehouse management

Author keywords

Hybrid framework; Intelligent agent; Warehouse management

Indexed keywords

COMPUTER SIMULATION; CONTROL SYSTEM SYNTHESIS; GENETIC ALGORITHMS; MATHEMATICAL MODELS; MATHEMATICAL PROGRAMMING; RESOURCE ALLOCATION; SCHEDULING; WAREHOUSES;

EID: 0242375709     PISSN: 1042296X     EISSN: None     Source Type: Journal    
DOI: 10.1109/TRA.2003.819735     Document Type: Article
Times cited : (56)

References (23)
  • 1
    • 0030399084 scopus 로고    scopus 로고
    • The state of the art in intelligent real-time FMS control: A comprehensive survey
    • C. S. Shukla and F. F. Chen, "The state of the art in intelligent real-time FMS control: a comprehensive survey," J. Intell. Manuf., vol. 7, pp. 441-455, 1996.
    • (1996) J. Intell. Manuf. , vol.7 , pp. 441-455
    • Shukla, C.S.1    Chen, F.F.2
  • 2
    • 0036770512 scopus 로고    scopus 로고
    • Intelligent agent-based framework for manufacturing systems control
    • Sept.
    • S. S. Heragu, R. J. Graves, B. Kim, and A. St. Onge, "Intelligent agent-based framework for manufacturing systems control," IEEE Trans. Syst., Man, Cybern. A, vol. 32, pp. 560-573, Sept. 2002.
    • (2002) IEEE Trans. Syst., Man, Cybern. A , vol.32 , pp. 560-573
    • Heragu, S.S.1    Graves, R.J.2    Kim, B.3    Onge, A.St.4
  • 3
    • 0002646899 scopus 로고
    • Knowledge-based reactive scheduling
    • E. Szelke and R. M. Kerr, "Knowledge-based reactive scheduling," Prod. Planning, Control, vol. 5, no. 2, pp. 124-145, 1994.
    • (1994) Prod. Planning, Control , vol.5 , Issue.2 , pp. 124-145
    • Szelke, E.1    Kerr, R.M.2
  • 4
    • 0032202527 scopus 로고    scopus 로고
    • Reference architecture for holonic manufacturing systems: PROSA
    • H. V. Brussel, J. Wyns, P. Valckernaers, and L. Bongaerts, "Reference architecture for holonic manufacturing systems: PROSA," Comput. Ind., vol. 37, pp. 255-274, 1998.
    • (1998) Comput. Ind. , vol.37 , pp. 255-274
    • Brussel, H.V.1    Wyns, J.2    Valckernaers, P.3    Bongaerts, L.4
  • 5
    • 0032663605 scopus 로고    scopus 로고
    • MetaMorph: An adaptive agent-based architecture for intelligent manufacturing
    • F. Maturana, W. Shen, and D. H. Norrie, "MetaMorph: an adaptive agent-based architecture for intelligent manufacturing," Int. J. Prod. Res., vol. 37, no. 10, pp. 2159-2173, 1999.
    • (1999) Int. J. Prod. Res. , vol.37 , Issue.10 , pp. 2159-2173
    • Maturana, F.1    Shen, W.2    Norrie, D.H.3
  • 6
    • 0034628954 scopus 로고    scopus 로고
    • An adaptive production control system utilizing agent technology
    • T. A. Ottaway and J. R. Burns, "An adaptive production control system utilizing agent technology," Int. J. Prod. Res., vol. 38, no. 4, pp. 721-737, 2000.
    • (2000) Int. J. Prod. Res. , vol.38 , Issue.4 , pp. 721-737
    • Ottaway, T.A.1    Burns, J.R.2
  • 7
    • 0003502925 scopus 로고    scopus 로고
    • EtoPlan: A concept for concurrent manufacturing planning and control - Building holarchies for manufacture-to-order environments
    • Ph.D. dissertation, Univ. of Twente, Twente, The Netherlands
    • M. M. T. Giebels, "EtoPlan: A concept for concurrent manufacturing planning and control - building holarchies for manufacture-to-order environments," Ph.D. dissertation, Univ. of Twente, Twente, The Netherlands, 2000.
    • (2000)
    • Giebels, M.M.T.1
  • 8
    • 0028707551 scopus 로고
    • Hierarchical and dynamic production control in flexible manufacturing systems
    • R. Tawegoum, E. Castelain, and J. C. Gentina, "Hierarchical and dynamic production control in flexible manufacturing systems," Robot. Comput.-Integr. Manuf., vol. 11, no. 4, pp. 327-334, 1994.
    • (1994) Robot. Comput.-Integr. Manuf. , vol.11 , Issue.4 , pp. 327-334
    • Tawegoum, R.1    Castelain, E.2    Gentina, J.C.3
  • 9
    • 0019585243 scopus 로고
    • A review of production scheduling
    • S. C. Graves, "A review of production scheduling," Oper. Res., vol. 29, no. 4, pp. 646-675, 1981.
    • (1981) Oper. Res. , vol.29 , Issue.4 , pp. 646-675
    • Graves, S.C.1
  • 10
    • 0000107307 scopus 로고
    • Characterizing the manufacturing scheduling problem
    • H. V. D. Parunak, "Characterizing the manufacturing scheduling problem," J. Manuf. Syst., vol. 10, no. 3, pp. 241-259, 1991.
    • (1991) J. Manuf. Syst. , vol.10 , Issue.3 , pp. 241-259
    • Parunak, H.V.D.1
  • 12
    • 0026103848 scopus 로고
    • Resource allocation in distributed factory scheduling
    • Jan.
    • K. P. Sycara, S. F. Roth, N. Sadeh, and M. S. Fox, "Resource allocation in distributed factory scheduling," IEEE Expert Mag., vol. 6, pp. 22-40, Jan. 1991.
    • (1991) IEEE Expert Mag. , vol.6 , pp. 22-40
    • Sycara, K.P.1    Roth, S.F.2    Sadeh, N.3    Fox, M.S.4
  • 14
    • 0002753338 scopus 로고
    • OPIS: A methodology and architecture for reactive scheduling
    • M. Zweben and M. S. Fox, Eds. San Mateo, CA: Morgan Kaufmann; ch. 2
    • S. F. Smith, "OPIS: a methodology and architecture for reactive scheduling," in Intelligent Scheduling, M. Zweben and M. S. Fox, Eds. San Mateo, CA: Morgan Kaufmann, 1994, ch. 2, pp. 29-66.
    • (1994) Intelligent Scheduling , pp. 29-66
    • Smith, S.F.1
  • 15
    • 0003679290 scopus 로고    scopus 로고
    • Integration of scheduling and control in holonic manufacturing systems
    • Ph.D. dissertation, Katholieke Univ. Leuven, Leuven, Belgium
    • L. Bongaerts, "Integration of scheduling and control in holonic manufacturing systems," Ph.D. dissertation, Katholieke Univ. Leuven, Leuven, Belgium, 1998.
    • (1998)
    • Bongaerts, L.1
  • 17
    • 0033360676 scopus 로고    scopus 로고
    • A literature survey on planning and control of warehousing systems
    • J. P. Van den Berg, "A literature survey on planning and control of warehousing systems," IIE Trans., vol. 3, pp. 751-762, 1999.
    • (1999) IIE Trans. , vol.31 , pp. 751-762
    • Van Den Berg, J.P.1
  • 18
    • 0036643293 scopus 로고    scopus 로고
    • Intelligent agent modeling of an industrial warehousing problem
    • B. Kim, R. J. Graves, S. S. Heragu, and A. St. Onge, "Intelligent agent modeling of an industrial warehousing problem," IIE Trans., vol. 34, no. 7, pp. 601-612, 2002.
    • (2002) IIE Trans. , vol.34 , Issue.7 , pp. 601-612
    • Kim, B.1    Graves, R.J.2    Heragu, S.S.3    Onge, A.St.4
  • 19
    • 0242269792 scopus 로고    scopus 로고
    • Realization of a short cycle time in warehouse replenishment and order picking
    • B. Kim, S. S. Heragu, R. J. Graves, and A. St. Onge, "Realization of a short cycle time in warehouse replenishment and order picking," Int. J. Prod. Res., vol. 41, no. 2, pp. 349-364, 2003.
    • (2003) Int. J. Prod. Res. , vol.41 , Issue.2 , pp. 349-364
    • Kim, B.1    Heragu, S.S.2    Graves, R.J.3    Onge, A.St.4
  • 20
    • 0003960789 scopus 로고
    • Manufacturing control with a market-driven contract net
    • Ph.D. dissertation, Dept. Elect. Eng., Rensselaer Polytech. Inst., Troy, NY
    • A. D. Baker, "Manufacturing control with a market-driven contract net," Ph.D. dissertation, Dept. Elect. Eng., Rensselaer Polytech. Inst., Troy, NY, 1991.
    • (1991)
    • Baker, A.D.1
  • 21
    • 0003020021 scopus 로고
    • Integrated shop-floor using autonomous agents
    • G. Y. Lin and J. J. Solberg, "Integrated shop-floor using autonomous agents," IIE Trans., vol. 24, no. 3, pp. 57-71, 1992.
    • (1992) IIE Trans. , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.1    Solberg, J.J.2
  • 22
    • 0242265246 scopus 로고    scopus 로고
    • Intelligent agent-based planning, scheduling, and control: Warehouse management application
    • Ph.D. dissertation, Dept. Decision Sci. Eng. Syst., Rensselaer Polytech. Inst., Troy, NY
    • B. Kim, "Intelligent agent-based planning, scheduling, and control: warehouse management application," Ph.D. dissertation, Dept. Decision Sci. Eng. Syst., Rensselaer Polytech. Inst., Troy, NY, 2002.
    • (2002)
    • Kim, B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.