메뉴 건너뛰기




Volumn 41, Issue 7, 2003, Pages 1393-1412

Distributed intelligent control of exceptions in reconfigurable manufacturing systems

Author keywords

[No Author keywords available]

Indexed keywords

RECONFIGURATION PROCESSES;

EID: 0242301593     PISSN: 00207543     EISSN: None     Source Type: Journal    
DOI: 10.1080/1352816031000075170     Document Type: Article
Times cited : (62)

References (27)
  • 1
    • 0034288343 scopus 로고    scopus 로고
    • Autonomous agents architectures and algorithms in flexible manufacturing systems
    • ADACHER, L., AGNETIS, A. and MELONI, C., 2000, Autonomous agents architectures and algorithms in flexible manufacturing systems. IIE Transactions, 32, 941-951.
    • (2000) IIE Transactions , vol.32 , pp. 941-951
    • Adacher, L.1    Agnetis, A.2    Meloni, C.3
  • 3
    • 0242265459 scopus 로고    scopus 로고
    • An intelligent controller for error handling decisions in reconfigurable manufacturing systems
    • September 2001, Bari, Italy
    • AMICO, M., BRUCCOLERI, M., NOTO LA DIEGA, S., PERRONE, G. and RENNA, P., 2001, An intelligent controller for error handling decisions in reconfigurable manufacturing systems. Proceedings of the V Convegno AITEM, September 2001, Bari, Italy, pp. 355-364.
    • (2001) Proceedings of the V Convegno AITEM , pp. 355-364
    • Amico, M.1    Bruccoleri, M.2    Noto La Diega, S.3    Perrone, G.4    Renna, P.5
  • 4
    • 0030142880 scopus 로고    scopus 로고
    • Combining knowledge-based systems and simulation to solve rescheduling problems
    • BELZ, R. and MERTENS, P., 1996, Combining knowledge-based systems and simulation to solve rescheduling problems. Decision Support Systems, 17, 141-157.
    • (1996) Decision Support Systems , vol.17 , pp. 141-157
    • Belz, R.1    Mertens, P.2
  • 5
    • 0034288107 scopus 로고    scopus 로고
    • Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure
    • BRANDIMARTE, P., RIGONDANZA, M. and ROERO, L., 2000, Conceptual modeling of an object-oriented scheduling architecture based on the shifting bottleneck procedure. IIE Transactions, 32, 921-929.
    • (2000) IIE Transactions , vol.32 , pp. 921-929
    • Brandimarte, P.1    Rigondanza, M.2    Roero, L.3
  • 6
    • 0242360146 scopus 로고    scopus 로고
    • Operational issues in reconfigurable manufacturing systems: Exception handling
    • 9-13 June 2002, Orlando, Florida
    • BRUCCOLERI, M. and PASEK, Z., 2002, Operational issues in reconfigurable manufacturing systems: exception handling. Proceedings of the 5th Biannual World Automation Congress, 9-13 June 2002, Orlando, Florida, Vol. 3.
    • (2002) Proceedings of the 5th Biannual World Automation Congress , vol.3
    • Bruccoleri, M.1    Pasek, Z.2
  • 7
    • 0242328720 scopus 로고    scopus 로고
    • A distributed control approach for error handling in reconfigurable manufacturing system based on multi agent system technologies
    • 15-17 July 2002, Hiroshima, Japan, 3
    • BRUCCOLERI, M., AMICO, M., PERRONE, G. and PASEK, Z., 2002, A distributed control approach for error handling in reconfigurable manufacturing system based on multi agent system technologies. Proceedings of JUSFA 2002 Japan-USA Symposium on Flexible Automation, 15-17 July 2002, Hiroshima, Japan, 3, pp. 1067-1074.
    • (2002) Proceedings of JUSFA 2002 Japan-USA Symposium on Flexible Automation , pp. 1067-1074
    • Bruccoleri, M.1    Amico, M.2    Perrone, G.3    Pasek, Z.4
  • 8
    • 0025555793 scopus 로고
    • Reacting to scheduling exceptions in FMS environments
    • DUTTA, A., 1990, Reacting to scheduling exceptions in FMS environments. IIE Transactions, 22, 300-315.
    • (1990) IIE Transactions , vol.22 , pp. 300-315
    • Dutta, A.1
  • 10
    • 0032668814 scopus 로고    scopus 로고
    • Scheduling in job shops with machine breakdowns: An experimental study
    • HOLTHAUS, O., 1999, Scheduling in job shops with machine breakdowns: an experimental study. Computers & Industrial Engineering, 36, 137-162.
    • (1999) Computers & Industrial Engineering , vol.36 , pp. 137-162
    • Holthaus, O.1
  • 15
  • 17
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'DONOVAN, R., UZSOY, R. and MCKAY, K. N., 1999, Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research, 37, 4217-4233.
    • (1999) International Journal of Production Research , vol.37 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 18
    • 0031198746 scopus 로고    scopus 로고
    • Adaptive scheduling in dynamic flexible manufacturing systems: A dynamic rule selection approach
    • PARK, S. C., RAMAN, N. and SHAW, M. J., 1997, Adaptive scheduling in dynamic flexible manufacturing systems: a dynamic rule selection approach. IEEE Transactions on Robotics and Automations, 13, 486-502.
    • (1997) IEEE Transactions on Robotics and Automations , vol.13 , pp. 486-502
    • Park, S.C.1    Raman, N.2    Shaw, M.J.3
  • 20
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • SABUNCUOGLU, I. and BAYIZ, M., 2000, Analysis of reactive scheduling problems in a job shop environment. European Journal of Operational Research, 126, 567-586.
    • (2000) European Journal of Operational Research , vol.126 , pp. 567-586
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 21
    • 0035254377 scopus 로고    scopus 로고
    • Cooperative dispatching - Exploiting the flexibility of an FMS by means of incremental optimization
    • SEIFERT, R. W. and MORITO, S., 2001, Cooperative dispatching - exploiting the flexibility of an FMS by means of incremental optimization. European Journal of Operational Research, 129, 116-133.
    • (2001) European Journal of Operational Research , vol.129 , pp. 116-133
    • Seifert, R.W.1    Morito, S.2
  • 23
    • 0019180974 scopus 로고
    • The contract net protocol: High level communication and control in a distributed problem solver
    • SMITH, R. G., 1980, The contract net protocol: high level communication and control in a distributed problem solver. IEEE Transactions on computers, 12, 1104-1113.
    • (1980) IEEE Transactions on Computers , vol.12 , pp. 1104-1113
    • Smith, R.G.1
  • 24
    • 0031525145 scopus 로고    scopus 로고
    • Rescheduling on a single machine with part-type dependent setup times and deadlines
    • UNAL, A. T., UZSOY, R. and KIRAN, A. S., 1997, Rescheduling on a single machine with part-type dependent setup times and deadlines. Annals of Operations Research, 70, 93-113.
    • (1997) Annals of Operations Research , vol.70 , pp. 93-113
    • Unal, A.T.1    Uzsoy, R.2    Kiran, A.S.3
  • 25
    • 0008646331 scopus 로고
    • Two fuzzier implication operators in the theory of fuzzy power sets
    • WILLMOTT, R., 1980, Two fuzzier implication operators in the theory of fuzzy power sets. Fuzzy Sets and Systems, 4(1), 31-36.
    • (1980) Fuzzy Sets and Systems , vol.4 , Issue.1 , pp. 31-36
    • Willmott, R.1
  • 26
    • 0003089763 scopus 로고
    • Fuzzy reasoning and fuzzy relation equations
    • Wu, W. M., 1986, Fuzzy reasoning and fuzzy relation equations. Fuzzy Sets and Systems, 53(1), 67-78.
    • (1986) Fuzzy Sets and Systems , vol.53 , Issue.1 , pp. 67-78
    • Wu, W.M.1
  • 27
    • 0011675926 scopus 로고
    • Cell control research - Current status and development trends
    • XIANG, D. and O'BRIEN, C., 1995, Cell control research - current status and development trends. International Journal of Production Research, 33, 2325-2352.
    • (1995) International Journal of Production Research , vol.33 , pp. 2325-2352
    • Xiang, D.1    O'Brien, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.