-
1
-
-
0031621768
-
A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: Dispatching, scheduling, and pull
-
Baker, A. D., 1998, A survey of factory control algorithms that can be implemented in a multi-agent heterarchy: dispatching, scheduling, and pull. Journal of Manufacturing Systems. 7(4), 297-320.
-
(1998)
Journal of Manufacturing Systems
, vol.7
, Issue.4
, pp. 297-320
-
-
Baker, A.D.1
-
3
-
-
0003046583
-
A conceptual framework for holonic manufacturing: Identification of manufacturing holons
-
Brussel, H. V., Bongaerts, L., Valckenaers, P. and Ginderachter, T. V., 1999, A conceptual framework for holonic manufacturing: identification of manufacturing holons. Journal of manufacturing systems, 18(1), 35-51.
-
(1999)
Journal of Manufacturing Systems
, vol.18
, Issue.1
, pp. 35-51
-
-
Brussel, H.V.1
Bongaerts, L.2
Valckenaers, P.3
Ginderachter, T.V.4
-
4
-
-
0025421243
-
Synthesis of heterarchical manufacturing systems
-
Duffie, N., 1990, Synthesis of heterarchical manufacturing systems. Computers in Industry, 14, 1167-174.
-
(1990)
Computers in Industry
, vol.14
, pp. 1167-1174
-
-
Duffie, N.1
-
5
-
-
0003011391
-
A promising genetic algorithm approach to job-shop scheduling, rescheduling, and open-shop scheduling problems
-
Morgan Kaufmann
-
Fang, H. L., Ross, P., and Corne, D., 1993, A promising genetic algorithm approach to job-shop scheduling, rescheduling, and open-shop scheduling problems. Proceedings of the 5th International Conference on Genetic Algorithms (Morgan Kaufmann), pp. 379-382.
-
(1993)
Proceedings of the 5Th International Conference on Genetic Algorithms
, pp. 379-382
-
-
Fang, H.L.1
Ross, P.2
Corne, D.3
-
6
-
-
0001943220
-
A pragmatic BDI architecture
-
M. Woolridge, J. P. Muller and M. Tambe
-
Fischer, K., Muller, J. P. and Pischel, M, 1995, A pragmatic BDI architecture. In M. Woolridge, J. P. Muller and M. Tambe (Eds), Intelligent Agents, 11, 203-218.
-
(1995)
Intelligent Agents
, vol.11
, pp. 203-218
-
-
Fischer, K.1
Muller, J.P.2
Pischel, M.3
-
7
-
-
0033617056
-
Agent-based design of holonic manufacturing systems
-
Fischer, K., 1999, Agent-based design of holonic manufacturing systems. Robotics and Automation Systems, 27, 3-13.
-
(1999)
Robotics and Automation Systems
, vol.27
, pp. 3-13
-
-
Fischer, K.1
-
8
-
-
0031069104
-
Using multiagent architecture in FMS for dynamic scheduling
-
Kouiss, K., Pierreval H. and Mebarki, N., 1997, Using multiagent architecture in FMS for dynamic scheduling. Journal of Intelligent Manufacturing, 10(1), 45-47.
-
(1997)
Journal of Intelligent Manufacturing
, vol.10
, Issue.1
, pp. 45-47
-
-
Kouiss, K.1
Pierreval, H.2
Mebarki, N.3
-
9
-
-
0033617063
-
PVS’98 agents: Structures, models and production planning application
-
Marik, V., Pechourek, M., LaRansky, J. and Roche, C., 1999, PVS’98 agents: structures, models and production planning application. Robotics and Autonomous Systems, 27, 29-43.
-
(1999)
Robotics and Autonomous Systems
, vol.27
, pp. 29-43
-
-
Marik, V.1
Pechourek, M.2
Laransky, J.3
Roche, C.4
-
10
-
-
0032628935
-
A cascading auction protocol as a framework for intelligent process planning and heterarchical shop floor control
-
McDonnell, P., Smith, G., Joshi, S., And Kumara, S. R. T., 1999, A cascading auction protocol as a framework for intelligent process planning and heterarchical shop floor control. International Journal of Flexible Manufacturing Systems, 11, 3762.
-
(1999)
International Journal of Flexible Manufacturing Systems
, vol.11
, pp. 3762
-
-
Mc Donnell, P.1
Smith, G.2
Joshi, S.3
Kumara, S.4
-
11
-
-
0001158986
-
Latest developments in CIM
-
Nagalingam, S. V. and Lin, G. C. I., 1999, Latest developments in CIM. Robotics and Computer Integrated Manufacturing, 15, 423-430.
-
(1999)
Robotics and Computer Integrated Manufacturing
, vol.15
, pp. 423-430
-
-
Nagalingam, S.V.1
Lin, G.C.I.2
-
13
-
-
0033617068
-
Multi-agent-based agile scheduling
-
Rabelo, R. J., Camarinha-Matos, L. M. and Afsarmanesh, H., 1999, Multi-agent-based agile scheduling. Robotic and Autonomous Systems, 27, 15-28
-
(1999)
Robotic and Autonomous Systems
, vol.27
, pp. 15-28
-
-
Rabelo, R.J.1
Camarinha-Matos, L.M.2
Afsarmanesh, H.3
-
14
-
-
0034240282
-
Multi-agent and ruler based dynamic scheduling system for agile manufacturing job shop
-
Wang, Y. H., Yin, C. W. and Zhang, Y., 2000, Multi-agent and ruler based dynamic scheduling system for agile manufacturing job shop. CIMS-Computer Integrated Manufacturing System (in Chinese), 6, 45-49.
-
(2000)
Cims-Computer Integrated Manufacturing System (In Chinese)
, vol.6
, pp. 45-49
-
-
Wang, Y.H.1
Yin, C.W.2
Zhang, Y.3
|