-
1
-
-
70349318547
-
Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method
-
Castro-Lacouture, D., Süer, G. A., Gonzalez-Joaqui, J., and, Yates, J. K. (2009). " Construction project scheduling with time, cost, and material restrictions using fuzzy mathematical models and critical path method." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2009)135:10(1096), 396-404. JCEMD4 0733-9364
-
(2009)
J. Constr. Eng. Manage.
, pp. 396-404
-
-
Castro-Lacouture, D.1
Süer, G.A.2
Gonzalez-Joaqui, J.3
Yates, J.K.4
-
2
-
-
1842587322
-
Construction resource scheduling with genetic algorithms
-
Chan, W., Chua, K. H., and, Kannan, G. (1996). " Construction resource scheduling with genetic algorithms." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1996)122:2(125), 125-132. JCEMD4 0733-9364
-
(1996)
J. Constr. Eng. Manage.
, pp. 125-132
-
-
Chan, W.1
Chua, K.H.2
Kannan, G.3
-
3
-
-
58149229057
-
Hybrid time-cost optimization of nonserial repetitive construction projects
-
Ezeldin, A. S., and, Soloman, A. (2009). " Hybrid time-cost optimization of nonserial repetitive construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2009)135:1(42), 42-55. JCEMD4 0733-9364
-
(2009)
J. Constr. Eng. Manage.
, pp. 42-55
-
-
Ezeldin, A.S.1
Soloman, A.2
-
4
-
-
12744251346
-
Distributed scheduling model for infrastructure network
-
Hegazy, T., Elhakeem, A., and, Elbeltagi, E. (2004). " Distributed scheduling model for infrastructure network." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2004)130:2(160), 160-167. JCEMD4 0733-9364
-
(2004)
J. Constr. Eng. Manage.
, pp. 160-167
-
-
Hegazy, T.1
Elhakeem, A.2
Elbeltagi, E.3
-
5
-
-
40849150750
-
Efficient repetitive scheduling for high-rise construction
-
Hagazy, T., and, Kamarah, E. (2008). " Efficient repetitive scheduling for high-rise construction." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2008)134:4(253), 253-264. JCEMD4 0733-9364
-
(2008)
J. Constr. Eng. Manage.
, pp. 253-264
-
-
Hagazy, T.1
Kamarah, E.2
-
6
-
-
6344281398
-
Resource optimization using combined simulation and genetic algorithms
-
Hagazy, T., and, Kassab, M. (2003 a). " Resource optimization using combined simulation and genetic algorithms." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2003)129:6(698), 698-705. JCEMD4 0733-9364
-
(2003)
J. Constr. Eng. Manage.
, pp. 698-705
-
-
Hagazy, T.1
Kassab, M.2
-
7
-
-
13944255840
-
Genetic optimization for dynamic project control
-
Hagazy, T., and, Petzold, K. (2003 b). " Genetic optimization for dynamic project control." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2003)129:4(396), 396-404. JCEMD4 0733-9364
-
(2003)
J. Constr. Eng. Manage.
, pp. 396-404
-
-
Hagazy, T.1
Petzold, K.2
-
8
-
-
67651208854
-
Managing construction projects using the advanced programmatic risk analysis and management model
-
Imbeah, W., and, Guikema, S. (2009). " Managing construction projects using the advanced programmatic risk analysis and management model." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2009)135:8(772), 772-781. JCEMD4 0733-9364
-
(2009)
J. Constr. Eng. Manage.
, pp. 772-781
-
-
Imbeah, W.1
Guikema, S.2
-
9
-
-
84855937977
-
Multiobjective optimization of resource leveling and allocation during construction sheduling
-
Jun, D. H., and, Rayes, K. E. (2011). " Multiobjective optimization of resource leveling and allocation during construction sheduling." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000368, 1080-1088. JCEMD4 0733-9364
-
(2011)
J. Constr. Eng. Manage.
, pp. 1080-1088
-
-
Jun, D.H.1
Rayes, K.E.2
-
10
-
-
0035482195
-
Visualizing simulated construction operations in 3D
-
Kamat, V. R., and, Martinez, J. C. (2001). " Visualizing simulated construction operations in 3D." J. Comput. Civ. Eng., 10.1061/(ASCE)0887-3801(2001)15:4(329), 329-337. JCCEE5 0887-3801
-
(2001)
J. Comput. Civ. Eng.
, pp. 329-337
-
-
Kamat, V.R.1
Martinez, J.C.2
-
11
-
-
78149283314
-
Development of methodology and virtual system for optimized simulation of road design data
-
Kang, L. S., Moon, H. S., Dawood, N., and, Kang, M. S. (2010 b). " Development of methodology and virtual system for optimized simulation of road design data." Autom. Constr., 19 (8), 1000-1015. AUCOES 0926-5805 10.1016/j.autcon.2010.09.001
-
(2010)
Autom. Constr.
, vol.19
, Issue.8
, pp. 1000-1015
-
-
Kang, L.S.1
Moon, H.S.2
Dawood, N.3
Kang, M.S.4
-
12
-
-
80053145153
-
Development of 5D CAD system for visualizing risk degree and progress schedule for construction project
-
Reston, VA
-
Kang, L. S., Moon, H. S., Kim, H. S., Choi, K. R., and, Kim, C. H. (2011). " Development of 5D CAD system for visualizing risk degree and progress schedule for construction project." Proc., 2011 ASCE Int. Workshop on Computing in Civil Engineering, ASCE, Reston, VA.
-
(2011)
Proc. 2011 ASCE Int. Workshop on Computing in Civil Engineering, ASCE
-
-
Kang, L.S.1
Moon, H.S.2
Kim, H.S.3
Choi, K.R.4
Kim, C.H.5
-
13
-
-
78049472053
-
Improved link system between schedule data and 3D object in 4D CAD system by using WBS code
-
Kang, L. S., Moon, H. S., Park, S. Y., Kim, C. H., and, Lee, T. S. (2010 a). " Improved link system between schedule data and 3D object in 4D CAD system by using WBS code." KSCE J. Civ. Eng., 14 (6), 803-814. 1226-7988 10.1007/s12205-010-0960-4
-
(2010)
KSCE J. Civ. Eng.
, vol.14
, Issue.6
, pp. 803-814
-
-
Kang, L.S.1
Moon, H.S.2
Park, S.Y.3
Kim, C.H.4
Lee, T.S.5
-
14
-
-
5244262334
-
Using improved genetic algorithms to facilitate time-cost optimization
-
Li, H., and, Love, P. (1997). " Using improved genetic algorithms to facilitate time-cost optimization." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(1997)123:3(233), 233-237. JCEMD4 0733-9364
-
(1997)
J. Constr. Eng. Manage.
, pp. 233-237
-
-
Li, H.1
Love, P.2
-
15
-
-
0029711941
-
Interactive 4D-CAD
-
J. Vanegas and P. Chinowsky, eds. ASCE, Reston, VA
-
McKinney, K., Kim, J., Fischer, M., and, Howard, C. (1996). " Interactive 4D-CAD." Proc., 3rd Congress on Computing in Civil Engineering, J. Vanegas and P. Chinowsky., eds., ASCE, Reston, VA, 383-389.
-
(1996)
Proc. 3rd Congress on Computing in Civil Engineering
, pp. 383-389
-
-
McKinney, K.1
Kim, J.2
Fischer, M.3
Howard, C.4
-
16
-
-
13944275955
-
Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model
-
Nasir, D., Mccabe, B., and, Hartono, L. (2003). " Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2003)129:5(518), 518-527. JCEMD4 0733-9364
-
(2003)
J. Constr. Eng. Manage.
, pp. 518-527
-
-
Nasir, D.1
McCabe, B.2
Hartono, L.3
-
17
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
Senouci, A. B., and, Eldin, N. N. (2004). " Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage., 10.1061/(ASCE)0733-9364(2004)130:6(869), 869-877. JCEMD4 0733-9364
-
(2004)
J. Constr. Eng. Manage.
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
18
-
-
84859590251
-
Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India
-
Subramanyan, H., Sawant, P. H., and, Bhatt, V. (2012). " Construction project risk assessment: Development of model based on investigation of opinion of construction project experts from India." J. Constr. Eng. Manage., 10.1061/(ASCE)CO.1943-7862.0000435, 409-421. JCEMD4 0733-9364
-
(2012)
J. Constr. Eng. Manage.
, pp. 409-421
-
-
Subramanyan, H.1
Sawant, P.H.2
Bhatt, V.3
-
19
-
-
68049123109
-
A study of ontology-based risk management framework of construction projects through project life cycle
-
Tserng, H. P., Yin, S. Y. L., Dzeng, R. J., Wou, B., Tsai, M. D., and, Chen, W. Y. (2009). " A study of ontology-based risk management framework of construction projects through project life cycle." Autom. Constr., 18 (7), 994-1008. AUCOES 0926-5805 10.1016/j.autcon.2009.05.005
-
(2009)
Autom. Constr.
, vol.18
, Issue.7
, pp. 994-1008
-
-
Tserng, H.P.1
Yin, S.Y.L.2
Dzeng, R.J.3
Wou, B.4
Tsai, M.D.5
Chen, W.Y.6
-
20
-
-
3142565144
-
4D dynamic management for construction planning and resource utilization
-
Wang, H. J., Zhang, J. P., Chau, K. W., and, Anson, M. (2004). " 4D dynamic management for construction planning and resource utilization." Autom. Constr., 13 (5), 575-589. AUCOES 0926-5805 10.1016/j.autcon.2004.04.003
-
(2004)
Autom. Constr.
, vol.13
, Issue.5
, pp. 575-589
-
-
Wang, H.J.1
Zhang, J.P.2
Chau, K.W.3
Anson, M.4
-
21
-
-
84870712321
-
Ant colony optimization for multimode resource-constrained project scheduling
-
Zhang, H. (2012). " Ant colony optimization for multimode resource-constrained project scheduling." J. Manage. Eng., 10.1061/(ASCE)ME.1943-5479.0000089, 150-159. JMENEA 0742-597X
-
(2012)
J. Manage. Eng.
, pp. 150-159
-
-
Zhang, H.1
|