-
1
-
-
0031079503
-
Risk analysis and management in construction
-
10.1016/S0263-7863(96)00035-X
-
Akintoye, A. S., and MacLeod, M. J. (1997). " Risk analysis and management in construction.." Int. J. Proj. Manage., 15 (1), 31-38. 10.1016/S0263-7863(96)00035-X
-
(1997)
Int. J. Proj. Manage.
, vol.15
, Issue.1
, pp. 31-38
-
-
Akintoye, A.S.1
Macleod, M.J.2
-
2
-
-
0041837967
-
A state-of-art review of FMEA/FMECA
-
10.1142/S0218539394000362
-
Bouti, A., and Kadi, D. A. (1994). " A state-of-art review of FMEA/FMECA.." Int. J. Reliab., Qual., Safety, 1 (4), 515-543. 10.1142/S0218539394000362
-
(1994)
Int. J. Reliab., Qual., Safety
, vol.1
, Issue.4
, pp. 515-543
-
-
Bouti, A.1
Kadi, D.A.2
-
3
-
-
23744452042
-
Key performance indicators for measuring construction success
-
10.1108/14635770410532624
-
Chan, A. P. C., and Chan, A. P. L. (2004). " Key performance indicators for measuring construction success.." Benchmarking: Int. J., 11 (2), 203-221. 10.1108/14635770410532624
-
(2004)
Benchmarking: Int. J.
, vol.11
, Issue.2
, pp. 203-221
-
-
Chan, A.P.C.1
Chan, A.P.L.2
-
4
-
-
0344894852
-
Estimating project and activity duration: A risk management approach using network analysis
-
10.1080/014461998372574
-
Dawood, N. (1998). " Estimating project and activity duration: A risk management approach using network analysis.." Constr. Manage. Econom., 16 (1), 41-48. 10.1080/014461998372574
-
(1998)
Constr. Manage. Econom.
, vol.16
, Issue.1
, pp. 41-48
-
-
Dawood, N.1
-
5
-
-
4344690439
-
APRAM: An advanced programmatic risk analysis method
-
10.1504/IJTPM.2001.001744
-
Dillon, R. L., and Pat́-Cornell, M. E. (2001). " APRAM: An advanced programmatic risk analysis method.." Int. J. Technol., Policy, Manage., 1 (1), 47-55. 10.1504/IJTPM.2001.001744
-
(2001)
Int. J. Technol., Policy, Manage.
, vol.1
, Issue.1
, pp. 47-55
-
-
Dillon, R.L.1
Pat́-Cornell, M.E.2
-
6
-
-
1542605207
-
Programmatic risk analysis for critical engineering systems under tight resource constraints
-
10.1287/opre.51.3.354.14961
-
Dillon, R. L., Pat́-Cornell, M. E., and Guikema, S. D. (2003). " Programmatic risk analysis for critical engineering systems under tight resource constraints.." Oper. Res., 51 (3), 354-370. 10.1287/opre.51.3.354. 14961
-
(2003)
Oper. Res.
, vol.51
, Issue.3
, pp. 354-370
-
-
Dillon, R.L.1
Pat́-Cornell, M.E.2
Guikema, S.D.3
-
7
-
-
18744409397
-
Utility-function model for engineering performance assessment
-
10.1061/(ASCE)0733-9364(2005)131:5(558)
-
Georgy, M. E., Chang, L. M., and Zhang, L. (2005). " Utility-function model for engineering performance assessment.." J. Constr. Eng. Manage., 131 (5), 558-568. 10.1061/(ASCE)0733-9364(2005)131:5(558)
-
(2005)
J. Constr. Eng. Manage.
, vol.131
, Issue.5
, pp. 558-568
-
-
Georgy, M.E.1
Chang, L.M.2
Zhang, L.3
-
8
-
-
0036891554
-
Component choice for managing risk in engineered systems with generalized risk/cost functions
-
10.1016/S0951-8320(02)00155-2
-
Guikema, S. D., and Pat́-Cornell, M. E. (2002). " Component choice for managing risk in engineered systems with generalized risk/cost functions.." Reliab. Eng. Syst. Saf., 78, 227-238. 10.1016/S0951-8320(02) 00155-2
-
(2002)
Reliab. Eng. Syst. Saf.
, vol.78
, pp. 227-238
-
-
Guikema, S.D.1
Pat́-Cornell, M.E.2
-
10
-
-
0003921398
-
-
Carnegie Mellon Univ., Pittsburgh
-
Hendrickson, C., and Au, T. (2000). Project management for construction, 2nd Ed., Carnegie Mellon Univ., Pittsburgh, 33-60.
-
(2000)
Project management for construction 2nd Ed.
, pp. 33-60
-
-
Hendrickson, C.1
Au, T.2
-
11
-
-
0003457608
-
-
Wiley, Hoboken, N.J.
-
Kerzner, H. (2003). Project management: A systems approach to planning, scheduling and controlling, 8th Ed., Wiley, Hoboken, N.J., 449-458.
-
(2003)
Project Management: A Systems Approach to Planning, Scheduling and Controlling 8th Ed.
, pp. 449-458
-
-
Kerzner, H.1
-
12
-
-
0003267827
-
Is construction project planning really doing its job? A critical examination of focus, role and process
-
Laufer, A., and Tucker, R. L. (1987). " Is construction project planning really doing its job? A critical examination of focus, role and process.." Constr. Manage. Econom., 5 (3), 243-266.
-
(1987)
Constr. Manage. Econom.
, vol.5
, Issue.3
, pp. 243-266
-
-
Laufer, A.1
Tucker, R.L.2
-
13
-
-
0343826814
-
Using risk analysis to determine construction project contingencies
-
10.1061/(ASCE)0733-9364(2000)126:2(130)
-
Mak, S., and Picken, D. (2000). " Using risk analysis to determine construction project contingencies.." J. Constr. Eng. Manage., 126 (2), 130-136. 10.1061/(ASCE)0733-9364(2000)126:2(130)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.2
, pp. 130-136
-
-
Mak, S.1
Picken, D.2
-
14
-
-
0001501655
-
Application of a technique for research and development program evaluation
-
10.1287/opre.7.5.646
-
Malcolm, D. G., Roseboom, J. H., Clark, C. E., and Fazar, W. (1959). " Application of a technique for research and development program evaluation.." Oper. Res., 7 (5), 646-669. 10.1287/opre.7.5.646
-
(1959)
Oper. Res.
, vol.7
, Issue.5
, pp. 646-669
-
-
Malcolm, D.G.1
Roseboom, J.H.2
Clark, C.E.3
Fazar, W.4
-
15
-
-
0004399146
-
Data-driven analysis of corporate risk using historical cost-control-data
-
10.1061/(ASCE)0733-9364(1998)124:1(42)
-
Minato, T., and Ashley, D. B. (1998). " Data-driven analysis of corporate risk using historical cost-control-data.." J. Constr. Eng. Manage., 124 (1), 42-47. 10.1061/(ASCE)0733-9364(1998)124:1(42)
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 42-47
-
-
Minato, T.1
Ashley, D.B.2
-
16
-
-
0003649910
-
-
Cambridge University Press, New York
-
Morgan, G. M., and Henrion, M. (1990). Uncertainty: A guide to dealing with uncertainty in quantitative risk and policy analysis, Cambridge University Press, New York, 102-168.
-
(1990)
Uncertainty: A Guide to Dealing with Uncertainty in Quantitative Risk and Policy Analysis
, pp. 102-168
-
-
Morgan, G.M.1
Henrion, M.2
-
17
-
-
0032670945
-
Risk assessment in construction schedule
-
10.1061/(ASCE)0733-9364(1999)125:1(8)
-
Mulholland, B., and Christian, J. (1999). " Risk assessment in construction schedule.." J. Constr. Eng. Manage., 125 (1), 8-15. 10.1061/(ASCE)0733-9364(1999)125:1(8)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 8-15
-
-
Mulholland, B.1
Christian, J.2
-
18
-
-
0026106979
-
Project risk assessment using the analytic hierarchy process
-
10.1109/17.65759
-
Mustafa, M. A., and Al-Bahar, J. F. (1991). " Project risk assessment using the analytic hierarchy process.." IEEE Trans. Eng. Manage., 38 (1), 46-50. 10.1109/17.65759
-
(1991)
IEEE Trans. Eng. Manage.
, vol.38
, Issue.1
, pp. 46-50
-
-
Mustafa, M.A.1
Al-Bahar, J.F.2
-
19
-
-
13944275955
-
Evaluating risk in construction-Schedule model (ERIC-S): Construction schedule risk model
-
10.1061/(ASCE)0733-9364(2003)129:5(518)
-
Nasir, D., McGabe, B., and Hartono, L. (2003). " Evaluating risk in construction-Schedule model (ERIC-S): Construction schedule risk model.." J. Constr. Eng. Manage., 129 (5), 518-527. 10.1061/(ASCE)0733-9364(2003)129: 5(518)
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.5
, pp. 518-527
-
-
Nasir, D.1
Mcgabe, B.2
Hartono, L.3
-
20
-
-
20544431718
-
Judgmental risk analysis process development in construction projects
-
10.1016/j.buildenv.2004.10.013
-
Özta, A., and Ökmen, Ö (2005). " Judgmental risk analysis process development in construction projects.." Build. Environ., 40 (9), 1244-1254. 10.1016/j.buildenv.2004.10.013
-
(2005)
Build. Environ.
, vol.40
, Issue.9
, pp. 1244-1254
-
-
Özta, A.1
Ökmen, Ö.2
-
21
-
-
0021491645
-
Fault trees vs event trees in reliability analysis
-
10.1111/j.1539-6924.1984.tb00941.x
-
Pat́-Cornell, M. E. (1984). " Fault trees vs event trees in reliability analysis.." Risk Anal., 4 (3), 117-185. 10.1111/j.1539-6924. 1984.tb00941.x
-
(1984)
Risk Anal.
, vol.4
, Issue.3
, pp. 117-185
-
-
Pat́-Cornell, M.E.1
-
23
-
-
0016570245
-
Probability encoding in decision analysis
-
10.1287/mnsc.22.3.340
-
Spetzler, C. S., and von Holstein, C. A. S. (1975). " Probability encoding in decision analysis.." Manage. Sci., 22 (3), 340-354. 10.1287/mnsc.22.3.340
-
(1975)
Manage. Sci.
, vol.22
, Issue.3
, pp. 340-354
-
-
Spetzler, C.S.1
Von Holstein, C.A.S.2
-
24
-
-
67651239056
-
The PMBOK Report-PMI body of knowledge standard
-
Wideman, R. M. (1986). " The PMBOK Report-PMI body of knowledge standard.." Proj. Manage. J., 17 (3), 15-24.
-
(1986)
Proj. Manage. J.
, vol.17
, Issue.3
, pp. 15-24
-
-
Wideman, R.M.1
-
25
-
-
0026391033
-
Time and cost risk analysis
-
10.1016/0045-7949(91)90252-H
-
Willmer, G. (1991). " Time and cost risk analysis.." Comput. Struct., 41 (6), 1149-1155. 10.1016/0045-7949(91)90252-H
-
(1991)
Comput. Struct.
, vol.41
, Issue.6
, pp. 1149-1155
-
-
Willmer, G.1
|