Volumn 129, Issue 5, 2003, Pages 518-527

Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction schedule risk model

Author keywords

Construction; Models; Risk analysis; Scheduling

Indexed keywords

EXPERT SYSTEMS; ITERATIVE METHODS; MATHEMATICAL MODELS; MONTE CARLO METHODS; PROBABILITY; PROJECT MANAGEMENT; RISK ASSESSMENT; SCHEDULING; SURVEYS;

EID: 13944275955     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2003)129:5(518)     Document Type: Article
Times cited : (126)

References (79)
  • 1
    • 0032676962 scopus 로고    scopus 로고
    • Physiological demands of concrete slab placing and finishing work
    • Abdelhamid, T. S., and Everett, J. G. (1999a). "Physiological demands of concrete slab placing and finishing work." J. Constr. Eng. Manage., 125(1), 47-52.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 47-52
    • Abdelhamid, T.S.1    Everett, J.G.2
  • 2
    • 0033101230 scopus 로고    scopus 로고
    • Time series analysis for construction productivity experiments
    • Abdelhamid, T. S., and Everett, J. G. (1999b). "Time series analysis for construction productivity experiments." J. Constr. Eng. Manage., 125(2), 87-95.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.2 , pp. 87-95
    • Abdelhamid, T.S.1    Everett, J.G.2
  • 3
    • 0342969753 scopus 로고    scopus 로고
    • Combined discrete-event/ continuous simulation for project planning
    • AbouRizk, S. M., and Wales, R. J. (1997). "Combined discrete-event/ continuous simulation for project planning." J. Constr. Eng. Manage., 123(1), 11-20.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.1 , pp. 11-20
    • AbouRizk, S.M.1    Wales, R.J.2
  • 4
    • 0026880908 scopus 로고
    • Expert system for equipment selection for earth-moving operations
    • Amirkhanian, S. N., and Baker, N. J. (1992). "Expert system for equipment selection for earth-moving operations." J. Constr. Eng. Manage., 118(2), 318-331.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.2 , pp. 318-331
    • Amirkhanian, S.N.1    Baker, N.J.2
  • 5
    • 0031832477 scopus 로고    scopus 로고
    • Performance of concrete placing in Hong Kong buildings
    • Anson, M., and Wang, S. Q. (1998). "Performance of concrete placing in Hong Kong buildings." J. Constr. Eng. Manage., 124(2), 116-124.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.2 , pp. 116-124
    • Anson, M.1    Wang, S.Q.2
  • 6
    • 0011101936 scopus 로고    scopus 로고
    • Factors that affect process quality in the life cycle of building projects
    • Arditi, D., and Gunaydin, H. M. (1998). "Factors that affect process quality in the life cycle of building projects." J. Constr. Eng. Manage., 124(3), 194-203.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.3 , pp. 194-203
    • Arditi, D.1    Gunaydin, H.M.2
  • 7
    • 0022675344 scopus 로고
    • Attributes of materials management systems
    • Bell, L. C., and Stukhart, G. (1986). "Attributes of materials management systems." J. Constr. Eng. Manage., 112(1), 14-21.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.1 , pp. 14-21
    • Bell, L.C.1    Stukhart, G.2
  • 10
    • 0027684268 scopus 로고
    • Project evaluation procedures
    • Bulick, W. J. (1993). "Project evaluation procedures." Cost Eng., 35(10), 27-32.
    • (1993) Cost Eng. , vol.35 , Issue.10 , pp. 27-32
    • Bulick, W.J.1
  • 11
    • 0026837054 scopus 로고
    • Causes of quality deviations in design and construction
    • Burati, J. C., Farrington, J. J., and Ledbetter, W. B. (1992). "Causes of quality deviations in design and construction." J. Constr. Eng. Manage., 118(1), 34-49.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 34-49
    • Burati, J.C.1    Farrington, J.J.2    Ledbetter, W.B.3
  • 12
    • 0032207685 scopus 로고    scopus 로고
    • Multiskilled labor utilization strategies in construction
    • Burleson, R. C., Haas, C. T., Tucker, R. L., and Stanley, A. (1998). "Multiskilled labor utilization strategies in construction." J. Constr. Eng. Manage., 124(6), 480-489.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 480-489
    • Burleson, R.C.1    Haas, C.T.2    Tucker, R.L.3    Stanley, A.4
  • 13
    • 0042557007 scopus 로고
    • Effects of delay times on production rates in construction
    • Christian, J., and Hachey, D. (1995). "Effects of delay times on production rates in construction." J. Constr. Eng. Manage., 121(1), 20-26.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.1 , pp. 20-26
    • Christian, J.1    Hachey, D.2
  • 14
    • 13944253753 scopus 로고
    • Publication 6-1, Cost/Schedule Control Task Force, University of Texas, Austin, Tex.
    • Construction Industry Institute (CII). (1986). "Project control for engineering." Publication 6-1, Cost/Schedule Control Task Force, University of Texas, Austin, Tex., 9
    • (1986) Project Control for Engineering. , pp. 9
  • 15
    • 0006182712 scopus 로고
    • Publication 6-8, Cost/Schedule Control Task Force, University of Texas, Austin, Tex.
    • Construction Industry Institute (CII). (1989). "Management of project risks and uncertainties." Publication 6-8, Cost/Schedule Control Task Force, University of Texas, Austin, Tex., 2-23.
    • (1989) Management of Project Risks and Uncertainties , pp. 2-23
  • 16
    • 2342442938 scopus 로고    scopus 로고
    • The architect/engineer's role in rehabilitation work
    • Daoud, O. E. K. (1997). "The architect/engineer's role in rehabilitation work." J. Constr. Eng. Manage., 123(1), 1-5.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.1 , pp. 1-5
    • Daoud, O.E.K.1
  • 17
    • 0026883408 scopus 로고
    • Superchange: Expert system for analysis of changes claims
    • Diekmann, J. E., and Kim, M. P. (1992). "Superchange: Expert system for analysis of changes claims." J. Constr. Eng. Manage., 118(2), 399-411.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.2 , pp. 399-411
    • Diekmann, J.E.1    Kim, M.P.2
  • 18
    • 13944268856 scopus 로고
    • Design engineering and project control
    • William Ibbs and David B. Ashley, eds., ASCE, New York
    • Diekmann, J. E., Thrush, K. B., and Wilson, T. A. (1987). "Design engineering and project control." Proc., Project Controls: Needs and Solutions, William Ibbs and David B. Ashley, eds., ASCE, New York, 38-46.
    • (1987) Proc., Project Controls: Needs and Solutions , pp. 38-46
    • Diekmann, J.E.1    Thrush, K.B.2    Wilson, T.A.3
  • 21
    • 0033101229 scopus 로고    scopus 로고
    • Overexertion injuries in construction
    • Everett, G. J. (1999). "Overexertion injuries in construction." J. Constr. Eng. Manage., 125(2), 109-114.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.2 , pp. 109-114
    • Everett, G.J.1
  • 22
    • 0032208519 scopus 로고    scopus 로고
    • A better way to estimate and mitigate disruption
    • Finke, M. R. (1998). "A better way to estimate and mitigate disruption." J. Constr. Eng. Manage., 124(6), 490-497.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 490-497
    • Finke, M.R.1
  • 23
    • 0030318089 scopus 로고    scopus 로고
    • Automated constructability analysis of work-zone traffic-control planning
    • Fisher, D. J., and Rajan, N. (1996). "Automated constructability analysis of work-zone traffic-control planning." J. Constr. Eng. Manage., 122(1), 36-43.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 36-43
    • Fisher, D.J.1    Rajan, N.2
  • 26
    • 0023422595 scopus 로고
    • Revisions, repairs, and rework on large projects
    • Friedrich, D. R., Daly, J. P., and Dick, W. G. (1987). "Revisions, repairs, and rework on large projects." J. Constr. Eng. Manage., 113(3), 488-500.
    • (1987) J. Constr. Eng. Manage. , vol.113 , Issue.3 , pp. 488-500
    • Friedrich, D.R.1    Daly, J.P.2    Dick, W.G.3
  • 27
    • 0002494175 scopus 로고
    • Real world applications of Bayesian networks
    • Heckerman, D., and Wellman, M. P. (1995). "Real world applications of Bayesian networks." Commun. ACM, 38(3), 29.
    • (1995) Commun. ACM , vol.38 , Issue.3 , pp. 29
    • Heckerman, D.1    Wellman, M.P.2
  • 29
    • 13944260224 scopus 로고
    • Assessing changes and their real impact
    • William Ibbs and David B. Ashley, eds., ASCE, New York
    • Hester, W. T., and Kuprenas, J. A. (1987). "Assessing changes and their real impact." Proc., Project Controls: Needs and Solutions, William Ibbs and David B. Ashley, eds., ASCE, New York, 58-67.
    • (1987) Proc., Project Controls: Needs and Solutions , pp. 58-67
    • Hester, W.T.1    Kuprenas, J.A.2
  • 30
    • 0042275878 scopus 로고
    • Analysis of fatalities recorded by OSHA
    • Hinze, J., and Russell, D. B. (1995). "Analysis of fatalities recorded by OSHA." J. Constr. Eng. Manage., 121(2), 209-214.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.2 , pp. 209-214
    • Hinze, J.1    Russell, D.B.2
  • 31
    • 0013199180 scopus 로고    scopus 로고
    • Identifying root causes of construction injuries
    • Hinze, J., Pederson, C., and Fredley, J. (1998). "Identifying root causes of construction injuries." J. Constr. Eng. Manage., 124(1), 67-71.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 67-71
    • Hinze, J.1    Pederson, C.2    Fredley, J.3
  • 32
    • 2342431959 scopus 로고    scopus 로고
    • Bidding considerations in developing countries
    • Jaselkis, E. J., and Talukhaba, A. (1998). "Bidding considerations in developing countries." J. Constr. Eng. Manage., 124(3), 185-193.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.3 , pp. 185-193
    • Jaselkis, E.J.1    Talukhaba, A.2
  • 34
    • 0022771761 scopus 로고
    • Design engineers' responsibilities during construction
    • Kagan, H. A., Leary, D. J., and Pratter, G. E. K. (1986). "Design engineers' responsibilities during construction." J. Constr. Eng. Manage., 112(3), 394-402.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.3 , pp. 394-402
    • Kagan, H.A.1    Leary, D.J.2    Pratter, G.E.K.3
  • 35
    • 0029469867 scopus 로고
    • Risk management perceptions and trends of U.S. construction
    • Kangari, R. (1995). "Risk management perceptions and trends of U.S. construction." J. Constr. Eng. Manage., 121(4), 422-429.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 422-429
    • Kangari, R.1
  • 36
    • 0029747295 scopus 로고    scopus 로고
    • Making effective use of construction lessons learned in project life cycle
    • Kartam, N. A. (1996). "Making effective use of construction lessons learned in project life cycle." J. Constr. Eng. Manage., 122(1), 14-21.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 14-21
    • Kartam, N.A.1
  • 38
    • 0029361063 scopus 로고
    • Safety in developing countries: Professional and bureaucratic problems
    • Koehn, E., and Kothari, R. K. (1995). "Safety in developing countries: Professional and bureaucratic problems." J. Constr. Eng. Manage., 121(3), 261-265.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.3 , pp. 261-265
    • Koehn, E.1    Kothari, R.K.2
  • 39
    • 0029746285 scopus 로고    scopus 로고
    • Lessons learned from multiphase reconstruction project
    • Krizek, R. J., Lo, W., and Hadavi, A. (1996). "Lessons learned from multiphase reconstruction project." J. Constr. Eng. Manage., 122(1), 44-54.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 44-54
    • Krizek, R.J.1    Lo, W.2    Hadavi, A.3
  • 40
    • 0025398530 scopus 로고
    • Factors affecting construction-planning outcomes
    • Laufer, A., and Cohenca, D. (1990). "Factors affecting construction-planning outcomes." J. Constr. Eng. Manage., 116(1), 135-156.
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.1 , pp. 135-156
    • Laufer, A.1    Cohenca, D.2
  • 43
    • 0000363297 scopus 로고    scopus 로고
    • Automating communication in civil engineering
    • Luiten, G. T., and Tolman, F. P. (1997). "Automating communication in civil engineering." J. Constr. Eng. Manage., 123(2), 113-120.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 113-120
    • Luiten, G.T.1    Tolman, F.P.2
  • 44
    • 0022681473 scopus 로고
    • Motivational implications of construction work
    • Maloney, W. F., and McFillen, J. M. (1986a). "Motivational implications of construction work." J. Constr. Eng. Manage., 112(1), 137-151.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.1 , pp. 137-151
    • Maloney, W.F.1    McFillen, J.M.2
  • 45
    • 0022679648 scopus 로고
    • Motivation in unionized construction
    • Maloney, W. F., and McFillen, J. M. (1986b). "Motivation in unionized construction." J. Constr. Eng. Manage., 112(1), 122-136.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.1 , pp. 122-136
    • Maloney, W.F.1    McFillen, J.M.2
  • 46
    • 0032050006 scopus 로고    scopus 로고
    • Belief networks for construction performance diagnostics
    • McCabe, B., AbouRizk, S. M., and Goebel, R. (1998). "Belief networks for construction performance diagnostics." J. Comput. Civ. Eng., 12(2), 93-100.
    • (1998) J. Comput. Civ. Eng. , vol.12 , Issue.2 , pp. 93-100
    • McCabe, B.1    AbouRizk, S.M.2    Goebel, R.3
  • 48
    • 0032670945 scopus 로고    scopus 로고
    • Risk assessment in construction schedules
    • Mulholland, B., and Christian, J. (1999). "Risk assessment in construction schedules." J. Constr. Eng. Manage., 125(1), 8-15.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 8-15
    • Mulholland, B.1    Christian, J.2
  • 49
    • 0026882125 scopus 로고
    • Noncontractual methods of integration on construction projects
    • Nam, C. H., and Tatum, C. B. (1992). "Noncontractual methods of integration on construction projects." J. Constr. Eng. Manage., 118(2), 385-398.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.2 , pp. 385-398
    • Nam, C.H.1    Tatum, C.B.2
  • 50
    • 0032052024 scopus 로고    scopus 로고
    • Simulation modeling and management of a large basement construction
    • Ng, W. M., Khor, E. L., Tiong, L. K., and Lee, J. (1998). "Simulation modeling and management of a large basement construction." J. Comput. Civ. Eng., 12(2), 101-110.
    • (1998) J. Comput. Civ. Eng. , vol.12 , Issue.2 , pp. 101-110
    • Ng, W.M.1    Khor, E.L.2    Tiong, L.K.3    Lee, J.4
  • 51
    • 84930124504 scopus 로고
    • Causes of high costs of construction in Nigeria
    • Okpala, D. C., and Aniekwu, A. N. (1988). "Causes of high costs of construction in Nigeria." J. Constr. Eng. Manage., 114(2), 233-244.
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.2 , pp. 233-244
    • Okpala, D.C.1    Aniekwu, A.N.2
  • 54
    • 0002299336 scopus 로고    scopus 로고
    • Space planning methods for multistory building construction
    • Riley, D. R., and Sanvido, V. E. (1997). "Space planning methods for multistory building construction." J. Constr. Eng. Manage., 123(2), 171-180.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 171-180
    • Riley, D.R.1    Sanvido, V.E.2
  • 56
    • 0042640313 scopus 로고    scopus 로고
    • Owner-contractor relationships on contaminated site remediation projects
    • Ruff, C. M., Dzombak, D. A., and Hendrickson, C. T. (1996). "Owner-contractor relationships on contaminated site remediation projects." J. Constr. Eng. Manage., 122(4), 348-353.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.4 , pp. 348-353
    • Ruff, C.M.1    Dzombak, D.A.2    Hendrickson, C.T.3
  • 57
    • 0027608442 scopus 로고
    • Computerized daily site reporting
    • Russell, A. D. (1993). "Computerized daily site reporting." J. Constr. Eng. Manage., 119(2), 385-402.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.2 , pp. 385-402
    • Russell, A.D.1
  • 58
    • 70349143375 scopus 로고
    • Predicting construction contractor failure prior to contract award
    • Russell, J. S., and Jaselskis, E. J. (1992a). "Predicting construction contractor failure prior to contract award." J. Constr. Eng. Manage., 118(4), 791-811.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.4 , pp. 791-811
    • Russell, J.S.1    Jaselskis, E.J.2
  • 59
    • 0026918024 scopus 로고
    • Quantitative study of contractor evaluation programs and their impact
    • Russell, J. S., and Jaselskis, E. J. (1992b). "Quantitative study of contractor evaluation programs and their impact." J. Constr. Eng. Manage., 118(3), 612-624.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.3 , pp. 612-624
    • Russell, J.S.1    Jaselskis, E.J.2
  • 61
    • 0033099726 scopus 로고    scopus 로고
    • Small to medium contractor contingency and assumption of risk
    • Smith, G. R., and Bohn, C. M. (1999). "Small to medium contractor contingency and assumption of risk." J. Constr. Eng. Manage., 125(2), 101-108.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.2 , pp. 101-108
    • Smith, G.R.1    Bohn, C.M.2
  • 62
    • 0000971955 scopus 로고    scopus 로고
    • Project characteristics for successful public-sector design-build
    • Songer, A. D., and Molenaar, K. R. (1997). "Project characteristics for successful public-sector design-build." J. Constr. Eng. Manage., 123(1), 34-40.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.1 , pp. 34-40
    • Songer, A.D.1    Molenaar, K.R.2
  • 63
    • 0032206731 scopus 로고    scopus 로고
    • Construction labor productivity modeling with neural networks
    • Sonmez, R., and Rowings, J. E. (1998). "Construction labor productivity modeling with neural networks." J. Constr. Eng. Manage., 124(6), 498-504.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 498-504
    • Sonmez, R.1    Rowings, J.E.2
  • 64
    • 13944275670 scopus 로고
    • Thomas Telford, London
    • Stacey, D. (1991). Fast build, Thomas Telford, London, 1-4.
    • (1991) Fast Build , pp. 1-4
    • Stacey, D.1
  • 66
    • 0022674212 scopus 로고
    • Construction personnel role and information needs
    • Tenah, K. A. (1986). "Construction personnel role and information needs." J. Constr. Eng. Manage., 112(1), 33-48.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.1 , pp. 33-48
    • Tenah, K.A.1
  • 67
    • 0026837613 scopus 로고
    • Effects of scheduled overtime on labor productivity
    • Thomas, H. R. (1992). "Effects of scheduled overtime on labor productivity." J. Constr. Eng. Manage., 118(1), 60-76.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.1 , pp. 60-76
    • Thomas, H.R.1
  • 68
    • 0029361062 scopus 로고
    • Quantitative effects of construction changes on labor productivity
    • Thomas, H. R., and Napolitan, C. L. (1995). "Quantitative effects of construction changes on labor productivity." J. Constr. Eng. Manage., 121(3), 290-296.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.3 , pp. 290-296
    • Thomas, H.R.1    Napolitan, C.L.2
  • 69
    • 0000849119 scopus 로고    scopus 로고
    • Scheduled overtime and labor productivity: A quantitative analysis
    • Thomas, H. R., and Raynar, K. A. (1997). "Scheduled overtime and labor productivity: A quantitative analysis." J. Constr. Eng. Manage., 123(2), 181-188.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 181-188
    • Thomas, H.R.1    Raynar, K.A.2
  • 70
    • 0032673945 scopus 로고    scopus 로고
    • Loss of labor productivity due to delivery methods and weather
    • Thomas, R. T., Riley, D. R., and Sanvido, V. E. (1999). "Loss of labor productivity due to delivery methods and weather." J. Constr. Eng. Manage., 125(1), 39-46.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.1 , pp. 39-46
    • Thomas, R.T.1    Riley, D.R.2    Sanvido, V.E.3
  • 74
    • 0026881995 scopus 로고
    • Monte Carlo technique with correlated random variables
    • Touran, A. (1992). "Monte Carlo technique with correlated random variables." J. Constr. Eng. Manage., 118(2), 258-272.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.2 , pp. 258-272
    • Touran, A.1
  • 75
    • 0022677597 scopus 로고
    • Owner and contractor review to reduce claims
    • Vlatas, D. A. (1986). "Owner and contractor review to reduce claims." J. Constr. Eng. Manage., 112(1), 104-111.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.1 , pp. 104-111
    • Vlatas, D.A.1
  • 76
    • 0029377979 scopus 로고
    • Fast track pros and cons: Considerations for industrial projects
    • Williams, G. V. (1995). "Fast track pros and cons: Considerations for industrial projects." J. Manage. Eng., 1(5), 24-32.
    • (1995) J. Manage. Eng. , vol.1 , Issue.5 , pp. 24-32
    • Williams, G.V.1
  • 77
    • 0022780726 scopus 로고
    • Contractors in cyclical economic environments
    • Wong, T. K., and Logcher, R. D. (1986). "Contractors in cyclical economic environments." J. Constr. Eng. Manage., 112(3), 310-325.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.3 , pp. 310-325
    • Wong, T.K.1    Logcher, R.D.2
  • 78
    • 13944265325 scopus 로고
    • A statistical evaluation of the impact of limited resources on project scheduling
    • Woodworth, B. M. (1993). "A statistical evaluation of the impact of limited resources on project scheduling." Cost Eng., 35(2), 25-32.
    • (1993) Cost Eng. , vol.35 , Issue.2 , pp. 25-32
    • Woodworth, B.M.1
  • 79
    • 0027610716 scopus 로고
    • Construction decision support system for delay analysis
    • Yates, J. K. (1993). "Construction decision support system for delay analysis." J. Constr. Eng. Manage., 119(2), 226-244.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.2 , pp. 226-244
    • Yates, J.K.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.