Physiological demands of concrete slab placing and finishing work
-
Abdelhamid, T. S., and Everett, J. G. (1999a). "Physiological demands of concrete slab placing and finishing work." J. Constr. Eng. Manage., 125(1), 47-52.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 47-52
-
-
Abdelhamid, T.S.1
Everett, J.G.2
-
2
-
-
0033101230
-
Time series analysis for construction productivity experiments
-
Abdelhamid, T. S., and Everett, J. G. (1999b). "Time series analysis for construction productivity experiments." J. Constr. Eng. Manage., 125(2), 87-95.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.2
, pp. 87-95
-
-
Abdelhamid, T.S.1
Everett, J.G.2
-
3
-
-
0342969753
-
Combined discrete-event/ continuous simulation for project planning
-
AbouRizk, S. M., and Wales, R. J. (1997). "Combined discrete-event/ continuous simulation for project planning." J. Constr. Eng. Manage., 123(1), 11-20.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.1
, pp. 11-20
-
-
AbouRizk, S.M.1
Wales, R.J.2
-
4
-
-
0026880908
-
Expert system for equipment selection for earth-moving operations
-
Amirkhanian, S. N., and Baker, N. J. (1992). "Expert system for equipment selection for earth-moving operations." J. Constr. Eng. Manage., 118(2), 318-331.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.2
, pp. 318-331
-
-
Amirkhanian, S.N.1
Baker, N.J.2
-
5
-
-
0031832477
-
Performance of concrete placing in Hong Kong buildings
-
Anson, M., and Wang, S. Q. (1998). "Performance of concrete placing in Hong Kong buildings." J. Constr. Eng. Manage., 124(2), 116-124.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.2
, pp. 116-124
-
-
Anson, M.1
Wang, S.Q.2
-
6
-
-
0011101936
-
Factors that affect process quality in the life cycle of building projects
-
Arditi, D., and Gunaydin, H. M. (1998). "Factors that affect process quality in the life cycle of building projects." J. Constr. Eng. Manage., 124(3), 194-203.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.3
, pp. 194-203
-
-
Arditi, D.1
Gunaydin, H.M.2
-
7
-
-
0022675344
-
Attributes of materials management systems
-
Bell, L. C., and Stukhart, G. (1986). "Attributes of materials management systems." J. Constr. Eng. Manage., 112(1), 14-21.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.1
, pp. 14-21
-
-
Bell, L.C.1
Stukhart, G.2
-
9
-
-
0343680028
-
-
Marcel Dekker, New York
-
Bent, J. A., and Humphreys, K. K. (1996). Effective project management through applied cost and schedule control, Marcel Dekker, New York, 313-316.
-
(1996)
Effective Project Management through Applied Cost and Schedule Control
, pp. 313-316
-
-
Bent, J.A.1
Humphreys, K.K.2
-
10
-
-
0027684268
-
Project evaluation procedures
-
Bulick, W. J. (1993). "Project evaluation procedures." Cost Eng., 35(10), 27-32.
-
(1993)
Cost Eng.
, vol.35
, Issue.10
, pp. 27-32
-
-
Bulick, W.J.1
-
11
-
-
0026837054
-
Causes of quality deviations in design and construction
-
Burati, J. C., Farrington, J. J., and Ledbetter, W. B. (1992). "Causes of quality deviations in design and construction." J. Constr. Eng. Manage., 118(1), 34-49.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 34-49
-
-
Burati, J.C.1
Farrington, J.J.2
Ledbetter, W.B.3
-
12
-
-
0032207685
-
Multiskilled labor utilization strategies in construction
-
Burleson, R. C., Haas, C. T., Tucker, R. L., and Stanley, A. (1998). "Multiskilled labor utilization strategies in construction." J. Constr. Eng. Manage., 124(6), 480-489.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 480-489
-
-
Burleson, R.C.1
Haas, C.T.2
Tucker, R.L.3
Stanley, A.4
-
13
-
-
0042557007
-
Effects of delay times on production rates in construction
-
Christian, J., and Hachey, D. (1995). "Effects of delay times on production rates in construction." J. Constr. Eng. Manage., 121(1), 20-26.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.1
, pp. 20-26
-
-
Christian, J.1
Hachey, D.2
-
14
-
-
13944253753
-
-
Publication 6-1, Cost/Schedule Control Task Force, University of Texas, Austin, Tex.
-
Construction Industry Institute (CII). (1986). "Project control for engineering." Publication 6-1, Cost/Schedule Control Task Force, University of Texas, Austin, Tex., 9
-
(1986)
Project Control for Engineering.
, pp. 9
-
-
-
15
-
-
0006182712
-
-
Publication 6-8, Cost/Schedule Control Task Force, University of Texas, Austin, Tex.
-
Construction Industry Institute (CII). (1989). "Management of project risks and uncertainties." Publication 6-8, Cost/Schedule Control Task Force, University of Texas, Austin, Tex., 2-23.
-
(1989)
Management of Project Risks and Uncertainties
, pp. 2-23
-
-
-
16
-
-
2342442938
-
The architect/engineer's role in rehabilitation work
-
Daoud, O. E. K. (1997). "The architect/engineer's role in rehabilitation work." J. Constr. Eng. Manage., 123(1), 1-5.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.1
, pp. 1-5
-
-
Daoud, O.E.K.1
-
17
-
-
0026883408
-
Superchange: Expert system for analysis of changes claims
-
Diekmann, J. E., and Kim, M. P. (1992). "Superchange: Expert system for analysis of changes claims." J. Constr. Eng. Manage., 118(2), 399-411.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.2
, pp. 399-411
-
-
Diekmann, J.E.1
Kim, M.P.2
-
18
-
-
13944268856
-
Design engineering and project control
-
William Ibbs and David B. Ashley, eds., ASCE, New York
-
Diekmann, J. E., Thrush, K. B., and Wilson, T. A. (1987). "Design engineering and project control." Proc., Project Controls: Needs and Solutions, William Ibbs and David B. Ashley, eds., ASCE, New York, 38-46.
-
(1987)
Proc., Project Controls: Needs and Solutions
, pp. 38-46
-
-
Diekmann, J.E.1
Thrush, K.B.2
Wilson, T.A.3
-
19
-
-
0029773659
-
More-stable owner-contractor relationships
-
Dozzi, P., Hartman, F., Tidsbury, N., and Ashrafi, R. (1996). "More-stable owner-contractor relationships." J. Constr. Eng. Manage., 122(1), 30-35.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 30-35
-
-
Dozzi, P.1
Hartman, F.2
Tidsbury, N.3
Ashrafi, R.4
-
21
-
-
0033101229
-
Overexertion injuries in construction
-
Everett, G. J. (1999). "Overexertion injuries in construction." J. Constr. Eng. Manage., 125(2), 109-114.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.2
, pp. 109-114
-
-
Everett, G.J.1
-
22
-
-
0032208519
-
A better way to estimate and mitigate disruption
-
Finke, M. R. (1998). "A better way to estimate and mitigate disruption." J. Constr. Eng. Manage., 124(6), 490-497.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 490-497
-
-
Finke, M.R.1
-
23
-
-
0030318089
-
Automated constructability analysis of work-zone traffic-control planning
-
Fisher, D. J., and Rajan, N. (1996). "Automated constructability analysis of work-zone traffic-control planning." J. Constr. Eng. Manage., 122(1), 36-43.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 36-43
-
-
Fisher, D.J.1
Rajan, N.2
-
25
-
-
0003419817
-
-
Chartered Institute of Building, Berks, U.K.
-
Franks, J. (1990). Building procurement systems, 2nd Ed., Chartered Institute of Building, Berks, U.K., 56-57.
-
(1990)
Building Procurement Systems, 2nd Ed.
, pp. 56-57
-
-
Franks, J.1
-
26
-
-
0023422595
-
Revisions, repairs, and rework on large projects
-
Friedrich, D. R., Daly, J. P., and Dick, W. G. (1987). "Revisions, repairs, and rework on large projects." J. Constr. Eng. Manage., 113(3), 488-500.
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.3
, pp. 488-500
-
-
Friedrich, D.R.1
Daly, J.P.2
Dick, W.G.3
-
27
-
-
0002494175
-
Real world applications of Bayesian networks
-
Heckerman, D., and Wellman, M. P. (1995). "Real world applications of Bayesian networks." Commun. ACM, 38(3), 29.
-
(1995)
Commun. ACM
, vol.38
, Issue.3
, pp. 29
-
-
Heckerman, D.1
Wellman, M.P.2
-
28
-
-
0003991271
-
-
Wiley, New York
-
Hertz, D. B., and Thomas, H. (1983). Risk analysis and its applications, Wiley, New York, 1-5.
-
(1983)
Risk Analysis and Its Applications
, pp. 1-5
-
-
Hertz, D.B.1
Thomas, H.2
-
29
-
-
13944260224
-
Assessing changes and their real impact
-
William Ibbs and David B. Ashley, eds., ASCE, New York
-
Hester, W. T., and Kuprenas, J. A. (1987). "Assessing changes and their real impact." Proc., Project Controls: Needs and Solutions, William Ibbs and David B. Ashley, eds., ASCE, New York, 58-67.
-
(1987)
Proc., Project Controls: Needs and Solutions
, pp. 58-67
-
-
Hester, W.T.1
Kuprenas, J.A.2
-
30
-
-
0042275878
-
Analysis of fatalities recorded by OSHA
-
Hinze, J., and Russell, D. B. (1995). "Analysis of fatalities recorded by OSHA." J. Constr. Eng. Manage., 121(2), 209-214.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.2
, pp. 209-214
-
-
Hinze, J.1
Russell, D.B.2
-
31
-
-
0013199180
-
Identifying root causes of construction injuries
-
Hinze, J., Pederson, C., and Fredley, J. (1998). "Identifying root causes of construction injuries." J. Constr. Eng. Manage., 124(1), 67-71.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 67-71
-
-
Hinze, J.1
Pederson, C.2
Fredley, J.3
-
32
-
-
2342431959
-
Bidding considerations in developing countries
-
Jaselkis, E. J., and Talukhaba, A. (1998). "Bidding considerations in developing countries." J. Constr. Eng. Manage., 124(3), 185-193.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.3
, pp. 185-193
-
-
Jaselkis, E.J.1
Talukhaba, A.2
-
34
-
-
0022771761
-
Design engineers' responsibilities during construction
-
Kagan, H. A., Leary, D. J., and Pratter, G. E. K. (1986). "Design engineers' responsibilities during construction." J. Constr. Eng. Manage., 112(3), 394-402.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.3
, pp. 394-402
-
-
Kagan, H.A.1
Leary, D.J.2
Pratter, G.E.K.3
-
35
-
-
0029469867
-
Risk management perceptions and trends of U.S. construction
-
Kangari, R. (1995). "Risk management perceptions and trends of U.S. construction." J. Constr. Eng. Manage., 121(4), 422-429.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 422-429
-
-
Kangari, R.1
-
36
-
-
0029747295
-
Making effective use of construction lessons learned in project life cycle
-
Kartam, N. A. (1996). "Making effective use of construction lessons learned in project life cycle." J. Constr. Eng. Manage., 122(1), 14-21.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 14-21
-
-
Kartam, N.A.1
-
37
-
-
0003457608
-
-
Wiley, Toronto
-
Kerzner, H. (2001). Project management: A systems approach to planning, scheduling, and controlling, 7th Ed., Wiley, Toronto.
-
(2001)
Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 7th Ed.
-
-
Kerzner, H.1
-
38
-
-
0029361063
-
Safety in developing countries: Professional and bureaucratic problems
-
Koehn, E., and Kothari, R. K. (1995). "Safety in developing countries: Professional and bureaucratic problems." J. Constr. Eng. Manage., 121(3), 261-265.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.3
, pp. 261-265
-
-
Koehn, E.1
Kothari, R.K.2
-
39
-
-
0029746285
-
Lessons learned from multiphase reconstruction project
-
Krizek, R. J., Lo, W., and Hadavi, A. (1996). "Lessons learned from multiphase reconstruction project." J. Constr. Eng. Manage., 122(1), 44-54.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 44-54
-
-
Krizek, R.J.1
Lo, W.2
Hadavi, A.3
-
40
-
-
0025398530
-
Factors affecting construction-planning outcomes
-
Laufer, A., and Cohenca, D. (1990). "Factors affecting construction-planning outcomes." J. Constr. Eng. Manage., 116(1), 135-156.
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.1
, pp. 135-156
-
-
Laufer, A.1
Cohenca, D.2
-
41
-
-
0022726604
-
Productive foremen in industrial construction
-
Lemna, G. J., Borcherding, J. D., and Tucker, R. L. (1986). "Productive foremen in industrial construction." J. Constr. Eng. Manage., 112(2), 192-210.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.2
, pp. 192-210
-
-
Lemna, G.J.1
Borcherding, J.D.2
Tucker, R.L.3
-
42
-
-
0003607653
-
-
Wiley, New York
-
Lifson, M. W., and Shaifer, E. F. (1982). Decision and risk analysis for construction management, Wiley, New York, 133-134.
-
(1982)
Decision and Risk Analysis for Construction Management
, pp. 133-134
-
-
Lifson, M.W.1
Shaifer, E.F.2
-
43
-
-
0000363297
-
Automating communication in civil engineering
-
Luiten, G. T., and Tolman, F. P. (1997). "Automating communication in civil engineering." J. Constr. Eng. Manage., 123(2), 113-120.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.2
, pp. 113-120
-
-
Luiten, G.T.1
Tolman, F.P.2
-
44
-
-
0022681473
-
Motivational implications of construction work
-
Maloney, W. F., and McFillen, J. M. (1986a). "Motivational implications of construction work." J. Constr. Eng. Manage., 112(1), 137-151.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.1
, pp. 137-151
-
-
Maloney, W.F.1
McFillen, J.M.2
-
45
-
-
0022679648
-
Motivation in unionized construction
-
Maloney, W. F., and McFillen, J. M. (1986b). "Motivation in unionized construction." J. Constr. Eng. Manage., 112(1), 122-136.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.1
, pp. 122-136
-
-
Maloney, W.F.1
McFillen, J.M.2
-
46
-
-
0032050006
-
Belief networks for construction performance diagnostics
-
McCabe, B., AbouRizk, S. M., and Goebel, R. (1998). "Belief networks for construction performance diagnostics." J. Comput. Civ. Eng., 12(2), 93-100.
-
(1998)
J. Comput. Civ. Eng.
, vol.12
, Issue.2
, pp. 93-100
-
-
McCabe, B.1
AbouRizk, S.M.2
Goebel, R.3
-
47
-
-
13944275324
-
-
PennWell Publishing, Tulsa, Okla.
-
Megill, R. E. (1984). An introduction to risk analysis, 2nd. Ed., PennWell Publishing, Tulsa, Okla., 124-250.
-
(1984)
An Introduction to Risk Analysis, 2nd. Ed.
, pp. 124-250
-
-
Megill, R.E.1
-
48
-
-
0032670945
-
Risk assessment in construction schedules
-
Mulholland, B., and Christian, J. (1999). "Risk assessment in construction schedules." J. Constr. Eng. Manage., 125(1), 8-15.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 8-15
-
-
Mulholland, B.1
Christian, J.2
-
49
-
-
0026882125
-
Noncontractual methods of integration on construction projects
-
Nam, C. H., and Tatum, C. B. (1992). "Noncontractual methods of integration on construction projects." J. Constr. Eng. Manage., 118(2), 385-398.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.2
, pp. 385-398
-
-
Nam, C.H.1
Tatum, C.B.2
-
50
-
-
0032052024
-
Simulation modeling and management of a large basement construction
-
Ng, W. M., Khor, E. L., Tiong, L. K., and Lee, J. (1998). "Simulation modeling and management of a large basement construction." J. Comput. Civ. Eng., 12(2), 101-110.
-
(1998)
J. Comput. Civ. Eng.
, vol.12
, Issue.2
, pp. 101-110
-
-
Ng, W.M.1
Khor, E.L.2
Tiong, L.K.3
Lee, J.4
-
51
-
-
84930124504
-
Causes of high costs of construction in Nigeria
-
Okpala, D. C., and Aniekwu, A. N. (1988). "Causes of high costs of construction in Nigeria." J. Constr. Eng. Manage., 114(2), 233-244.
-
(1988)
J. Constr. Eng. Manage.
, vol.114
, Issue.2
, pp. 233-244
-
-
Okpala, D.C.1
Aniekwu, A.N.2
-
54
-
-
0002299336
-
Space planning methods for multistory building construction
-
Riley, D. R., and Sanvido, V. E. (1997). "Space planning methods for multistory building construction." J. Constr. Eng. Manage., 123(2), 171-180.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.2
, pp. 171-180
-
-
Riley, D.R.1
Sanvido, V.E.2
-
55
-
-
0029746520
-
Characteristics of the craft workforce
-
Rowings, J. E., Federle, M. O., and Birkland, S. A. (1996). "Characteristics of the craft workforce." J. Constr. Eng. Manage., 122(1), 83-90.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.1
, pp. 83-90
-
-
Rowings, J.E.1
Federle, M.O.2
Birkland, S.A.3
-
56
-
-
0042640313
-
Owner-contractor relationships on contaminated site remediation projects
-
Ruff, C. M., Dzombak, D. A., and Hendrickson, C. T. (1996). "Owner-contractor relationships on contaminated site remediation projects." J. Constr. Eng. Manage., 122(4), 348-353.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.4
, pp. 348-353
-
-
Ruff, C.M.1
Dzombak, D.A.2
Hendrickson, C.T.3
-
57
-
-
0027608442
-
Computerized daily site reporting
-
Russell, A. D. (1993). "Computerized daily site reporting." J. Constr. Eng. Manage., 119(2), 385-402.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 385-402
-
-
Russell, A.D.1
-
58
-
-
70349143375
-
Predicting construction contractor failure prior to contract award
-
Russell, J. S., and Jaselskis, E. J. (1992a). "Predicting construction contractor failure prior to contract award." J. Constr. Eng. Manage., 118(4), 791-811.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.4
, pp. 791-811
-
-
Russell, J.S.1
Jaselskis, E.J.2
-
59
-
-
0026918024
-
Quantitative study of contractor evaluation programs and their impact
-
Russell, J. S., and Jaselskis, E. J. (1992b). "Quantitative study of contractor evaluation programs and their impact." J. Constr. Eng. Manage., 118(3), 612-624.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.3
, pp. 612-624
-
-
Russell, J.S.1
Jaselskis, E.J.2
-
60
-
-
0026835330
-
Critical success factors for construction projects
-
Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., and Coyle, M. (1992). "Critical success factors for construction projects." J. Constr. Eng. Manage., 118(1), 94-111.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 94-111
-
-
Sanvido, V.1
Grobler, F.2
Parfitt, K.3
Guvenis, M.4
Coyle, M.5
-
61
-
-
0033099726
-
Small to medium contractor contingency and assumption of risk
-
Smith, G. R., and Bohn, C. M. (1999). "Small to medium contractor contingency and assumption of risk." J. Constr. Eng. Manage., 125(2), 101-108.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.2
, pp. 101-108
-
-
Smith, G.R.1
Bohn, C.M.2
-
62
-
-
0000971955
-
Project characteristics for successful public-sector design-build
-
Songer, A. D., and Molenaar, K. R. (1997). "Project characteristics for successful public-sector design-build." J. Constr. Eng. Manage., 123(1), 34-40.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.1
, pp. 34-40
-
-
Songer, A.D.1
Molenaar, K.R.2
-
63
-
-
0032206731
-
Construction labor productivity modeling with neural networks
-
Sonmez, R., and Rowings, J. E. (1998). "Construction labor productivity modeling with neural networks." J. Constr. Eng. Manage., 124(6), 498-504.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.6
, pp. 498-504
-
-
Sonmez, R.1
Rowings, J.E.2
-
64
-
-
13944275670
-
-
Thomas Telford, London
-
Stacey, D. (1991). Fast build, Thomas Telford, London, 1-4.
-
(1991)
Fast Build
, pp. 1-4
-
-
Stacey, D.1
-
66
-
-
0022674212
-
Construction personnel role and information needs
-
Tenah, K. A. (1986). "Construction personnel role and information needs." J. Constr. Eng. Manage., 112(1), 33-48.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.1
, pp. 33-48
-
-
Tenah, K.A.1
-
67
-
-
0026837613
-
Effects of scheduled overtime on labor productivity
-
Thomas, H. R. (1992). "Effects of scheduled overtime on labor productivity." J. Constr. Eng. Manage., 118(1), 60-76.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 60-76
-
-
Thomas, H.R.1
-
68
-
-
0029361062
-
Quantitative effects of construction changes on labor productivity
-
Thomas, H. R., and Napolitan, C. L. (1995). "Quantitative effects of construction changes on labor productivity." J. Constr. Eng. Manage., 121(3), 290-296.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.3
, pp. 290-296
-
-
Thomas, H.R.1
Napolitan, C.L.2
-
69
-
-
0000849119
-
Scheduled overtime and labor productivity: A quantitative analysis
-
Thomas, H. R., and Raynar, K. A. (1997). "Scheduled overtime and labor productivity: A quantitative analysis." J. Constr. Eng. Manage., 123(2), 181-188.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.2
, pp. 181-188
-
-
Thomas, H.R.1
Raynar, K.A.2
-
70
-
-
0032673945
-
Loss of labor productivity due to delivery methods and weather
-
Thomas, R. T., Riley, D. R., and Sanvido, V. E. (1999). "Loss of labor productivity due to delivery methods and weather." J. Constr. Eng. Manage., 125(1), 39-46.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.1
, pp. 39-46
-
-
Thomas, R.T.1
Riley, D.R.2
Sanvido, V.E.3
-
71
-
-
0000847043
-
Comparison of labor productivity
-
Thomas, H. R., Sanders, S. R., and Bilal, S. (1992). "Comparison of labor productivity." J. Constr. Eng. Manage., 118(4), 635-650.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.4
, pp. 635-650
-
-
Thomas, H.R.1
Sanders, S.R.2
Bilal, S.3
-
72
-
-
0002767045
-
Critical communication variables
-
Thomas, S. R., Tucker, R. L., and Kelly, W. R. (1998). "Critical communication variables." J. Constr. Eng. Manage., 124(1), 58-66.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 58-66
-
-
Thomas, S.R.1
Tucker, R.L.2
Kelly, W.R.3
-
73
-
-
0003573554
-
-
Thomas Telford, London
-
Thompson, P. A., and Perry, J. G. (1992). Engineering construction risks, Thomas Telford, London, 18-19.
-
(1992)
Engineering Construction Risks
, pp. 18-19
-
-
Thompson, P.A.1
Perry, J.G.2
-
74
-
-
0026881995
-
Monte Carlo technique with correlated random variables
-
Touran, A. (1992). "Monte Carlo technique with correlated random variables." J. Constr. Eng. Manage., 118(2), 258-272.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.2
, pp. 258-272
-
-
Touran, A.1
-
75
-
-
0022677597
-
Owner and contractor review to reduce claims
-
Vlatas, D. A. (1986). "Owner and contractor review to reduce claims." J. Constr. Eng. Manage., 112(1), 104-111.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.1
, pp. 104-111
-
-
Vlatas, D.A.1
-
76
-
-
0029377979
-
Fast track pros and cons: Considerations for industrial projects
-
Williams, G. V. (1995). "Fast track pros and cons: Considerations for industrial projects." J. Manage. Eng., 1(5), 24-32.
-
(1995)
J. Manage. Eng.
, vol.1
, Issue.5
, pp. 24-32
-
-
Williams, G.V.1
-
77
-
-
0022780726
-
Contractors in cyclical economic environments
-
Wong, T. K., and Logcher, R. D. (1986). "Contractors in cyclical economic environments." J. Constr. Eng. Manage., 112(3), 310-325.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.3
, pp. 310-325
-
-
Wong, T.K.1
Logcher, R.D.2
-
78
-
-
13944265325
-
A statistical evaluation of the impact of limited resources on project scheduling
-
Woodworth, B. M. (1993). "A statistical evaluation of the impact of limited resources on project scheduling." Cost Eng., 35(2), 25-32.
-
(1993)
Cost Eng.
, vol.35
, Issue.2
, pp. 25-32
-
-
Woodworth, B.M.1
-
79
-
-
0027610716
-
Construction decision support system for delay analysis
-
Yates, J. K. (1993). "Construction decision support system for delay analysis." J. Constr. Eng. Manage., 119(2), 226-244.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 226-244
-
-
Yates, J.K.1
|