1
-
-
0028457078
-
Fitting beta distributions based on sample data
-
0733-9364 10.1061/(ASCE)0733-9364(1994)120:2(288)
-
AbouRizk, S., Halpin, D., and Wilson, J. (1994). Fitting beta distributions based on sample data. J. Constr. Eng. Manage., 120 (2), 288-305. 0733-9364 10.1061/(ASCE)0733-9364(1994)120:2(288)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.2
, pp. 288-305
-
-
Abourizk, S.1
Halpin, D.2
Wilson, J.3
-
2
-
-
0019030430
-
Simulation of repetitive-unit construction
-
0569-7948
-
Ashley, D. B. (1980). Simulation of repetitive-unit construction. J. Constr. Div. 0569-7948, 106 (2), 185-194.
-
(1980)
J. Constr. Div.
, vol.106
, Issue.2
, pp. 185-194
-
-
Ashley, D.B.1
-
3
-
-
0342906631
-
Defining triangular probability distributions from historical cost data
-
0733-9364 10.1061/(ASCE)0733-9364(2000)126:1(29)
-
Back, W., Boles, W., and Fry, G. (2000). Defining triangular probability distributions from historical cost data. J. Constr. Eng. Manage., 126 (1), 29-37. 0733-9364 10.1061/(ASCE)0733-9364(2000)126:1(29)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.1
, pp. 29-37
-
-
Back, W.1
Boles, W.2
Fry, G.3
-
4
-
-
0019064535
-
Construction planning-Beyond the critical path
-
0569-7948
-
Birrell, G. S. (1980). Construction planning-Beyond the critical path. J. Constr. Div. 0569-7948, 106 (3), 389-407.
-
(1980)
J. Constr. Div.
, vol.106
, Issue.3
, pp. 389-407
-
-
Birrell, G.S.1
-
5
-
-
0028409229
-
Scheduling and control of linear projects
-
0733-9364 10.1061/(ASCE)0733-9364(2001)127:3(199)
-
Eldin, N. N., and Senouci, A. B. (1994). Scheduling and control of linear projects. Canadian J. Civ. Eng. 0733-9364 10.1061/(ASCE)0733-9364(2001)127: 3(199)
-
(1994)
Canadian J. Civ. Eng.
-
-
Eldin, N.N.1
Senouci, A.B.2
-
6
-
-
79959409644
-
Resource-driven scheduling of repetitive activities on construction projects
-
El-Rayes, K., and Moselhi, O. (1998). Resource-driven scheduling of repetitive activities on construction projects. Constr. Manage. Econ., 35 (6), 574-587.
-
(1998)
Constr. Manage. Econ.
, vol.35
, Issue.6
, pp. 574-587
-
-
El-Rayes, K.1
Moselhi, O.2
-
7
-
-
34248590966
-
Predicting profit performance for selecting candidate international construction projects
-
DOI 10.1061/(ASCE)0733-9364(2007)133:6(425)
-
Han, S., Kim, D., and Kim, H. (2007). Predicting profit performance for selecting candidate international construction project. J. Constr. Eng. Manage., 133 (6), 425-436. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:6(425) (Pubitemid 46753482)
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.6
, pp. 425-436
-
-
Han, S.H.1
Kim, D.Y.2
Kim, H.3
-
8
-
-
33846660491
-
Simulation analysis of productivity variation by GPS implementation in earthmoving operations
-
0926-5805 10.1016/j.autcon.2006.10.004
-
Han, S., Lee, S., Hong, T., and Chang, H. (2006). Simulation analysis of productivity variation by GPS implementation in earthmoving operations. Canadian J. Civ. Eng. 0926-5805 10.1016/j.autcon.2006.10.004
-
(2006)
Canadian J. Civ. Eng.
-
-
Han, S.1
Lee, S.2
Hong, T.3
Chang, H.4
-
9
-
-
33646584142
-
Optimal planning and scheduling for repetitive construction projects
-
0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(11)
-
Hyari, K., and El-Rayes, K. (2006). Optimal planning and scheduling for repetitive construction projects. J. Manage. Eng., 22 (1), 11-19. 0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(11)
-
(2006)
J. Manage. Eng.
, vol.22
, Issue.1
, pp. 11-19
-
-
Hyari, K.1
El-Rayes, K.2
-
10
-
-
0022128947
-
SIREN: A repetitive construction simulation model
-
0733-9364 10.1061/(ASCE)0733-9364(1985)111:3(308)
-
Kavanagh, D. P. (1985). SIREN: A repetitive construction simulation model. J. Constr. Eng. Manage., 111 (3), 308-323. 0733-9364 10.1061/(ASCE)0733- 9364(1985)111:3(308)
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.3
, pp. 308-323
-
-
Kavanagh, D.P.1
-
11
-
-
79959475380
-
An analysis of application by formwork in concrete structural frame work for tall building in Korea
-
Korea Institute of Building Construction, Seoul, Korea
-
Kim, T., Jin, L., Shin, Y., Cho, S., and Kang, K. (2007). An analysis of application by formwork in concrete structural frame work for tall building in Korea. Annual Conf. on the Korea Institute of Building Construction, Korea Institute of Building Construction, Seoul, Korea, 387-391.
-
(2007)
Annual Conf. on the Korea Institute of Building Construction
, pp. 387-391
-
-
Kim, T.1
Jin, L.2
Shin, Y.3
Cho, S.4
Kang, K.5
-
14
-
-
79959422288
-
Determination of optimal and stable prediction parameters values in chaotic time series
-
ASCE, Reston, VA
-
Ling, S. Y., Pasha, M. F., Doun, C. D., Phoon, C. K., and Liaw, C. Y. (2001). Determination of optimal and stable prediction parameters values in chaotic time series. World Water Congress 221, ASCE, Reston, VA.
-
(2001)
World Water Congress 221
-
-
Ling, S.Y.1
Pasha, M.F.2
Doun, C.D.3
Phoon, C.K.4
Liaw, C.Y.5
-
15
-
-
37249056991
-
Automated approach to negotiations of BOT contracts with the consideration of project risk
-
DOI 10.1061/(ASCE)0733-9364(2008)134:1(18)
-
Liou, F., and Huang, C. (2008). Automated approach to negotiations of BOT contracts with the consideration of project risk. J. Constr. Eng. Manage., 134 (1), 18-24. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:1(18) (Pubitemid 350265374)
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.1
, pp. 18-24
-
-
Liou, F.-M.1
Huang, C.-P.2
-
16
-
-
34548165524
-
Productivity study of microtunneling pipe installation using simulation
-
DOI 10.1061/(ASCE)1076-0342(2007)13:3(247)
-
Luo, R. Y., and Najafi, M. (2007). Productivity study of microtunneling pipe installation using simulation. J. Infrastruct. Syst., 13 (3), 247-260. 1076-0342 10.1061/(ASCE)1076-0342(2007)13:3(247) (Pubitemid 47304852)
-
(2007)
Journal of Infrastructure Systems
, vol.13
, Issue.3
, pp. 247-260
-
-
Luo, R.Y.1
Najafi, M.2
-
17
-
-
0003906653
-
-
3rd Ed., Van Nostrand Reinhold, New York
-
Moder, J. J., Philips, C. R., and Davis, E. W. (1983). Project management with CPM, PERT and Precedence diagramming, 3rd Ed., Van Nostrand Reinhold, New York.
-
(1983)
Project Management with CPM, PERT and Precedence Diagramming
-
-
Moder, J.J.1
Philips, C.R.2
Davis, E.W.3
-
18
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(681)
-
Moselhi, O., and El-Rayes, K. (1993). Scheduling of repetitive projects with cost optimization. J. Constr. Eng. Manage., 119 (4), 681-697. 0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(681)
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
19
-
-
13944275955
-
Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction schedule risk model
-
DOI 10.1061/(ASCE)0733-9364(2003)129:5(518)
-
Nasir, D., McCabe, B., and Hartono, L. (2003). Evaluating risk in construction-schedule model: Construction schedule risk model. J. Constr. Eng. Manage., 129 (5), 518-527. 0733-9364 10.1061/(ASCE)0733-9364(2003)129:5(518) (Pubitemid 40265439)
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.5
, pp. 518-527
-
-
Nasir, D.1
McCabe, B.2
Hartono, L.3
-
20
-
-
37249052739
-
Construction project network evaluation with correlated schedule risk analysis model
-
DOI 10.1061/(ASCE)0733-9364(2008)134:1(49)
-
Okmen, O., and Oztas, A. (2008). Construction project network evaluation with correlated schedule risk analysis model. J. Constr. Eng. Manage., 134 (1), 49-63. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:1(49) (Pubitemid 350265378)
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.1
, pp. 49-63
-
-
Okmen, O.1
Oztas, A.2
-
21
-
-
0025447970
-
RPM: Repetitive project modeling
-
0733-9364 10.1061/(ASCE)0733-9364(1990)116:2(316)
-
Reda, R. M. (1990). RPM: Repetitive project modeling. J. Constr. Eng. Manage., 116 (2), 316-330. 0733-9364 10.1061/(ASCE)0733-9364(1990)116:2(316)
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 316-330
-
-
Reda, R.M.1
-
22
-
-
0023984188
-
Extensions to linear scheduling optimization
-
0733-9364 10.1061/(ASCE)0733-9364(1988)114:1(36)
-
Russell, A. D., and Caselton, W. F. (1988). Extensions to linear scheduling optimization. J. Constr. Eng. Manage., 114 (1), 36-52. 0733-9364 10.1061/(ASCE)0733-9364(1988)114:1(36)
-
(1988)
J. Constr. Eng. Manage.
, vol.114
, Issue.1
, pp. 36-52
-
-
Russell, A.D.1
Caselton, W.F.2
-
24
-
-
33645501149
-
Work continuity constraints in project scheduling
-
0733-9364 10.1061/(ASCE)0733-9364(2006)132:1(14)
-
Vanhoucke, M. (2006). Work continuity constraints in project scheduling. J. Constr. Eng. Manage., 132 (1), 14-25. 0733-9364 10.1061/(ASCE)0733-9364(2006) 132:1(14)
-
(2006)
J. Constr. Eng. Manage.
, vol.132
, Issue.1
, pp. 14-25
-
-
Vanhoucke, M.1
-
25
-
-
0035454491
-
Comparison of linear scheduling model (LSM) and critical path method (CPM)
-
DOI 10.1061/(ASCE)0733-9364(2001)127:5(374)
-
Yamin, R. A., and Harmelink, D. J. (2001). Comparison of linear scheduling model and critical path method. J. Constr. Eng. Manage., 127 (5), 374-381. 0733-9364 10.1061/(ASCE)0733-9364(2001)127:5(374) (Pubitemid 33073866)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.5
, pp. 374-381
-
-
Yamin, R.A.1
Harmelink, D.J.2
|