메뉴 건너뛰기




Volumn 137, Issue 6, 2011, Pages 393-402

Simulation-based schedule estimation model for ACS-based core wall construction of high-rise building

Author keywords

Core walls; High rise buildings; Scheduling; Simulation

Indexed keywords

CONSTRUCTION ACTIVITIES; CONSTRUCTION PHASE; CONSTRUCTION PROJECTS; CONSTRUCTION SCHEDULES; CORE WALL; DEVELOPED MODEL; ESTIMATION MODELS; HIGH RISE BUILDING; LABOR RESOURCES; PLANNING PHASE; PROJECT MANAGERS; SIMULATION; SIMULATION MODEL; SIMULATION-BASED;

EID: 79959412033     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000300     Document Type: Article
Times cited : (28)

References (25)
  • 1
    • 0028457078 scopus 로고
    • Fitting beta distributions based on sample data
    • 0733-9364 10.1061/(ASCE)0733-9364(1994)120:2(288)
    • AbouRizk, S., Halpin, D., and Wilson, J. (1994). Fitting beta distributions based on sample data. J. Constr. Eng. Manage., 120 (2), 288-305. 0733-9364 10.1061/(ASCE)0733-9364(1994)120:2(288)
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.2 , pp. 288-305
    • Abourizk, S.1    Halpin, D.2    Wilson, J.3
  • 2
    • 0019030430 scopus 로고
    • Simulation of repetitive-unit construction
    • 0569-7948
    • Ashley, D. B. (1980). Simulation of repetitive-unit construction. J. Constr. Div. 0569-7948, 106 (2), 185-194.
    • (1980) J. Constr. Div. , vol.106 , Issue.2 , pp. 185-194
    • Ashley, D.B.1
  • 3
    • 0342906631 scopus 로고    scopus 로고
    • Defining triangular probability distributions from historical cost data
    • 0733-9364 10.1061/(ASCE)0733-9364(2000)126:1(29)
    • Back, W., Boles, W., and Fry, G. (2000). Defining triangular probability distributions from historical cost data. J. Constr. Eng. Manage., 126 (1), 29-37. 0733-9364 10.1061/(ASCE)0733-9364(2000)126:1(29)
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.1 , pp. 29-37
    • Back, W.1    Boles, W.2    Fry, G.3
  • 4
    • 0019064535 scopus 로고
    • Construction planning-Beyond the critical path
    • 0569-7948
    • Birrell, G. S. (1980). Construction planning-Beyond the critical path. J. Constr. Div. 0569-7948, 106 (3), 389-407.
    • (1980) J. Constr. Div. , vol.106 , Issue.3 , pp. 389-407
    • Birrell, G.S.1
  • 5
    • 0028409229 scopus 로고
    • Scheduling and control of linear projects
    • 0733-9364 10.1061/(ASCE)0733-9364(2001)127:3(199)
    • Eldin, N. N., and Senouci, A. B. (1994). Scheduling and control of linear projects. Canadian J. Civ. Eng. 0733-9364 10.1061/(ASCE)0733-9364(2001)127: 3(199)
    • (1994) Canadian J. Civ. Eng.
    • Eldin, N.N.1    Senouci, A.B.2
  • 6
    • 79959409644 scopus 로고    scopus 로고
    • Resource-driven scheduling of repetitive activities on construction projects
    • El-Rayes, K., and Moselhi, O. (1998). Resource-driven scheduling of repetitive activities on construction projects. Constr. Manage. Econ., 35 (6), 574-587.
    • (1998) Constr. Manage. Econ. , vol.35 , Issue.6 , pp. 574-587
    • El-Rayes, K.1    Moselhi, O.2
  • 7
    • 34248590966 scopus 로고    scopus 로고
    • Predicting profit performance for selecting candidate international construction projects
    • DOI 10.1061/(ASCE)0733-9364(2007)133:6(425)
    • Han, S., Kim, D., and Kim, H. (2007). Predicting profit performance for selecting candidate international construction project. J. Constr. Eng. Manage., 133 (6), 425-436. 0733-9364 10.1061/(ASCE)0733-9364(2007)133:6(425) (Pubitemid 46753482)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.6 , pp. 425-436
    • Han, S.H.1    Kim, D.Y.2    Kim, H.3
  • 8
    • 33846660491 scopus 로고    scopus 로고
    • Simulation analysis of productivity variation by GPS implementation in earthmoving operations
    • 0926-5805 10.1016/j.autcon.2006.10.004
    • Han, S., Lee, S., Hong, T., and Chang, H. (2006). Simulation analysis of productivity variation by GPS implementation in earthmoving operations. Canadian J. Civ. Eng. 0926-5805 10.1016/j.autcon.2006.10.004
    • (2006) Canadian J. Civ. Eng.
    • Han, S.1    Lee, S.2    Hong, T.3    Chang, H.4
  • 9
    • 33646584142 scopus 로고    scopus 로고
    • Optimal planning and scheduling for repetitive construction projects
    • 0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(11)
    • Hyari, K., and El-Rayes, K. (2006). Optimal planning and scheduling for repetitive construction projects. J. Manage. Eng., 22 (1), 11-19. 0742-597X 10.1061/(ASCE)0742-597X(2006)22:1(11)
    • (2006) J. Manage. Eng. , vol.22 , Issue.1 , pp. 11-19
    • Hyari, K.1    El-Rayes, K.2
  • 10
    • 0022128947 scopus 로고
    • SIREN: A repetitive construction simulation model
    • 0733-9364 10.1061/(ASCE)0733-9364(1985)111:3(308)
    • Kavanagh, D. P. (1985). SIREN: A repetitive construction simulation model. J. Constr. Eng. Manage., 111 (3), 308-323. 0733-9364 10.1061/(ASCE)0733- 9364(1985)111:3(308)
    • (1985) J. Constr. Eng. Manage. , vol.111 , Issue.3 , pp. 308-323
    • Kavanagh, D.P.1
  • 11
    • 79959475380 scopus 로고    scopus 로고
    • An analysis of application by formwork in concrete structural frame work for tall building in Korea
    • Korea Institute of Building Construction, Seoul, Korea
    • Kim, T., Jin, L., Shin, Y., Cho, S., and Kang, K. (2007). An analysis of application by formwork in concrete structural frame work for tall building in Korea. Annual Conf. on the Korea Institute of Building Construction, Korea Institute of Building Construction, Seoul, Korea, 387-391.
    • (2007) Annual Conf. on the Korea Institute of Building Construction , pp. 387-391
    • Kim, T.1    Jin, L.2    Shin, Y.3    Cho, S.4    Kang, K.5
  • 14
    • 79959422288 scopus 로고    scopus 로고
    • Determination of optimal and stable prediction parameters values in chaotic time series
    • ASCE, Reston, VA
    • Ling, S. Y., Pasha, M. F., Doun, C. D., Phoon, C. K., and Liaw, C. Y. (2001). Determination of optimal and stable prediction parameters values in chaotic time series. World Water Congress 221, ASCE, Reston, VA.
    • (2001) World Water Congress 221
    • Ling, S.Y.1    Pasha, M.F.2    Doun, C.D.3    Phoon, C.K.4    Liaw, C.Y.5
  • 15
    • 37249056991 scopus 로고    scopus 로고
    • Automated approach to negotiations of BOT contracts with the consideration of project risk
    • DOI 10.1061/(ASCE)0733-9364(2008)134:1(18)
    • Liou, F., and Huang, C. (2008). Automated approach to negotiations of BOT contracts with the consideration of project risk. J. Constr. Eng. Manage., 134 (1), 18-24. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:1(18) (Pubitemid 350265374)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.1 , pp. 18-24
    • Liou, F.-M.1    Huang, C.-P.2
  • 16
    • 34548165524 scopus 로고    scopus 로고
    • Productivity study of microtunneling pipe installation using simulation
    • DOI 10.1061/(ASCE)1076-0342(2007)13:3(247)
    • Luo, R. Y., and Najafi, M. (2007). Productivity study of microtunneling pipe installation using simulation. J. Infrastruct. Syst., 13 (3), 247-260. 1076-0342 10.1061/(ASCE)1076-0342(2007)13:3(247) (Pubitemid 47304852)
    • (2007) Journal of Infrastructure Systems , vol.13 , Issue.3 , pp. 247-260
    • Luo, R.Y.1    Najafi, M.2
  • 18
    • 0027866760 scopus 로고
    • Scheduling of repetitive projects with cost optimization
    • 0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(681)
    • Moselhi, O., and El-Rayes, K. (1993). Scheduling of repetitive projects with cost optimization. J. Constr. Eng. Manage., 119 (4), 681-697. 0733-9364 10.1061/(ASCE)0733-9364(1993)119:4(681)
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 681-697
    • Moselhi, O.1    El-Rayes, K.2
  • 19
    • 13944275955 scopus 로고    scopus 로고
    • Evaluating Risk in Construction-Schedule Model (ERIC-S): Construction schedule risk model
    • DOI 10.1061/(ASCE)0733-9364(2003)129:5(518)
    • Nasir, D., McCabe, B., and Hartono, L. (2003). Evaluating risk in construction-schedule model: Construction schedule risk model. J. Constr. Eng. Manage., 129 (5), 518-527. 0733-9364 10.1061/(ASCE)0733-9364(2003)129:5(518) (Pubitemid 40265439)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 518-527
    • Nasir, D.1    McCabe, B.2    Hartono, L.3
  • 20
    • 37249052739 scopus 로고    scopus 로고
    • Construction project network evaluation with correlated schedule risk analysis model
    • DOI 10.1061/(ASCE)0733-9364(2008)134:1(49)
    • Okmen, O., and Oztas, A. (2008). Construction project network evaluation with correlated schedule risk analysis model. J. Constr. Eng. Manage., 134 (1), 49-63. 0733-9364 10.1061/(ASCE)0733-9364(2008)134:1(49) (Pubitemid 350265378)
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.1 , pp. 49-63
    • Okmen, O.1    Oztas, A.2
  • 21
    • 0025447970 scopus 로고
    • RPM: Repetitive project modeling
    • 0733-9364 10.1061/(ASCE)0733-9364(1990)116:2(316)
    • Reda, R. M. (1990). RPM: Repetitive project modeling. J. Constr. Eng. Manage., 116 (2), 316-330. 0733-9364 10.1061/(ASCE)0733-9364(1990)116:2(316)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.2 , pp. 316-330
    • Reda, R.M.1
  • 22
    • 0023984188 scopus 로고
    • Extensions to linear scheduling optimization
    • 0733-9364 10.1061/(ASCE)0733-9364(1988)114:1(36)
    • Russell, A. D., and Caselton, W. F. (1988). Extensions to linear scheduling optimization. J. Constr. Eng. Manage., 114 (1), 36-52. 0733-9364 10.1061/(ASCE)0733-9364(1988)114:1(36)
    • (1988) J. Constr. Eng. Manage. , vol.114 , Issue.1 , pp. 36-52
    • Russell, A.D.1    Caselton, W.F.2
  • 24
    • 33645501149 scopus 로고    scopus 로고
    • Work continuity constraints in project scheduling
    • 0733-9364 10.1061/(ASCE)0733-9364(2006)132:1(14)
    • Vanhoucke, M. (2006). Work continuity constraints in project scheduling. J. Constr. Eng. Manage., 132 (1), 14-25. 0733-9364 10.1061/(ASCE)0733-9364(2006) 132:1(14)
    • (2006) J. Constr. Eng. Manage. , vol.132 , Issue.1 , pp. 14-25
    • Vanhoucke, M.1
  • 25
    • 0035454491 scopus 로고    scopus 로고
    • Comparison of linear scheduling model (LSM) and critical path method (CPM)
    • DOI 10.1061/(ASCE)0733-9364(2001)127:5(374)
    • Yamin, R. A., and Harmelink, D. J. (2001). Comparison of linear scheduling model and critical path method. J. Constr. Eng. Manage., 127 (5), 374-381. 0733-9364 10.1061/(ASCE)0733-9364(2001)127:5(374) (Pubitemid 33073866)
    • (2001) Journal of Construction Engineering and Management , vol.127 , Issue.5 , pp. 374-381
    • Yamin, R.A.1    Harmelink, D.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.