-
3
-
-
13944251393
-
-
" J. Constr. Eng. Manage., (4).
-
Chau, K. W., Anson, M., and Zhang, J. P. (2004). " Four-dimensional visualization of construction scheduling and site utilization.." J. Constr. Eng. Manage., 130 (4), 598-606.
-
(2004)
Four-dimensional Visualization of Construction Scheduling and Site Utilization
, vol.130
, pp. 598-606
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
4
-
-
0002604591
-
-
Center for Integrated Facility Engineering, Stanford Univ., Palo Alto, Calif.
-
Collier, E., and Fischer, M. (1995). Four-dimensional modeling in design and construction, Center for Integrated Facility Engineering, Stanford Univ., Palo Alto, Calif.
-
(1995)
Four-dimensional Modeling in Design and Construction
-
-
Collier, E.1
Fischer, M.2
-
5
-
-
27644529495
-
-
Construction firm performance and IT utilization.", ASCE, Reston, Va..
-
El-Mashaleh, M., O'Brien, W. J., and Minchin, R. E. (2005). " Construction firm performance and IT utilization.." Proc. Construction Research Congress: Broadening Perspectives, ASCE, Reston, Va., 642-646.
-
(2005)
Proc. Construction Research Congress: Broadening Perspectives
, pp. 642-646
-
-
El-Mashaleh, M.1
O'Brien, W.J.2
Minchin, R.E.3
-
6
-
-
0000693991
-
-
J. Constr. Eng. Manage., (4).
-
Fischer, M. A., and Aalami, F. (1996). " Scheduling with computer-interpretable construction method models.." J. Constr. Eng. Manage., 122 (4), 337-347.
-
(1996)
Scheduling with Computer-interpretable Construction Method Models
, vol.122
, pp. 337-347
-
-
Fischer, M.A.1
Aalami, F.2
-
7
-
-
33645149548
-
-
Center for Integrated Facility Engineering, Stanford Univ., Palo Alto, Calif.
-
Fischer, M. A., and Kunz, J. (2004). The scope and role of information technology in construction, Center for Integrated Facility Engineering, Stanford Univ., Palo Alto, Calif.
-
(2004)
The Scope and Role of Information Technology in Construction
-
-
Fischer, M.A.1
Kunz, J.2
-
8
-
-
9144259393
-
-
" LeadershiManage. Eng., (2).
-
Hastings, J., Kibiloski, J., Fischer, M., Haymaker, J., and Liston, K. (2003). " Four-dimensional modeling to support construction planning of the Stata Center project.." Leadership Manage. Eng., 3 (2) 86-90.
-
(2003)
Four-dimensional Modeling to Support Construction Planning of the Stata Center Project
, vol.3
, pp. 86-90
-
-
Hastings, J.1
Kibiloski, J.2
Fischer, M.3
Haymaker, J.4
Liston, K.5
-
9
-
-
33751384135
-
-
Center for Integrated Facility Engineering, Stanford Univ., Palo Alto, Calif.
-
Haymaker, J., and Fischer, M. (2001). Challenges and benefits of 4D modeling on the Walt Disney concert hall project, Center for Integrated Facility Engineering, Stanford Univ., Palo Alto, Calif.
-
(2001)
Challenges and Benefits of 4D Modeling on the Walt Disney Concert Hall Project
-
-
Haymaker, J.1
Fischer, M.2
-
10
-
-
47749145470
-
-
PM4D Final Re, Center for Integrated Facility Engineering, Stanford Univ., Palo Alto, Calif.
-
Kam, C. (2002). PM4D Final Rep., Center for Integrated Facility Engineering, Stanford Univ., Palo Alto, Calif.
-
(2002)
-
-
Kam, C.1
-
12
-
-
0034227635
-
-
J. Constr. Eng. Manage., (4).
-
Koo, B., and Fischer, M. (2000). " Feasibility study of 4D CAD in commercial construction.." J. Constr. Eng. Manage., 126 (4), 251-260.
-
(2000)
Feasibility Study of 4D CAD in Commercial Construction
, vol.126
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
13
-
-
47749130161
-
-
A visual simulation system for construction planning/management.", Architectural Institute of Japan, Tokyo.
-
Matsuzawa, T., Uchiyama, Y., Akimoto, M., and Suzuki, M. (1994). " A visual simulation system for construction planning/management.." Proc., 17th Symp. on Computer Technology of Information, Systems, and Applications, Architectural Institute of Japan, Tokyo, 37-42.
-
(1994)
Proc., 17th Symp. on Computer Technology of Information, Systems, and Applications
, pp. 37-42
-
-
Matsuzawa, T.1
Uchiyama, Y.2
Akimoto, M.3
Suzuki, M.4
|