-
1
-
-
77956842741
-
Framework for highly integrated, interoperable construction simulation environments
-
Jeju, Korea
-
AbouRizk, S. (2009). Framework for highly integrated, interoperable construction simulation environments. Proc., ICCEM-ICCPM 2009, Jeju, Korea
-
(2009)
Proc., ICCEM-ICCPM 2009
-
-
Abourizk, S.1
-
2
-
-
77956838319
-
The role of simulation in construction engineering and management
-
0733-9364, 10.1061/(ASCE)CO.1943-7862.0000220
-
AbouRizk, S. (2010). The role of simulation in construction engineering and management. J. Constr. Eng. Manage. 0733-9364, 136 (10), 1140-1153. 10.1061/(ASCE)CO.1943-7862.0000220
-
(2010)
J. Constr. Eng. Manage.
, vol.136
, Issue.10
, pp. 1140-1153
-
-
Abourizk, S.1
-
3
-
-
0027609408
-
Applications of computer simulation in resolving construction disputes
-
0733-9364, 10.1061/(ASCE)0733-9364(1993)119:2(355)
-
AbouRizk, S., and Dozzi, S. (1993). Applications of computer simulation in resolving construction disputes. J. Constr. Eng. Manage. 0733-9364, 119 (2), 355-373. 10.1061/(ASCE)0733-9364(1993)119:2(355)
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 355-373
-
-
Abourizk, S.1
Dozzi, S.2
-
4
-
-
77951558408
-
An overview of the COSYE environment for construction simulation
-
IEEE, Piscataway, NJ
-
AbouRizk, S., and Hague, S. (2009). An overview of the COSYE environment for construction simulation. Proc., Winter Simulation Conf., IEEE, Piscataway, NJ, 2624-2634.
-
(2009)
Proc., Winter Simulation Conf.
, pp. 2624-2634
-
-
Abourizk, S.1
Hague, S.2
-
5
-
-
77956794349
-
-
Tech. Report to Natural Sciences and Engineering Research Council of Canada (NSERC), PCL Construction, North American Construction, Lafarge Canada, Inland Construction, Alberco, and O. J. Pipelines
-
AbouRizk, S., and Hajjar, D. (1996). Productivity improvement for construction. Tech. Report to Natural Sciences and Engineering Research Council of Canada (NSERC), PCL Construction, North American Construction, Lafarge Canada, Inland Construction, Alberco, and O. J. Pipelines.
-
(1996)
Productivity Improvement for Construction
-
-
Abourizk, S.1
Hajjar, D.2
-
6
-
-
0025682920
-
Probabilistic simulation studies for repetitive construction processes
-
0733-9364, 10.1061/(ASCE)0733-9364(1990)116:4(575)
-
AbouRizk, S. M., and Halpin, D. W. (1990). Probabilistic simulation studies for repetitive construction processes. J. Constr. Eng. Manage. 0733-9364, 116 (4), 575-594. 10.1061/(ASCE)0733-9364(1990)116:4(575)
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.4
, pp. 575-594
-
-
Abourizk, S.M.1
Halpin, D.W.2
-
7
-
-
0036926538
-
Optimal construction project planning
-
IEEE, Piscataway, NJ
-
AbouRizk, S., and Mohamed, Y. (2002). Optimal construction project planning. Proc., Winter Simulation Conf., Vol. 2, IEEE, Piscataway, NJ, 1704-1708.
-
(2002)
Proc., Winter Simulation Conf.
, vol.2
, pp. 1704-1708
-
-
Abourizk, S.1
Mohamed, Y.2
-
8
-
-
0031377515
-
Analysis of productivity on a tunnel operation using computer simulation
-
ASCE, Reston, VA
-
AbouRizk, S., Manavazhi, M., and Dozzi, P. (1997). Analysis of productivity on a tunnel operation using computer simulation. Proc., Construction Congr. V, ASCE, Reston, VA.
-
(1997)
Proc., Construction Congr. v
-
-
Abourizk, S.1
Manavazhi, M.2
Dozzi, P.3
-
9
-
-
32944462702
-
Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews
-
DOI 10.1061/(ASCE)0733-9364(2006)132:3(291)
-
Agbulos, A., Mohamed, Y., Al-Hussein, M., AbouRizk, S., and Roesch, J. (2006). Application of lean concepts and simulation analysis to improve efficiency of drainage operations. J. Constr. Eng. Manage., 132 (3), 291-299. (Pubitemid 43260129)
-
(2006)
Journal of Construction Engineering and Management
, vol.132
, Issue.3
, pp. 291-299
-
-
Agbulos, A.1
Mohamed, Y.2
Al-Hussein, M.3
Abourizk, S.4
Roesch, J.5
-
10
-
-
84855771611
-
-
Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada
-
Al-Bataineh, M. (2009). Scenario-based planning for tunnelling construction. Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada.
-
(2009)
Scenario-based Planning for Tunnelling Construction
-
-
Al-Bataineh, M.1
-
11
-
-
0036926538
-
Optimal construction project planning
-
IEEE, Piscataway, NJ
-
Appleton, B., Patra, J., AbouRizk, S., and Mohamed, Y. (2002). Optimal construction project planning. Proc., Winter Simulation Conf., Vol. 2, IEEE, Piscataway, NJ, 1704-1708.
-
(2002)
Proc., Winter Simulation Conf.
, vol.2
, pp. 1704-1708
-
-
Appleton, B.1
Patra, J.2
Abourizk, S.3
Mohamed, Y.4
-
12
-
-
0032284096
-
Simulation of large precast operations
-
IEEE
-
Balbontin-Bravo, E. (1998). Simulation of large precast operations. Proc., Winter Simulation Conf., Vol. 2, IEEE, 1311-1317.
-
(1998)
Proc., Winter Simulation Conf.
, vol.2
, pp. 1311-1317
-
-
Balbontin-Bravo, E.1
-
13
-
-
0021610080
-
Microcomputer cost optimization of earth moving operation
-
Univ. of Waterloo, Waterloo, ON, Canada
-
Bernold, L. E., and Halpin, D. W. (1984). Microcomputer cost optimization of earth moving operation. Proc., 4th Int. Symp. on Organization and Mgmt. of Constr., Vol. 11, Univ. of Waterloo, Waterloo, ON, Canada
-
(1984)
Proc., 4th Int. Symp. on Organization and Mgmt. of Constr.
, vol.11
-
-
Bernold, L.E.1
Halpin, D.W.2
-
14
-
-
0020179770
-
Integrated project and process management
-
0733-9364
-
Dabbas, M. A. A., and Halpin, D. W. (1982). Integrated project and process management. J. Constr. Eng. Manage. 0733-9364, 108 (3), 361-374.
-
(1982)
J. Constr. Eng. Manage.
, vol.108
, Issue.3
, pp. 361-374
-
-
Dabbas, M.A.A.1
Halpin, D.W.2
-
15
-
-
69949095978
-
-
Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada
-
El-Ghandour, W. (2007). Integrated information-based construction simulation system. Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada.
-
(2007)
Integrated Information-based Construction Simulation System
-
-
El-Ghandour, W.1
-
16
-
-
77956834159
-
Selecting the best tunnel construction for the first stage of the SESS tunnel using simulation
-
Edmonton, AB, Canada
-
Er, K. C., Fernando, S., AbouRizk, S., and Ruwanpura, J. (2000). Selecting the best tunnel construction for the first stage of the SESS tunnel using simulation. 7th Annual Construction Res. Forum, Edmonton, AB, Canada
-
(2000)
7th Annual Construction Res. Forum
-
-
Er, K.C.1
Fernando, S.2
Abourizk, S.3
Ruwanpura, J.4
-
17
-
-
77956826477
-
-
M.Sc. thesis, Univ, of Alberta, Edmonton, AB, Canada
-
Ferrar, J. M. (2002). Development of a lean approach in simulation using surface works operations of road construction. M.Sc. thesis, Univ, of Alberta, Edmonton, AB, Canada.
-
(2002)
Development of A Lean Approach in Simulation Using Surface Works Operations of Road Construction
-
-
Ferrar, J.M.1
-
18
-
-
0342949301
-
-
Tech. Re No. 111, The Construction Institute, Stanford Univ., Stanford, CA
-
Gaarslev, A. (1969). Stochastic models to estimate the production material handling systems in the construction industry. Tech. Rep. No. 111, The Construction Institute, Stanford Univ., Stanford, CA.
-
(1969)
Stochastic Models to Estimate the Production Material Handling Systems in the Construction Industry
-
-
Gaarslev, A.1
-
19
-
-
0030421920
-
Building a special purpose simulation tool for earth moving operation
-
IEEE, Piscataway, NJ
-
Hajjar, D., and AbouRizk, S. (1996). Building a special purpose simulation tool for earth moving operation. Proc., Winter Simulation Conf., IEEE, Piscataway, NJ, 1313-1320.
-
(1996)
Proc., Winter Simulation Conf.
, pp. 1313-1320
-
-
Hajjar, D.1
Abourizk, S.2
-
20
-
-
0030421920
-
Building a special purpose simulation tool for earth moving operations
-
IEEE, Piscataway, NJ
-
Hajjar, D., and AbouRizk, S. M. (1999). Building a special purpose simulation tool for earth moving operations. Proc., Winter Simulation Conf., IEEE, Piscataway, NJ, 1313-1320.
-
(1999)
Proc., Winter Simulation Conf.
, pp. 1313-1320
-
-
Hajjar, D.1
Abourizk, S.M.2
-
21
-
-
0041304359
-
Unified modeling methodology for construction simulation
-
DOI 10.1061/(ASCE)0733-9364(2002)128:2(1)
-
Hajjar, D., and AbouRizk, S. (2002). Unified modeling methodology for construction simulation. J. Constr. Eng. Manage. 0733-9364, 128 (2), 174-185. 10.1061/(ASCE)0733-9364(2002)128:2(174) (Pubitemid 40265565)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.2
, pp. 174-185
-
-
Hajjar, D.1
AbouRizk, S.M.2
-
22
-
-
0010053548
-
-
Ph.D. dissertation, Dept. of Civil Engineering, Univ. of Illinois, Urbana-Champaign, IL
-
Halpin, D. W. (1973). An investigation of the use of simulation networks for modeling construction operations. Ph.D. dissertation, Dept. of Civil Engineering, Univ. of Illinois, Urbana-Champaign, IL.
-
(1973)
An Investigation of the Use of Simulation Networks for Modeling Construction Operations
-
-
Halpin, D.W.1
-
23
-
-
0006624519
-
-
Div. of Construction Engineering and Management, Purdue Univ., West Lafayette, IN
-
Halpin, D. W. (1990). Micro-CYCLONE User's Manual, Div. of Construction Engineering and Management, Purdue Univ., West Lafayette, IN.
-
(1990)
Micro-CYCLONE User's Manual
-
-
Halpin, D.W.1
-
25
-
-
1642559529
-
A construction process simulation web service
-
IEEE, Piscataway, NJ
-
Halpin, D. W., Jen, H., and Kim, J. (2003). A construction process simulation web service. Proc., Winter Simulation Conf., Vol. 2, IEEE, Piscataway, NJ, 1503-1509.
-
(2003)
Proc., Winter Simulation Conf.
, vol.2
, pp. 1503-1509
-
-
Halpin, D.W.1
Jen, H.2
Kim, J.3
-
26
-
-
77956297922
-
An integrated system to select, position, and simulate mobile cranes for complex industrial projects
-
ASCE, Reston, VA
-
Hermann, U., Hendi, A., Olearczyck, J., and Al-Hussein, M. (2010). An integrated system to select, position, and simulate mobile cranes for complex industrial projects. Proc., Construction Research Congress, ASCE, Reston, VA, 267-276.
-
(2010)
Proc., Construction Research Congress
, pp. 267-276
-
-
Hermann, U.1
Hendi, A.2
Olearczyck, J.3
Al-Hussein, M.4
-
27
-
-
0028137930
-
Visual construction operations simulation: The DISCO approach
-
Huang, R. Y., and Halpin, D. W. (1994). Visual construction operations simulation: The DISCO approach. Microcomput. Civ. Eng., 9 (3), 175-184.
-
(1994)
Microcomput. Civ. Eng.
, vol.9
, Issue.3
, pp. 175-184
-
-
Huang, R.Y.1
Halpin, D.W.2
-
29
-
-
0003656321
-
-
Dept. of Civil Engineering, University of Michigan, Ann Arbor, MI
-
Ioannou, P. G. (1989). UM-CYCLONE User's Guide, Dept. of Civil Engineering, University of Michigan, Ann Arbor, MI.
-
(1989)
UM-CYCLONE User's Guide
-
-
Ioannou, P.G.1
-
30
-
-
0006595666
-
-
Tech. Re No. 238, Dept. of Civ. Eng., Stanford Univ., Stanford, CA
-
Kalk, A. (1980). INSIGHT: Interactive simulation of construction operations using graphical techniques. Tech. Rep. No. 238, Dept. of Civ. Eng., Stanford Univ., Stanford, CA.
-
(1980)
INSIGHT: Interactive Simulation of Construction Operations Using Graphical Techniques
-
-
Kalk, A.1
-
31
-
-
1642440732
-
Validating complex construction simulation models using 3D visualization
-
DOI 10.1080/02329290290028507, PII YEA6LW6VY0YB4WKN
-
Kamat, V. R., and Martinez, J. C. (2003). Validating complex construction simulation models using 3D visualization. Syst. Anal. Model. Simul. 0232-9298, 43 (4), 455-467. 10.1080/02329290290028507 (Pubitemid 44112320)
-
(2003)
Systems Analysis Modelling Simulation
, vol.43
, Issue.4
, pp. 455-467
-
-
Kamat, V.R.1
Martinez, J.C.2
-
33
-
-
0020101864
-
Construction operation and microcomputers
-
0569-7948
-
Lluch, J., and Halpin, D. W. (1982). Construction operation and microcomputers. J. Constr. Div. 0569-7948, 108 (1), 129-145.
-
(1982)
J. Constr. Div.
, vol.108
, Issue.1
, pp. 129-145
-
-
Lluch, J.1
Halpin, D.W.2
-
34
-
-
0028744434
-
Simulation of learning development in repetitive construction
-
0733-9364, 10.1061/(ASCE)0733-9364(1994)120:4(753)
-
Lutz, J. D., Halpin, D. W., and Wilson, J. R. (1994). Simulation of learning development in repetitive construction. J. Constr. Eng. Manage. 0733-9364, 120 (4), 753-773. 10.1061/(ASCE)0733-9364(1994)120:4(753)
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 753-773
-
-
Lutz, J.D.1
Halpin, D.W.2
Wilson, J.R.3
-
35
-
-
0028741632
-
General purpose simulation with Stroboscope
-
IEEE, Piscataway, NJ
-
Martinez, J., and Ioannou, P. G. (1994). General purpose simulation with Stroboscope. Proc., Winter Simulation Conf., IEEE, Piscataway, NJ, 1159-1166.
-
(1994)
Proc., Winter Simulation Conf.
, pp. 1159-1166
-
-
Martinez, J.1
Ioannou, P.G.2
-
36
-
-
0031371933
-
State-based probabilistic scheduling using Stroboscope's CPM add-on
-
ASCE, Reston, VA
-
Martinez, J. C., and Ioannou, P. G. (1996). State-based probabilistic scheduling using Stroboscope's CPM add-on. Proc., Constr. Congr. V, ASCE, Reston, VA, 438-445.
-
(1996)
Proc., Constr. Congr. v
, pp. 438-445
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
37
-
-
0032677122
-
General-purpose systems for effective construction simulation
-
Martinez, J. C., and Ioannou, P. G. (1999). General-purpose systems for effective construction simulation. J. Constr. Eng. Manage., 125 (4), 265-276.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.4
, pp. 265-276
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
38
-
-
0027662666
-
Resource-oriented modeling and simulation in construction
-
0733-9364, 10.1061/(ASCE)0733-9364(1993)119:3(590)
-
McCahill, D. F., and Bernold, L. E. (1993). Resource-oriented modeling and simulation in construction. J. Constr. Eng. Manage. 0733-9364, 119 (3), 590-606. 10.1061/(ASCE)0733-9364(1993)119:3(590)
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.3
, pp. 590-606
-
-
McCahill, D.F.1
Bernold, L.E.2
-
39
-
-
34248995496
-
Simulation-based scheduling of module assembly yards: Case study
-
DOI 10.1108/09699980710744926
-
Mohamed, Y., Borrego, D., Francisco, L., Al-Hussein, M., and AbouRizk, S. (2007). Simulation-based scheduling of module assembly yards: Case study. Eng., Constr., Archit. Manage. 0969-9988, 14 (3), 293-311. 10.1108/09699980710744926 (Pubitemid 46790566)
-
(2007)
Engineering, Construction and Architectural Management
, vol.14
, Issue.3
, pp. 293-311
-
-
Mohamed, Y.1
Borrego, D.2
Francisco, L.3
Al-Hussein, M.4
Abourizk, S.5
Hermann, U.6
-
40
-
-
77956823282
-
-
North American Pipeline, Inc. (NAPI), . DRAXware, Inc., Edmonton, AB, Canada
-
North American Pipeline, Inc. (NAPI), (2008). Suncor firebag pipeline construction simulation. DRAXware, Inc., Edmonton, AB, Canada.
-
(2008)
Suncor Firebag Pipeline Construction Simulation
-
-
-
41
-
-
0343046793
-
Knowledge-based simulation of construction plans
-
ASCE, Reston, VA
-
Odeh, A. M., Tommelein, I. D., and Carr, R. I. (1992). Knowledge-based simulation of construction plans. Proc., 8th Conf. on Computing in Civil Engineering, ASCE, Reston, VA, 1042-1049.
-
(1992)
Proc., 8th Conf. on Computing in Civil Engineering
, pp. 1042-1049
-
-
Odeh, A.M.1
Tommelein, I.D.2
Carr, R.I.3
-
42
-
-
49749096092
-
Strategic-operational construction management: Hybrid system dynamics and discrete event approach
-
0733-9364, 10.1061/(ASCE)0733-9364(2008)134:9(701)
-
Pea-Mora, F., Han, S., Lee, S., and Park, M. (2008). Strategic- operational construction management: Hybrid system dynamics and discrete event approach. J. Constr. Eng. Manage. 0733-9364, 134 (9), 701-710. 10.1061/(ASCE)0733-9364(2008)134:9(701)
-
(2008)
J. Constr. Eng. Manage.
, vol.134
, Issue.9
, pp. 701-710
-
-
Pea-Mora, F.1
Han, S.2
Lee, S.3
Park, M.4
-
43
-
-
77956850012
-
-
Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada
-
Shahin, A. (2007). Simulation of cold weather construction. Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada.
-
(2007)
Simulation of Cold Weather Construction
-
-
Shahin, A.1
-
44
-
-
0032684768
-
Activity-based construction (ABC) modeling and simulation method
-
0733-9364, 10.1061/(ASCE)0733-9364(1999)125:5(354)
-
Shi, J. (1999). Activity-based construction (ABC) modeling and simulation method. J. Constr. Eng. Manage. 0733-9364, 125 (5), 354-360. 10.1061/(ASCE)0733-9364(1999)125:5(354)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 354-360
-
-
Shi, J.1
-
45
-
-
33747342090
-
-
Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada
-
Song, L. (2004). Productivity modeling for steel fabrication projects. Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada.
-
(2004)
Productivity Modeling for Steel Fabrication Projects
-
-
Song, L.1
-
46
-
-
69949090029
-
Integrated simulation-based scheduling for module assembly yard
-
ASCE Reston, VA
-
Taghaddos, H., AbouRizk, S. M., Mohamed, Y., and Hermann, R. (2009). Integrated simulation-based scheduling for module assembly yard. Proc., Construction Res. Congr., ASCE Reston, VA, 1270-1279.
-
(2009)
Proc., Construction Res. Congr.
, pp. 1270-1279
-
-
Taghaddos, H.1
Abourizk, S.M.2
Mohamed, Y.3
Hermann, R.4
-
47
-
-
77956303933
-
Simulation-based multiple heavy lift planning in industrial construction
-
ASCE, Reston, VA
-
Taghaddos, H., AbouRizk, S. M., Mohamed, Y., and Hermann, R. (2010). Simulation-based multiple heavy lift planning in industrial construction. Proc., Construction Res, Congr., ASCE, Reston, VA, 349-358.
-
(2010)
Proc., Construction Res, Congr.
, pp. 349-358
-
-
Taghaddos, H.1
Abourizk, S.M.2
Mohamed, Y.3
Hermann, R.4
-
48
-
-
0003880227
-
-
Tech. Re No. 26, Construction Institute, Stanford Univ., Stanford, CA
-
Teicholz, P. (1963). A simulation approach to the selection of construction equipment. Tech. Rep. No. 26, Construction Institute, Stanford Univ., Stanford, CA.
-
(1963)
A Simulation Approach to the Selection of Construction Equipment
-
-
Teicholz, P.1
-
49
-
-
0023108940
-
Simulation of tunneling operations
-
0733-9364, 10.1061/(ASCE)0733-9364(1987)113:4(554)
-
Touran, A., and Asai, T. (1987). Simulation of tunneling operations. J. Constr. Eng. Manage. 0733-9364, 113 (4), 554-568. 10.1061/(ASCE)0733-9364(1987) 113:4(554)
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.4
, pp. 554-568
-
-
Touran, A.1
Asai, T.2
-
50
-
-
60749129845
-
-
Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada
-
Van Tol, A. A. (2005). Agent embedded simulation modeling framework for construction engineering and management applications. Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada.
-
(2005)
Agent Embedded Simulation Modeling Framework for Construction Engineering and Management Applications
-
-
Van Tol, A.A.1
-
51
-
-
60749119651
-
-
Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada
-
Wang, P. (2006). Production-based large scale construction simulation modeling. Ph.D. thesis, Univ. of Alberta, Edmonton, AB, Canada.
-
(2006)
Production-based Large Scale Construction Simulation Modeling
-
-
Wang, P.1
-
52
-
-
33645019803
-
CAD-based integrated simulation environment
-
Canadian Society of Civil Engineers (CSCE), Montreal, PQ, Canada
-
Xu, J., and AbouRizk, S. (1999). CAD-based integrated simulation environment. 3rd Canadian Construction Specialty Conf., Canadian Society of Civil Engineers (CSCE), Montreal, PQ, Canada, 95-102.
-
(1999)
3rd Canadian Construction Specialty Conf.
, pp. 95-102
-
-
Xu, J.1
Abourizk, S.2
|