메뉴 건너뛰기




Volumn 17, Issue 6, 2008, Pages 670-681

Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization

Author keywords

Critical path method; Particle swarm optimization; Resource allocation; Scheduling

Indexed keywords

COMPUTER SOFTWARE; CONSTRAINED OPTIMIZATION; CONSTRUCTION INDUSTRY; DISCRETE EVENT SIMULATION; PARTICLE SWARM OPTIMIZATION (PSO); RESOURCE ALLOCATION;

EID: 41749098857     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2007.11.004     Document Type: Article
Times cited : (93)

References (23)
  • 3
    • 66949128268 scopus 로고    scopus 로고
    • Critics can't find the logic in many of today's CPM schedules
    • Korman R., and Daniels S.H. Critics can't find the logic in many of today's CPM schedules. ENR 250 20 (2003) 30-33
    • (2003) ENR , vol.250 , Issue.20 , pp. 30-33
    • Korman, R.1    Daniels, S.H.2
  • 4
    • 33745324306 scopus 로고    scopus 로고
    • Comparative study of university courses on critical-path method scheduling
    • Galloway P.D. Comparative study of university courses on critical-path method scheduling. Construction Engineering and Management 132 7 (2006) 712-722
    • (2006) Construction Engineering and Management , vol.132 , Issue.7 , pp. 712-722
    • Galloway, P.D.1
  • 5
    • 33745292984 scopus 로고    scopus 로고
    • Survey of the construction industry relative to the use of CPM scheduling for construction projects
    • Galloway P.D. Survey of the construction industry relative to the use of CPM scheduling for construction projects. Construction Engineering and Management 132 7 (2006) 697-711
    • (2006) Construction Engineering and Management , vol.132 , Issue.7 , pp. 697-711
    • Galloway, P.D.1
  • 8
    • 6344232286 scopus 로고    scopus 로고
    • Simplified discrete-event simulation approach for construction simulation
    • Lu M. Simplified discrete-event simulation approach for construction simulation. Construction Engineering and Management 129 5 (2003) 537-546
    • (2003) Construction Engineering and Management , vol.129 , Issue.5 , pp. 537-546
    • Lu, M.1
  • 9
    • 37249001774 scopus 로고    scopus 로고
    • Critical path scheduling under resource calendar constraints
    • Lu M., and Lam H.C. Critical path scheduling under resource calendar constraints. Construction Engineering and Management 134 1 (2008) 25-31
    • (2008) Construction Engineering and Management , vol.134 , Issue.1 , pp. 25-31
    • Lu, M.1    Lam, H.C.2
  • 11
    • 33749582268 scopus 로고    scopus 로고
    • Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA
    • Lu M., and Wong L.C. Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA. Automation in Construction 16 (2007) 86-95
    • (2007) Automation in Construction , vol.16 , pp. 86-95
    • Lu, M.1    Wong, L.C.2
  • 13
    • 17744393498 scopus 로고    scopus 로고
    • Modeling concurrent operational delays in construction activities with simplified discrete event simulation approach
    • Lu M., and Chan W.H. Modeling concurrent operational delays in construction activities with simplified discrete event simulation approach. Proceedings of Winter Simulation Conference 2004, Washington D.C. (2004) 1260-1267
    • (2004) Proceedings of Winter Simulation Conference 2004, Washington D.C. , pp. 1260-1267
    • Lu, M.1    Chan, W.H.2
  • 14
    • 32944474678 scopus 로고    scopus 로고
    • Particle swarm optimization for preemptive scheduling under resource-constraints
    • Zhang H., Li H., and Tam C.M. Particle swarm optimization for preemptive scheduling under resource-constraints. Construction Engineering and Management 132 3 (2006) 259-267
    • (2006) Construction Engineering and Management , vol.132 , Issue.3 , pp. 259-267
    • Zhang, H.1    Li, H.2    Tam, C.M.3
  • 15
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy T. Optimization of resource allocation and leveling using genetic algorithms. Construction Engineering and Management 125 3 (1999) 167-175
    • (1999) Construction Engineering and Management , vol.125 , Issue.3 , pp. 167-175
    • Hegazy, T.1
  • 16
    • 0034172005 scopus 로고    scopus 로고
    • Stochastic construction time-cost trade-off analysis
    • Feng C.W., Liu L., and Scott A.B. Stochastic construction time-cost trade-off analysis. Computing in Civil Engineering 14 2 (2000) 117-126
    • (2000) Computing in Civil Engineering , vol.14 , Issue.2 , pp. 117-126
    • Feng, C.W.1    Liu, L.2    Scott, A.B.3
  • 17
    • 0012234280 scopus 로고    scopus 로고
    • Production scheduling for precast plants using a flow shop sequencing model
    • Chan W.T., and Hu H. Production scheduling for precast plants using a flow shop sequencing model. Computing in Civil Engineering, 16 3 (2002) 165-174
    • (2002) Computing in Civil Engineering , vol.16 , Issue.3 , pp. 165-174
    • Chan, W.T.1    Hu, H.2
  • 18
    • 6344281398 scopus 로고    scopus 로고
    • Resource optimization using combined simulation and genetic algorithms
    • Hegazy T., and Kassab M. Resource optimization using combined simulation and genetic algorithms. Construction Engineering and Management 129 6 (2003) 698-705
    • (2003) Construction Engineering and Management , vol.129 , Issue.6 , pp. 698-705
    • Hegazy, T.1    Kassab, M.2
  • 20
    • 13244273704 scopus 로고    scopus 로고
    • Particle swarm optimization-based schemes for resource-constrained project scheduling
    • Zhang H., Li X., Li H., and Huang F. Particle swarm optimization-based schemes for resource-constrained project scheduling. Automation in Construction 14 (2006) 393-404
    • (2006) Automation in Construction , vol.14 , pp. 393-404
    • Zhang, H.1    Li, X.2    Li, H.3    Huang, F.4
  • 21
  • 22
    • 33745767770 scopus 로고    scopus 로고
    • A Particle Swarm Optimization-Based Approach to Tackling Simulation Optimization of Stochastic, Large-Scale and Complex Systems
    • Springer, Berlin
    • Lu M., Wu D.P., and Zhang J.P. A Particle Swarm Optimization-Based Approach to Tackling Simulation Optimization of Stochastic, Large-Scale and Complex Systems. Lecture Notes in Computer Science vol. 3930 (2006), Springer, Berlin 528-537
    • (2006) Lecture Notes in Computer Science , vol.3930 , pp. 528-537
    • Lu, M.1    Wu, D.P.2    Zhang, J.P.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.