-
3
-
-
66949128268
-
Critics can't find the logic in many of today's CPM schedules
-
Korman R., and Daniels S.H. Critics can't find the logic in many of today's CPM schedules. ENR 250 20 (2003) 30-33
-
(2003)
ENR
, vol.250
, Issue.20
, pp. 30-33
-
-
Korman, R.1
Daniels, S.H.2
-
4
-
-
33745324306
-
Comparative study of university courses on critical-path method scheduling
-
Galloway P.D. Comparative study of university courses on critical-path method scheduling. Construction Engineering and Management 132 7 (2006) 712-722
-
(2006)
Construction Engineering and Management
, vol.132
, Issue.7
, pp. 712-722
-
-
Galloway, P.D.1
-
5
-
-
33745292984
-
Survey of the construction industry relative to the use of CPM scheduling for construction projects
-
Galloway P.D. Survey of the construction industry relative to the use of CPM scheduling for construction projects. Construction Engineering and Management 132 7 (2006) 697-711
-
(2006)
Construction Engineering and Management
, vol.132
, Issue.7
, pp. 697-711
-
-
Galloway, P.D.1
-
8
-
-
6344232286
-
Simplified discrete-event simulation approach for construction simulation
-
Lu M. Simplified discrete-event simulation approach for construction simulation. Construction Engineering and Management 129 5 (2003) 537-546
-
(2003)
Construction Engineering and Management
, vol.129
, Issue.5
, pp. 537-546
-
-
Lu, M.1
-
9
-
-
37249001774
-
Critical path scheduling under resource calendar constraints
-
Lu M., and Lam H.C. Critical path scheduling under resource calendar constraints. Construction Engineering and Management 134 1 (2008) 25-31
-
(2008)
Construction Engineering and Management
, vol.134
, Issue.1
, pp. 25-31
-
-
Lu, M.1
Lam, H.C.2
-
11
-
-
33749582268
-
Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA
-
Lu M., and Wong L.C. Comparison of two simulation methodologies in modeling construction systems: Manufacturing-oriented PROMODEL vs. construction-oriented SDESA. Automation in Construction 16 (2007) 86-95
-
(2007)
Automation in Construction
, vol.16
, pp. 86-95
-
-
Lu, M.1
Wong, L.C.2
-
13
-
-
17744393498
-
Modeling concurrent operational delays in construction activities with simplified discrete event simulation approach
-
Lu M., and Chan W.H. Modeling concurrent operational delays in construction activities with simplified discrete event simulation approach. Proceedings of Winter Simulation Conference 2004, Washington D.C. (2004) 1260-1267
-
(2004)
Proceedings of Winter Simulation Conference 2004, Washington D.C.
, pp. 1260-1267
-
-
Lu, M.1
Chan, W.H.2
-
14
-
-
32944474678
-
Particle swarm optimization for preemptive scheduling under resource-constraints
-
Zhang H., Li H., and Tam C.M. Particle swarm optimization for preemptive scheduling under resource-constraints. Construction Engineering and Management 132 3 (2006) 259-267
-
(2006)
Construction Engineering and Management
, vol.132
, Issue.3
, pp. 259-267
-
-
Zhang, H.1
Li, H.2
Tam, C.M.3
-
15
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
Hegazy T. Optimization of resource allocation and leveling using genetic algorithms. Construction Engineering and Management 125 3 (1999) 167-175
-
(1999)
Construction Engineering and Management
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
16
-
-
0034172005
-
Stochastic construction time-cost trade-off analysis
-
Feng C.W., Liu L., and Scott A.B. Stochastic construction time-cost trade-off analysis. Computing in Civil Engineering 14 2 (2000) 117-126
-
(2000)
Computing in Civil Engineering
, vol.14
, Issue.2
, pp. 117-126
-
-
Feng, C.W.1
Liu, L.2
Scott, A.B.3
-
17
-
-
0012234280
-
Production scheduling for precast plants using a flow shop sequencing model
-
Chan W.T., and Hu H. Production scheduling for precast plants using a flow shop sequencing model. Computing in Civil Engineering, 16 3 (2002) 165-174
-
(2002)
Computing in Civil Engineering
, vol.16
, Issue.3
, pp. 165-174
-
-
Chan, W.T.1
Hu, H.2
-
18
-
-
6344281398
-
Resource optimization using combined simulation and genetic algorithms
-
Hegazy T., and Kassab M. Resource optimization using combined simulation and genetic algorithms. Construction Engineering and Management 129 6 (2003) 698-705
-
(2003)
Construction Engineering and Management
, vol.129
, Issue.6
, pp. 698-705
-
-
Hegazy, T.1
Kassab, M.2
-
20
-
-
13244273704
-
Particle swarm optimization-based schemes for resource-constrained project scheduling
-
Zhang H., Li X., Li H., and Huang F. Particle swarm optimization-based schemes for resource-constrained project scheduling. Automation in Construction 14 (2006) 393-404
-
(2006)
Automation in Construction
, vol.14
, pp. 393-404
-
-
Zhang, H.1
Li, X.2
Li, H.3
Huang, F.4
-
22
-
-
33745767770
-
A Particle Swarm Optimization-Based Approach to Tackling Simulation Optimization of Stochastic, Large-Scale and Complex Systems
-
Springer, Berlin
-
Lu M., Wu D.P., and Zhang J.P. A Particle Swarm Optimization-Based Approach to Tackling Simulation Optimization of Stochastic, Large-Scale and Complex Systems. Lecture Notes in Computer Science vol. 3930 (2006), Springer, Berlin 528-537
-
(2006)
Lecture Notes in Computer Science
, vol.3930
, pp. 528-537
-
-
Lu, M.1
Wu, D.P.2
Zhang, J.P.3
-
23
-
-
0034870045
-
Tracking and optimizing dynamic systems with particle swarms
-
Eberhart R.C., and Shi Y. Tracking and optimizing dynamic systems with particle swarms. Proceedings of the IEEE Conference on Evolutionary Computation, IEEE, Seoul, Korea (2001) 94-97
-
(2001)
Proceedings of the IEEE Conference on Evolutionary Computation, IEEE, Seoul, Korea
, pp. 94-97
-
-
Eberhart, R.C.1
Shi, Y.2
|