메뉴 건너뛰기




Volumn , Issue , 2010, Pages 369-378

State-based simulation mechanism for facilitating project schedule updating

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION PROCESS; CONSTRUCTION SIMULATION; INITIAL SCHEDULE; MANAGEMENT TOOL; MODELING APPROACH; PRODUCTION SYSTEM; PROJECT SCHEDULES; PROJECT SCHEDULING; SCHEDULE UPDATING; SIMULATION APPROACH; SIMULATION MECHANISMS; SIMULATION-BASED; STATE-BASED; WORK LOADS;

EID: 77956323515     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41109(373)37     Document Type: Conference Paper
Times cited : (6)

References (9)
  • 1
    • 0034430715 scopus 로고    scopus 로고
    • Simphony-an integrated environment for construction simulation
    • Orlando, FL, USA
    • AbouRizk, S., and Mohamed, Y. (2000). "Simphony-an integrated environment for construction simulation." Proceedings of the 2000 Winter Simulation Conference, Orlando, FL, USA, 2: 1907-1914.
    • (2000) Proceedings of the 2000 Winter Simulation Conference , vol.2 , pp. 1907-1914
    • Abourizk, S.1    Mohamed, Y.2
  • 2
    • 0000301687 scopus 로고    scopus 로고
    • Simulation-based scheduling with continuous activity relationships
    • ASCE
    • Chehayeb, N. N. and AbouRizk S. M. (1998). "Simulation-Based Scheduling with Continuous Activity Relationships." Journal of Construction Engineering & Management, ASCE, 124(2), 107-115.
    • (1998) Journal of Construction Engineering & Management , vol.124 , Issue.2 , pp. 107-115
    • Chehayeb, N.N.1    Abourizk, S.M.2
  • 4
    • 72849146910 scopus 로고    scopus 로고
    • A simulation-based tool for scheduling construction projects with repeating processes
    • CSCE, St. John's, Newfoundland and Labrador, ICS-200-10 -ICS-200-1101
    • Hu, D. and Mohamed, Y. (2009). "A simulation-based tool for scheduling construction projects with repeating processes." Proceeding of the CSCE 2009 Annual Conference, CSCE, St. John's, Newfoundland and Labrador, ICS-200-10 -ICS-200-1101
    • (2009) Proceeding of the CSCE 2009 Annual Conference
    • Hu, D.1    Mohamed, Y.2
  • 5
    • 6344232286 scopus 로고    scopus 로고
    • Simplified discrete-event simulation approach for construction simulation
    • ASCE
    • Lu, M. (2003). "Simplified Discrete-Event Simulation Approach for Construction Simulation." Journal of Construction Engineering and Management, ASCE, 129(5), 537-546.
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 537-546
    • Lu, M.1
  • 6
    • 34249794569 scopus 로고    scopus 로고
    • A hybrid approach for developing special purpose simulation tools
    • Mohamed, Y., and AbouRizk, S. M. (2006). "A hybrid approach for developing special purpose simulation tools." Canadian Journal of Civil Engineering, 33(12), 1505-1515
    • (2006) Canadian Journal of Civil Engineering , vol.33 , Issue.12 , pp. 1505-1515
    • Mohamed, Y.1    Abourizk, S.M.2
  • 8
    • 33747342143 scopus 로고    scopus 로고
    • Virtual shop model for experimental planning of steel fabrication projects
    • Song, L., and AbouRizk, S. M. (2006). "Virtual Shop Model for Experimental Planning of Steel Fabrication Projects." J.Comput.Civ.Eng., 20(5), 308-316.
    • (2006) J.Comput.Civ.Eng. , vol.20 , Issue.5 , pp. 308-316
    • Song, L.1    Abourizk, S.M.2
  • 9
    • 1642432959 scopus 로고    scopus 로고
    • Simulation-based methodology for project scheduling
    • Zhang, H., Tam, G. M., and Shi, J. J. (2002). "Simulation-based methodology for project scheduling." Constr.Manage.Econ., 20(8), 667-678.
    • (2002) Constr.Manage.Econ. , vol.20 , Issue.8 , pp. 667-678
    • Zhang, H.1    Tam, G.M.2    Shi, J.J.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.