-
1
-
-
0034430715
-
Simphony-an integrated environment for construction simulation
-
Orlando, FL, USA
-
AbouRizk, S., and Mohamed, Y. (2000). "Simphony-an integrated environment for construction simulation." Proceedings of the 2000 Winter Simulation Conference, Orlando, FL, USA, 2: 1907-1914.
-
(2000)
Proceedings of the 2000 Winter Simulation Conference
, vol.2
, pp. 1907-1914
-
-
Abourizk, S.1
Mohamed, Y.2
-
2
-
-
0000301687
-
Simulation-based scheduling with continuous activity relationships
-
ASCE
-
Chehayeb, N. N. and AbouRizk S. M. (1998). "Simulation-Based Scheduling with Continuous Activity Relationships." Journal of Construction Engineering & Management, ASCE, 124(2), 107-115.
-
(1998)
Journal of Construction Engineering & Management
, vol.124
, Issue.2
, pp. 107-115
-
-
Chehayeb, N.N.1
Abourizk, S.M.2
-
4
-
-
72849146910
-
A simulation-based tool for scheduling construction projects with repeating processes
-
CSCE, St. John's, Newfoundland and Labrador, ICS-200-10 -ICS-200-1101
-
Hu, D. and Mohamed, Y. (2009). "A simulation-based tool for scheduling construction projects with repeating processes." Proceeding of the CSCE 2009 Annual Conference, CSCE, St. John's, Newfoundland and Labrador, ICS-200-10 -ICS-200-1101
-
(2009)
Proceeding of the CSCE 2009 Annual Conference
-
-
Hu, D.1
Mohamed, Y.2
-
5
-
-
6344232286
-
Simplified discrete-event simulation approach for construction simulation
-
ASCE
-
Lu, M. (2003). "Simplified Discrete-Event Simulation Approach for Construction Simulation." Journal of Construction Engineering and Management, ASCE, 129(5), 537-546.
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.5
, pp. 537-546
-
-
Lu, M.1
-
6
-
-
34249794569
-
A hybrid approach for developing special purpose simulation tools
-
Mohamed, Y., and AbouRizk, S. M. (2006). "A hybrid approach for developing special purpose simulation tools." Canadian Journal of Civil Engineering, 33(12), 1505-1515
-
(2006)
Canadian Journal of Civil Engineering
, vol.33
, Issue.12
, pp. 1505-1515
-
-
Mohamed, Y.1
Abourizk, S.M.2
-
7
-
-
34248995496
-
Simulation-based scheduling of module assembly yards: Case study. engineering
-
Mohamed, Y., Borrego, D., Francisco, L., Al-Hussein, M., Abourizk, S., and Hermann, U. (2007). "Simulation-based scheduling of module assembly yards: Case study. Engineering." Construction and Architectural Management, 14(3), 293-311.
-
(2007)
Construction and Architectural Management
, vol.14
, Issue.3
, pp. 293-311
-
-
Mohamed, Y.1
Borrego, D.2
Francisco, L.3
Al-Hussein, M.4
Abourizk, S.5
Hermann, U.6
-
8
-
-
33747342143
-
Virtual shop model for experimental planning of steel fabrication projects
-
Song, L., and AbouRizk, S. M. (2006). "Virtual Shop Model for Experimental Planning of Steel Fabrication Projects." J.Comput.Civ.Eng., 20(5), 308-316.
-
(2006)
J.Comput.Civ.Eng.
, vol.20
, Issue.5
, pp. 308-316
-
-
Song, L.1
Abourizk, S.M.2
-
9
-
-
1642432959
-
Simulation-based methodology for project scheduling
-
Zhang, H., Tam, G. M., and Shi, J. J. (2002). "Simulation-based methodology for project scheduling." Constr.Manage.Econ., 20(8), 667-678.
-
(2002)
Constr.Manage.Econ.
, vol.20
, Issue.8
, pp. 667-678
-
-
Zhang, H.1
Tam, G.M.2
Shi, J.J.3
|