메뉴 건너뛰기




Volumn 28, Issue 1, 2014, Pages 50-65

Development of workspace conflict visualization system using 4D object of work schedule

Author keywords

4D CAD; BIM (Building Information Modeling); Bounding box; Schedule overlapping; Time space trade off; Workspace conflict

Indexed keywords

COMPUTER AIDED DESIGN; CONSTRUCTION INDUSTRY; ECONOMIC AND SOCIAL EFFECTS;

EID: 84893794692     PISSN: 14740346     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.aei.2013.12.001     Document Type: Article
Times cited : (109)

References (28)
  • 3
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction
    • B. Koo, and M. Fischer Feasibility study of 4D CAD in commercial construction J. Constr. Eng. Manage. 126 2000 251 260
    • (2000) J. Constr. Eng. Manage. , vol.126 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 5
    • 3142565144 scopus 로고    scopus 로고
    • 4D dynamic management for construction planning and resource utilization
    • H. Wang, J. Zhang, K. Chau, and M. Anson 4D dynamic management for construction planning and resource utilization Automat. Constr. 13 2004 575 589
    • (2004) Automat. Constr. , vol.13 , pp. 575-589
    • Wang, H.1    Zhang, J.2    Chau, K.3    Anson, M.4
  • 6
    • 78149283314 scopus 로고    scopus 로고
    • Development of methodology and virtual system for optimised simulation of road design data
    • L.S. Kang, H.S. Moon, N. Dawood, and M.S. Kang Development of methodology and virtual system for optimised simulation of road design data Automat. Constr. 19 2010 1000 1015
    • (2010) Automat. Constr. , vol.19 , pp. 1000-1015
    • Kang, L.S.1    Moon, H.S.2    Dawood, N.3    Kang, M.S.4
  • 7
    • 78049472053 scopus 로고    scopus 로고
    • Improved link system between schedule data and 3D object in 4D CAD system by using WBS code
    • L.S. Kang, H.S. Moon, S.Y. Park, C.H. Kim, and T.S. Lee Improved link system between schedule data and 3D object in 4D CAD system by using WBS code KSCE J. Civil Eng. 14 2010 803 814
    • (2010) KSCE J. Civil Eng. , vol.14 , pp. 803-814
    • Kang, L.S.1    Moon, H.S.2    Park, S.Y.3    Kim, C.H.4    Lee, T.S.5
  • 10
    • 33746778753 scopus 로고    scopus 로고
    • Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies
    • DOI 10.1111/j.1467-8667.2006.00454.x
    • N. Dawood, and Z. Mallasi Construction workspace planning: assignment and analysis utilizing 4D visualization technologies Comput. Aided Civil Infrastruct. Eng. 21 2006 498 513 (Pubitemid 44165263)
    • (2006) Computer-Aided Civil and Infrastructure Engineering , vol.21 , Issue.7 , pp. 498-513
    • Dawood, N.1    Mallasi, Z.2
  • 11
    • 0029470095 scopus 로고
    • Patterns of construction-space use in multistory buildings
    • D.R. Riley, and V.E. Sanvido Patterns of construction-space use in multistory buildings J. Constr. Eng. Manage. 121 1995 464 473
    • (1995) J. Constr. Eng. Manage. , vol.121 , pp. 464-473
    • Riley, D.R.1    Sanvido, V.E.2
  • 13
    • 0028401574 scopus 로고
    • Modeling work space to schedule repetitive floors in multistory buildings
    • W.Y. Thabet, and Y.J. Beliveau Modeling work space to schedule repetitive floors in multistory buildings J. Constr. Eng. Manage. 120 1994 96 116
    • (1994) J. Constr. Eng. Manage. , vol.120 , pp. 96-116
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 15
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of work space conflicts in building construction
    • S.J. Guo Identification and resolution of work space conflicts in building construction J. Constr. Eng. Manage. 128 2002 287 295
    • (2002) J. Constr. Eng. Manage. , vol.128 , pp. 287-295
    • Guo, S.J.1
  • 16
    • 33746364173 scopus 로고    scopus 로고
    • Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation
    • DOI 10.1016/j.autcon.2005.08.005, PII S092658050500124X
    • Z. Mallasi Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation Automat. Constr. 15 2006 640 655 (Pubitemid 44118734)
    • (2006) Automation in Construction , vol.15 , Issue.5 , pp. 640-655
    • Mallasi, Z.1
  • 17
    • 0041805006 scopus 로고    scopus 로고
    • Automated generation of work spaces required by construction activities
    • DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
    • B. Akinci, M. Fischer, and J. Kunz Automated generation of work spaces required by construction activities J. Constr. Eng. Manage. 128 2002 306 315 (Pubitemid 40265535)
    • (2002) Journal of Construction Engineering and Management , vol.128 , Issue.4 , pp. 306-315
    • Akinci, B.1    Fischer, M.2    Kunz, J.3
  • 19
    • 27444447204 scopus 로고    scopus 로고
    • Detection of spatio-temporal conflicts on a temporal 3D space system
    • DOI 10.1016/j.advengsoft.2005.03.025, PII S0965997805001304, Selected Papers from Civil-Comp 2003 and AICivil-Comp 2003
    • Y. Song, and D. Chua Detection of spatio-temporal conflicts on a temporal 3D space system Adv. Eng. Softw. 36 2005 814 826 (Pubitemid 41531143)
    • (2005) Advances in Engineering Software , vol.36 , Issue.11-12 , pp. 814-826
    • Song, Y.1    Chua, D.K.H.2
  • 21
    • 67651222422 scopus 로고    scopus 로고
    • Spatial and temporal exposure to safety hazards in construction
    • R. Sacks, O. Rozenfeld, and Y. Rosenfeld Spatial and temporal exposure to safety hazards in construction J. Constr. Eng. Manage. 135 2009 726 736
    • (2009) J. Constr. Eng. Manage. , vol.135 , pp. 726-736
    • Sacks, R.1    Rozenfeld, O.2    Rosenfeld, Y.3
  • 24
    • 84867883768 scopus 로고    scopus 로고
    • Construction workspace management: The development and application of a novel nD planning approach and tool
    • R. Chavada, N. Dawood, and M. Kassem Construction workspace management: the development and application of a novel nD planning approach and tool J. Inform. Technol. Constr. (ITcon) 17 2012 213 236
    • (2012) J. Inform. Technol. Constr. (ITcon) , vol.17 , pp. 213-236
    • Chavada, R.1    Dawood, N.2    Kassem, M.3
  • 26
    • 33846794387 scopus 로고    scopus 로고
    • Automated generation of workspace requirements of mobile crane operations to support conflict detection
    • DOI 10.1016/j.autcon.2006.05.007, PII S0926580506000379
    • K. Tantisevi, and B. Akinci Automated generation of workspace requirements of mobile crane operations to support conflict detection Automat. Constr. 16 2007 262 276 (Pubitemid 46205281)
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 262-276
    • Tantisevi, K.1    Akinci, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.