-
3
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
B. Koo, and M. Fischer Feasibility study of 4D CAD in commercial construction J. Constr. Eng. Manage. 126 2000 251 260
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
4
-
-
84893784635
-
Interactive 4D-CAD
-
J.V, P.C. (Eds.)
-
K. McKinney, J. Kim, M. Fischer, C. Howard, Interactive 4D-CAD, in: J.V, P.C. (Eds.) Proceedings of the Third Congress on Computing in Civil Engineering, ASCE, Anaheim, CA, June, Anaheim, CA, 1996, pp. 17-19.
-
(1996)
Proceedings of the Third Congress on Computing in Civil Engineering, ASCE, Anaheim, CA, June, Anaheim, CA
, pp. 17-19
-
-
McKinney, K.1
Kim, J.2
Fischer, M.3
Howard, C.4
-
5
-
-
3142565144
-
4D dynamic management for construction planning and resource utilization
-
H. Wang, J. Zhang, K. Chau, and M. Anson 4D dynamic management for construction planning and resource utilization Automat. Constr. 13 2004 575 589
-
(2004)
Automat. Constr.
, vol.13
, pp. 575-589
-
-
Wang, H.1
Zhang, J.2
Chau, K.3
Anson, M.4
-
6
-
-
78149283314
-
Development of methodology and virtual system for optimised simulation of road design data
-
L.S. Kang, H.S. Moon, N. Dawood, and M.S. Kang Development of methodology and virtual system for optimised simulation of road design data Automat. Constr. 19 2010 1000 1015
-
(2010)
Automat. Constr.
, vol.19
, pp. 1000-1015
-
-
Kang, L.S.1
Moon, H.S.2
Dawood, N.3
Kang, M.S.4
-
7
-
-
78049472053
-
Improved link system between schedule data and 3D object in 4D CAD system by using WBS code
-
L.S. Kang, H.S. Moon, S.Y. Park, C.H. Kim, and T.S. Lee Improved link system between schedule data and 3D object in 4D CAD system by using WBS code KSCE J. Civil Eng. 14 2010 803 814
-
(2010)
KSCE J. Civil Eng.
, vol.14
, pp. 803-814
-
-
Kang, L.S.1
Moon, H.S.2
Park, S.Y.3
Kim, C.H.4
Lee, T.S.5
-
8
-
-
77949499265
-
Improvement of Link Process in 4D CAD Viewer by Using Interface Board for Construction Project Management
-
L.S. Kang, H.S. Kim, H.S. Moon, C.H. Kim, Improvement of Link Process in 4D CAD Viewer by Using Interface Board for Construction Project Management, in: 2009 Third International Conference on Advanced Engineering Computing and Applications in Sciences, IEEE Computer Society, 2009, pp. 83-88.
-
(2009)
2009 Third International Conference on Advanced Engineering Computing and Applications in Sciences, IEEE Computer Society
, pp. 83-88
-
-
Kang, L.S.1
Kim, H.S.2
Moon, H.S.3
Kim, C.H.4
-
9
-
-
0043253368
-
Formalization and automation of time-space conflict analysis
-
DOI 10.1061/(ASCE)0887-3801(2002)16:2(124)
-
B. Akinci, M. Fischen, R. Levitt, and R. Carlson Formalization and automation of time-space conflict analysis J. Comput. Civil Eng. 16 2002 124 134 (Pubitemid 40475287)
-
(2002)
Journal of Computing in Civil Engineering
, vol.16
, Issue.2
, pp. 124-134
-
-
Akinci, B.1
Fischen, M.2
Levitt, R.3
Carlson, R.4
-
10
-
-
33746778753
-
Construction workspace planning: Assignment and analysis utilizing 4D visualization technologies
-
DOI 10.1111/j.1467-8667.2006.00454.x
-
N. Dawood, and Z. Mallasi Construction workspace planning: assignment and analysis utilizing 4D visualization technologies Comput. Aided Civil Infrastruct. Eng. 21 2006 498 513 (Pubitemid 44165263)
-
(2006)
Computer-Aided Civil and Infrastructure Engineering
, vol.21
, Issue.7
, pp. 498-513
-
-
Dawood, N.1
Mallasi, Z.2
-
11
-
-
0029470095
-
Patterns of construction-space use in multistory buildings
-
D.R. Riley, and V.E. Sanvido Patterns of construction-space use in multistory buildings J. Constr. Eng. Manage. 121 1995 464 473
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
13
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
W.Y. Thabet, and Y.J. Beliveau Modeling work space to schedule repetitive floors in multistory buildings J. Constr. Eng. Manage. 120 1994 96 116
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
15
-
-
2342430993
-
Identification and resolution of work space conflicts in building construction
-
S.J. Guo Identification and resolution of work space conflicts in building construction J. Constr. Eng. Manage. 128 2002 287 295
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, pp. 287-295
-
-
Guo, S.J.1
-
16
-
-
33746364173
-
Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation
-
DOI 10.1016/j.autcon.2005.08.005, PII S092658050500124X
-
Z. Mallasi Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation Automat. Constr. 15 2006 640 655 (Pubitemid 44118734)
-
(2006)
Automation in Construction
, vol.15
, Issue.5
, pp. 640-655
-
-
Mallasi, Z.1
-
17
-
-
0041805006
-
Automated generation of work spaces required by construction activities
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(306)
-
B. Akinci, M. Fischer, and J. Kunz Automated generation of work spaces required by construction activities J. Constr. Eng. Manage. 128 2002 306 315 (Pubitemid 40265535)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
18
-
-
3142750829
-
Representing work spaces generically in construction method models
-
DOI 10.1061/(ASCE)0733-9364(2002)128:4(296)
-
B. Akinci, M. Fischer, J. Kunz, and R. Levitt Representing work spaces generically in construction method models J. Constr. Eng. Manage. 128 2002 296 305 (Pubitemid 40265534)
-
(2002)
Journal of Construction Engineering and Management
, vol.128
, Issue.4
, pp. 296-305
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
Levitt, R.4
-
19
-
-
27444447204
-
Detection of spatio-temporal conflicts on a temporal 3D space system
-
DOI 10.1016/j.advengsoft.2005.03.025, PII S0965997805001304, Selected Papers from Civil-Comp 2003 and AICivil-Comp 2003
-
Y. Song, and D. Chua Detection of spatio-temporal conflicts on a temporal 3D space system Adv. Eng. Softw. 36 2005 814 826 (Pubitemid 41531143)
-
(2005)
Advances in Engineering Software
, vol.36
, Issue.11-12
, pp. 814-826
-
-
Song, Y.1
Chua, D.K.H.2
-
21
-
-
67651222422
-
Spatial and temporal exposure to safety hazards in construction
-
R. Sacks, O. Rozenfeld, and Y. Rosenfeld Spatial and temporal exposure to safety hazards in construction J. Constr. Eng. Manage. 135 2009 726 736
-
(2009)
J. Constr. Eng. Manage.
, vol.135
, pp. 726-736
-
-
Sacks, R.1
Rozenfeld, O.2
Rosenfeld, Y.3
-
24
-
-
84867883768
-
Construction workspace management: The development and application of a novel nD planning approach and tool
-
R. Chavada, N. Dawood, and M. Kassem Construction workspace management: the development and application of a novel nD planning approach and tool J. Inform. Technol. Constr. (ITcon) 17 2012 213 236
-
(2012)
J. Inform. Technol. Constr. (ITcon)
, vol.17
, pp. 213-236
-
-
Chavada, R.1
Dawood, N.2
Kassem, M.3
-
25
-
-
0005390052
-
-
Dept. of Arch. Engrg., Pennsylvania State University., University Park, Pa, USA
-
D.R. Riley, Modeling the Space Behavior of Construction Activities, Dept. of Arch. Engrg., Pennsylvania State University., University Park, Pa, USA, 1994.
-
(1994)
Modeling the Space Behavior of Construction Activities
-
-
Riley, D.R.1
-
26
-
-
33846794387
-
Automated generation of workspace requirements of mobile crane operations to support conflict detection
-
DOI 10.1016/j.autcon.2006.05.007, PII S0926580506000379
-
K. Tantisevi, and B. Akinci Automated generation of workspace requirements of mobile crane operations to support conflict detection Automat. Constr. 16 2007 262 276 (Pubitemid 46205281)
-
(2007)
Automation in Construction
, vol.16
, Issue.3
, pp. 262-276
-
-
Tantisevi, K.1
Akinci, B.2
|