-
1
-
-
0031635301
-
Time-space conflict analysis based on 4D production models
-
ASCE, Reston, Va.
-
Akinci, B., and Fischer, M. (1998). "Time-space conflict analysis based on 4D production models." Proc., Int. Computing Congress, ASCE, Reston, Va., 342-353.
-
(1998)
Proc., Int. Computing Congress
, pp. 342-353
-
-
Akinci, B.1
Fischer, M.2
-
2
-
-
0001867629
-
A proactive approach for reducing non-value adding activities due to time-space conflicts
-
Akinci, B., Fischer, M., and Zabelle, T. (1998). "A proactive approach for reducing non-value adding activities due to time-space conflicts." Proc., 8th Annual Conf. of the Int. Group for Lean Construction, 1-16.
-
(1998)
Proc., 8th Annual Conf. of the Int. Group for Lean Construction
, pp. 1-16
-
-
Akinci, B.1
Fischer, M.2
Zabelle, T.3
-
3
-
-
5244248406
-
ArcSite: Enhanced GIS for construction site layout
-
Cheng, M. Y., and O'Connor, J. T. (1996). "ArcSite: Enhanced GIS for construction site layout." J. Constr. Eng. Manage., 122(4), 329-336.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.4
, pp. 329-336
-
-
Cheng, M.Y.1
O'Connor, J.T.2
-
4
-
-
0033156961
-
EvoSite: Evolution-based model for site layout planning
-
Hegazy, T., and Elbeltagi, E. (1999). "EvoSite: Evolution-based model for site layout planning." J. Comput. Civ. Eng., 13(3), 198-206.
-
(1999)
J. Comput. Civ. Eng.
, vol.13
, Issue.3
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
5
-
-
0032187321
-
Site-level facilities layout using genetic algorithms
-
Li, H., and Love, P. E. D. (1998). "Site-level facilities layout using genetic algorithms." J. Comput. Civ. Eng., 12(4), 227-231.
-
(1998)
J. Comput. Civ. Eng.
, vol.12
, Issue.4
, pp. 227-231
-
-
Li, H.1
Love, P.E.D.2
-
6
-
-
0000504207
-
An interactive planning environment for critical operations
-
Lin, K. L., and Haas, C. T. (1996). "An interactive planning environment for critical operations." J. Constr. Eng. Manage., 122(3), 212-222.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.3
, pp. 212-222
-
-
Lin, K.L.1
Haas, C.T.2
-
7
-
-
0031618065
-
4D space planning specification development for construction work spaces
-
ASCE, Reston, Va.
-
Riley, D. R. (1998). "4D space planning specification development for construction work spaces." Proc., Int. Computing Congress, ASCE, Reston, Va., 354-363.
-
(1998)
Proc., Int. Computing Congress
, pp. 354-363
-
-
Riley, D.R.1
-
8
-
-
0029470095
-
Patterns of construction-space use in multistory buildings
-
Riley, D. R., and Sanvido, V. E. (1995). "Patterns of construction-space use in multistory buildings." J. Constr. Eng. Manage., 121(4), 464-473.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
9
-
-
0002299336
-
Space planning method for multistory building construction
-
Riley, D. R., and Sanvido, V. E. (1997). "Space planning method for multistory building construction." J. Constr. Eng. Manage., 123(2), 171-180.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.2
, pp. 171-180
-
-
Riley, D.R.1
Sanvido, V.E.2
-
10
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
Thabet, W. Y., and Beliveau, Y. J. (1994). "Modeling work space to schedule repetitive floors in multistory buildings." J. Constr. Eng. Manage., 120(1), 96-116.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
11
-
-
0027607458
-
Interactive dynamic layout planning
-
Tommelein, I. D., and Zouein, P. P. (1993). "Interactive dynamic layout planning." J. Constr. Eng. Manage., 119(2), 266-287.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 266-287
-
-
Tommelein, I.D.1
Zouein, P.P.2
-
12
-
-
0030108424
-
OPSALC: A computer-integrated operation planning system for autonomous land fill compaction
-
Tserng, H. P., Veeramani, D., Kunigahalli, R., and Russel, J. S. (1996). "OPSALC: A computer-integrated operation planning system for autonomous land fill compaction." J. of Automation in Constr., 5(1), 39-50.
-
(1996)
J. of Automation in Constr.
, vol.5
, Issue.1
, pp. 39-50
-
-
Tserng, H.P.1
Veeramani, D.2
Kunigahalli, R.3
Russel, J.S.4
-
13
-
-
45749131570
-
Routing large vehicles on industrial construction sites
-
Varghese, K., and O'Connor, J. T. (1995). "Routing large vehicles on industrial construction sites." J. Constr. Eng. Manage., 121(1), 1-12.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.1
, pp. 1-12
-
-
Varghese, K.1
O'Connor, J.T.2
-
14
-
-
0029344681
-
Construction-site layout using annealed neural network
-
Yeh, I. (1995). "Construction-site layout using annealed neural network." J. Comput. Civ. Eng., 9(3), 201-208.
-
(1995)
J. Comput. Civ. Eng.
, vol.9
, Issue.3
, pp. 201-208
-
-
Yeh, I.1
-
15
-
-
0033313625
-
Dynamic layout planning using a hybrid incremental solution method
-
Zouein, P. P., and Tommelein, I. D. (1999). "Dynamic layout planning using a hybrid incremental solution method." J. Constr. Eng. Manage., 125(6), 400-408.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 400-408
-
-
Zouein, P.P.1
Tommelein, I.D.2
|