Automated generation of work spaces required by construction activities
-
Akinci, B., Fischer, M., and Kunz, J. (2002a). " Automated generation of work spaces required by construction activities.. " J. Constr. Eng. Manage., 128 (4), 306-315.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.4
, pp. 306-315
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
-
2
-
-
3142750829
-
Representing work spaces generically in construction method models
-
Akinci, B., Fischer, M., Kunz, J., and Levitt, R. (2002b). " Representing work spaces generically in construction method models.. " J. Constr. Eng. Manage., 128 (4), 296-305.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.4
, pp. 296-305
-
-
Akinci, B.1
Fischer, M.2
Kunz, J.3
Levitt, R.4
-
3
-
-
11644288742
-
Shielding production: Essential step in production control
-
Ballard, G., and Howell, G. (1998). " Shielding production: Essential step in production control.. " J. Constr. Eng. Manage., 124 (1), 11-17.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 11-17
-
-
Ballard, G.1
Howell, G.2
-
5
-
-
5244248406
-
ArcSite: Enhanced GIS for construction site layout
-
Cheng, M. Y., and O'Connor, J. T. (1996). " ArcSite: Enhanced GIS for construction site layout.. " J. Constr. Eng. Manage., 122 (4), 329-336.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.4
, pp. 329-336
-
-
Cheng, M.Y.1
O'Connor, J.T.2
-
6
-
-
0011519209
-
-
RIBA, London.
-
Crawford, M., Cann, J., and O'Leary, R. (1997). Uniclass-Unified classification for the construction industry, RIBA, London.
-
(1997)
Uniclass-Unified Classification for the Construction Industry
-
-
Crawford, M.1
Cann, J.2
O'Leary, R.3
-
7
-
-
1442287457
-
-
Univ. of Teesside, a VIRCON project report.
-
Dawood, N., Sriprasert, E., and Mallasi, Z. (2003a). Data capture and database development, Univ. of Teesside, a VIRCON project report.
-
(2003)
Data Capture and Database Development
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
-
8
-
-
33646195642
-
-
Univ. of Teesside, a VIRCON project report.
-
Dawood, N., Sriprasert, E., and Mallasi, Z. (2003b). Visualisation development: Whole building visualisation, Univ. of Teesside, a VIRCON project report.
-
(2003)
Visualisation Development: Whole Building Visualisation
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
-
9
-
-
33646179157
-
-
Univ. of Teesside, a VIRCON project report.
-
Dawood, N., Sriprasert, E., and Mallasi, Z. (2003c). User evaluation, Univ. of Teesside, a VIRCON project report.
-
(2003)
User Evaluation
-
-
Dawood, N.1
Sriprasert, E.2
Mallasi, Z.3
-
10
-
-
0035501643
-
Schedule-dependent evolution of site layout planning
-
Elbeltagi, E., Hegazy, T., Hosny, A. H., and Eldosouky, A. (2001). " Schedule-dependent evolution of site layout planning.. " Constr. Manage. Econom., 19 (7), 689-697.
-
(2001)
Constr. Manage. Econom.
, vol.19
, Issue.7
, pp. 689-697
-
-
Elbeltagi, E.1
Hegazy, T.2
Hosny, A.H.3
Eldosouky, A.4
-
11
-
-
33646192855
-
-
143.
-
Fischer, M., and Kam, C. (2002). PM4D Final Rep., Stanford, CIFE Technical Report, 143.
-
(2002)
-
-
Fischer, M.1
Kam, C.2
-
12
-
-
0003926816
-
-
North River, Great Barrington.
-
Goldratt, E. M. (1997). Critical chain, North River, Great Barrington.
-
(1997)
Critical Chain
-
-
Goldratt, E.M.1
-
13
-
-
2342430993
-
Identification and resolution of work space conflicts in building construction
-
Guo, S.-Y. (2002). " Identification and resolution of work space conflicts in building construction.. " J. Constr. Eng. Manage., 128 (4), 287-295.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.4
, pp. 287-295
-
-
Guo, S.-Y.1
-
15
-
-
0004029585
-
-
Chartered Institute of Building, Ascot, U.K.
-
Horner, R. M. W., and Talhouni, B. T. (1995). Effects of accelerated working, delays and disruption on labour productivity, Chartered Institute of Building, Ascot, U.K.
-
(1995)
Effects of Accelerated Working, Delays and Disruption on Labour Productivity
-
-
Horner, R.M.W.1
Talhouni, B.T.2
-
16
-
-
0035131721
-
VIRCON: Interactive system for teaching construction management
-
Jaafari, A., Manivong, K. K., and Chaaya, M. (2001). " VIRCON: Interactive system for teaching construction management.. " J. Constr. Eng. Manage., 127 (1), 66-75.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.1
, pp. 66-75
-
-
Jaafari, A.1
Manivong, K.K.2
Chaaya, M.3
-
17
-
-
1442336404
-
-
Univ. College London, a VIRCON project report.
-
Kelsey, J., Winch, G., and Penn, A. (2001). Understanding the project planning process: Requirements capture for the virtual construction site, Bartlett Research Paper 15, Univ. College London, a VIRCON project report.
-
(2001)
Understanding the Project Planning Process: Requirements Capture for the Virtual Construction Site
-
-
Kelsey, J.1
Winch, G.2
Penn, A.3
-
18
-
-
0034227635
-
Feasibility study of 4D CAD in commercial construction
-
Koo, B., and Fischer, M. (2000). " Feasibility study of 4D CAD in commercial construction.. " J. Constr. Eng. Manage., 126 (4), 251-260.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 251-260
-
-
Koo, B.1
Fischer, M.2
-
19
-
-
4344695708
-
Genetic algorithms for construction site layout in project planning
-
Mawdesley, M. J., Al-jibouri, S. H., and Yang, H. (2002). " Genetic algorithms for construction site layout in project planning.. " J. Constr. Eng. Manage., 128 (5), 418-426.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.5
, pp. 418-426
-
-
Mawdesley, M.J.1
Al-Jibouri, S.H.2
Yang, H.3
-
21
-
-
33646201062
-
-
UMIST, a VIRCON project report.
-
North, S., and Winch, G. M. (2002). Analyzing critical space and time: VIRCON task 5 and 8 Rep., UMIST, a VIRCON project report.
-
(2002)
-
-
North, S.1
Winch, G.M.2
-
22
-
-
33646201269
-
-
UMIST, a VIRCON project report.
-
North, S., and Winch, G. M. (2003). System integration: VIRCON task 9 Rep., UMIST, a VIRCON project report.
-
(2003)
-
-
North, S.1
Winch, G.M.2
-
23
-
-
0032593162
-
VR-based planning of construction site activities
-
Retik, A., and Shapira, A. (1999). " VR-based planning of construction site activities.. " Autom. Constr., 8, 671-680.
-
(1999)
Autom. Constr.
, vol.8
, pp. 671-680
-
-
Retik, A.1
Shapira, A.2
-
24
-
-
0029470095
-
Patterns of construction-space use in multistory buildings
-
Riley, D. R., and Sanvido, V. E. (1995). " Patterns of construction-space use in multistory buildings.. " J. Constr. Eng. Manage., 121 (4), 464-473.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.4
, pp. 464-473
-
-
Riley, D.R.1
Sanvido, V.E.2
-
25
-
-
0002299336
-
Space planning method for multistory building construction
-
Riley, D. R., and Sanvido, V. E. (1997). " Space planning method for multistory building construction.. " J. Constr. Eng. Manage., 123 (2), 171-180.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.2
, pp. 171-180
-
-
Riley, D.R.1
Sanvido, V.E.2
-
26
-
-
2342435265
-
Site layout planning using nonstructural fuzzy decision support system
-
Tam, C. M., Tong, T. K. L., Leung, A. W. T., and Chiu, G. W. C. (2002). " Site layout planning using nonstructural fuzzy decision support system.. " J. Constr. Eng. Manage., 128 (3), 220-231.
-
(2002)
J. Constr. Eng. Manage.
, vol.128
, Issue.3
, pp. 220-231
-
-
Tam, C.M.1
Tong, T.K.L.2
Leung, A.W.T.3
Chiu, G.W.C.4
-
27
-
-
33646203344
-
A simulation tool for multi-perspective site layout analysis
-
Z.Turk and R.Scherer, eds., Portoroz/Slovenia, Balkema, Rotterdam, The Netherlands
-
Tawfik, H., Fernando, T., and Aspin, R. A. (2002). " A simulation tool for multi-perspective site layout analysis.. " eWork and eBusiness in Architecture, Engineering and Construction, Proc., 4th European Conf. on Product and Process Modelling in the Building and Related Industries (ECPPM 2002), Z. Turk, and, R. Scherer, eds., Portoroz/Slovenia, Balkema, Rotterdam, The Netherlands, 193-197.
-
(2002)
EWork and EBusiness in Architecture, Engineering and Construction, Proc., 4th European Conf. on Product and Process Modelling in the Building and Related Industries (ECPPM 2002)
, pp. 193-197
-
-
Tawfik, H.1
Fernando, T.2
Aspin, R.A.3
-
28
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
Thabet, W. Y., and Beliveau, Y. J. (1994). " Modeling work space to schedule repetitive floors in multistory buildings.. " J. Constr. Eng. Manage., 120 (1), 96-116.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
29
-
-
0342515142
-
-
9019, Pennsylvania Transportation Institute, Pennsylvania State Univ.
-
Thomas, H. R., Jr., and Smith, G. R. (1990). " Loss of construction labor productivity due to inefficiencies and disruptions: The weight of expert opinion.. " PTI Rep. No. 9019, Pennsylvania Transportation Institute, Pennsylvania State Univ.
-
(1990)
Loss of Construction Labor Productivity Due to Inefficiencies and Disruptions: The Weight of Expert Opinion
-
-
Thomas Jr., H.R.1
Smith, G.R.2
-
30
-
-
0026021591
-
SightPlan experiments: Alternative strategies for site layout design
-
Tommelein, I. D., Levitt, R. E., Hayes-Roth, B., and Confrey, T. (1991). " SightPlan experiments: Alternative strategies for site layout design.. " J. Comput. Civ. Eng., 5 (1), 42-63.
-
(1991)
J. Comput. Civ. Eng.
, vol.5
, Issue.1
, pp. 42-63
-
-
Tommelein, I.D.1
Levitt, R.E.2
Hayes-Roth, B.3
Confrey, T.4
-
32
-
-
12444290959
-
What do construction project planners do?
-
Winch, G. M., and Kelsey, J. K. (2005). " What do construction project planners do? " Int. J. Proj. Manage., 23 (2), 141-149.
-
(2005)
Int. J. Proj. Manage.
, vol.23
, Issue.2
, pp. 141-149
-
-
Winch, G.M.1
Kelsey, J.K.2
-
33
-
-
2342444431
-
Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
-
Zouein, P. P., Harmanani, H., and Hajar, A. (2002). " Genetic algorithm for solving site layout problem with unequal-size and constrained facilities.. " J. Comput. Civ. Eng., 16 (2), 143-151.
-
(2002)
J. Comput. Civ. Eng.
, vol.16
, Issue.2
, pp. 143-151
-
-
Zouein, P.P.1
Harmanani, H.2
Hajar, A.3
-
34
-
-
0033313625
-
Dynamic layout planning using a hybrid incremental solution method
-
Zouein, P. P., and Tommelein, I. D. (1999). " Dynamic layout planning using a hybrid incremental solution method.. " J. Constr. Eng. Manage., 125 (6), 400-408.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 400-408
-
-
Zouein, P.P.1
Tommelein, I.D.2
|