Critical space analysis

Author keywords

Construction management; Critical path method; Scheduling; Workspace

Indexed keywords

CIVIL ENGINEERING; CRITICAL PATH ANALYSIS; DECISION SUPPORT SYSTEMS; PROBLEM SOLVING; PROJECT MANAGEMENT; SCHEDULING;

EID: 33646196837     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2006)132:5(473)     Document Type: Article
Times cited : (64)

References (34)
  • 1
    • 0041805006 scopus 로고    scopus 로고
    • Automated generation of work spaces required by construction activities
    • Akinci, B., Fischer, M., and Kunz, J. (2002a). " Automated generation of work spaces required by construction activities.. " J. Constr. Eng. Manage., 128 (4), 306-315.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 306-315
    • Akinci, B.1    Fischer, M.2    Kunz, J.3
  • 2
    • 3142750829 scopus 로고    scopus 로고
    • Representing work spaces generically in construction method models
    • Akinci, B., Fischer, M., Kunz, J., and Levitt, R. (2002b). " Representing work spaces generically in construction method models.. " J. Constr. Eng. Manage., 128 (4), 296-305.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 296-305
    • Akinci, B.1    Fischer, M.2    Kunz, J.3    Levitt, R.4
  • 3
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G. (1998). " Shielding production: Essential step in production control.. " J. Constr. Eng. Manage., 124 (1), 11-17.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 5
    • 5244248406 scopus 로고    scopus 로고
    • ArcSite: Enhanced GIS for construction site layout
    • Cheng, M. Y., and O'Connor, J. T. (1996). " ArcSite: Enhanced GIS for construction site layout.. " J. Constr. Eng. Manage., 122 (4), 329-336.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.4 , pp. 329-336
    • Cheng, M.Y.1    O'Connor, J.T.2
  • 11
    • 33646192855 scopus 로고    scopus 로고
    • 143.
    • Fischer, M., and Kam, C. (2002). PM4D Final Rep., Stanford, CIFE Technical Report, 143.
    • (2002)
    • Fischer, M.1    Kam, C.2
  • 12
    • 0003926816 scopus 로고    scopus 로고
    • North River, Great Barrington.
    • Goldratt, E. M. (1997). Critical chain, North River, Great Barrington.
    • (1997) Critical Chain
    • Goldratt, E.M.1
  • 13
    • 2342430993 scopus 로고    scopus 로고
    • Identification and resolution of work space conflicts in building construction
    • Guo, S.-Y. (2002). " Identification and resolution of work space conflicts in building construction.. " J. Constr. Eng. Manage., 128 (4), 287-295.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.4 , pp. 287-295
    • Guo, S.-Y.1
  • 16
    • 0035131721 scopus 로고    scopus 로고
    • VIRCON: Interactive system for teaching construction management
    • Jaafari, A., Manivong, K. K., and Chaaya, M. (2001). " VIRCON: Interactive system for teaching construction management.. " J. Constr. Eng. Manage., 127 (1), 66-75.
    • (2001) J. Constr. Eng. Manage. , vol.127 , Issue.1 , pp. 66-75
    • Jaafari, A.1    Manivong, K.K.2    Chaaya, M.3
  • 18
    • 0034227635 scopus 로고    scopus 로고
    • Feasibility study of 4D CAD in commercial construction
    • Koo, B., and Fischer, M. (2000). " Feasibility study of 4D CAD in commercial construction.. " J. Constr. Eng. Manage., 126 (4), 251-260.
    • (2000) J. Constr. Eng. Manage. , vol.126 , Issue.4 , pp. 251-260
    • Koo, B.1    Fischer, M.2
  • 19
    • 4344695708 scopus 로고    scopus 로고
    • Genetic algorithms for construction site layout in project planning
    • Mawdesley, M. J., Al-jibouri, S. H., and Yang, H. (2002). " Genetic algorithms for construction site layout in project planning.. " J. Constr. Eng. Manage., 128 (5), 418-426.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.5 , pp. 418-426
    • Mawdesley, M.J.1    Al-Jibouri, S.H.2    Yang, H.3
  • 21
    • 33646201062 scopus 로고    scopus 로고
    • UMIST, a VIRCON project report.
    • North, S., and Winch, G. M. (2002). Analyzing critical space and time: VIRCON task 5 and 8 Rep., UMIST, a VIRCON project report.
    • (2002)
    • North, S.1    Winch, G.M.2
  • 22
    • 33646201269 scopus 로고    scopus 로고
    • UMIST, a VIRCON project report.
    • North, S., and Winch, G. M. (2003). System integration: VIRCON task 9 Rep., UMIST, a VIRCON project report.
    • (2003)
    • North, S.1    Winch, G.M.2
  • 23
    • 0032593162 scopus 로고    scopus 로고
    • VR-based planning of construction site activities
    • Retik, A., and Shapira, A. (1999). " VR-based planning of construction site activities.. " Autom. Constr., 8, 671-680.
    • (1999) Autom. Constr. , vol.8 , pp. 671-680
    • Retik, A.1    Shapira, A.2
  • 24
    • 0029470095 scopus 로고
    • Patterns of construction-space use in multistory buildings
    • Riley, D. R., and Sanvido, V. E. (1995). " Patterns of construction-space use in multistory buildings.. " J. Constr. Eng. Manage., 121 (4), 464-473.
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.4 , pp. 464-473
    • Riley, D.R.1    Sanvido, V.E.2
  • 25
    • 0002299336 scopus 로고    scopus 로고
    • Space planning method for multistory building construction
    • Riley, D. R., and Sanvido, V. E. (1997). " Space planning method for multistory building construction.. " J. Constr. Eng. Manage., 123 (2), 171-180.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.2 , pp. 171-180
    • Riley, D.R.1    Sanvido, V.E.2
  • 26
    • 2342435265 scopus 로고    scopus 로고
    • Site layout planning using nonstructural fuzzy decision support system
    • Tam, C. M., Tong, T. K. L., Leung, A. W. T., and Chiu, G. W. C. (2002). " Site layout planning using nonstructural fuzzy decision support system.. " J. Constr. Eng. Manage., 128 (3), 220-231.
    • (2002) J. Constr. Eng. Manage. , vol.128 , Issue.3 , pp. 220-231
    • Tam, C.M.1    Tong, T.K.L.2    Leung, A.W.T.3    Chiu, G.W.C.4
  • 28
    • 0028401574 scopus 로고
    • Modeling work space to schedule repetitive floors in multistory buildings
    • Thabet, W. Y., and Beliveau, Y. J. (1994). " Modeling work space to schedule repetitive floors in multistory buildings.. " J. Constr. Eng. Manage., 120 (1), 96-116.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 96-116
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 30
    • 0026021591 scopus 로고
    • SightPlan experiments: Alternative strategies for site layout design
    • Tommelein, I. D., Levitt, R. E., Hayes-Roth, B., and Confrey, T. (1991). " SightPlan experiments: Alternative strategies for site layout design.. " J. Comput. Civ. Eng., 5 (1), 42-63.
    • (1991) J. Comput. Civ. Eng. , vol.5 , Issue.1 , pp. 42-63
    • Tommelein, I.D.1    Levitt, R.E.2    Hayes-Roth, B.3    Confrey, T.4
  • 32
    • 12444290959 scopus 로고    scopus 로고
    • What do construction project planners do?
    • Winch, G. M., and Kelsey, J. K. (2005). " What do construction project planners do? " Int. J. Proj. Manage., 23 (2), 141-149.
    • (2005) Int. J. Proj. Manage. , vol.23 , Issue.2 , pp. 141-149
    • Winch, G.M.1    Kelsey, J.K.2
  • 33
    • 2342444431 scopus 로고    scopus 로고
    • Genetic algorithm for solving site layout problem with unequal-size and constrained facilities
    • Zouein, P. P., Harmanani, H., and Hajar, A. (2002). " Genetic algorithm for solving site layout problem with unequal-size and constrained facilities.. " J. Comput. Civ. Eng., 16 (2), 143-151.
    • (2002) J. Comput. Civ. Eng. , vol.16 , Issue.2 , pp. 143-151
    • Zouein, P.P.1    Harmanani, H.2    Hajar, A.3
  • 34
    • 0033313625 scopus 로고    scopus 로고
    • Dynamic layout planning using a hybrid incremental solution method
    • Zouein, P. P., and Tommelein, I. D. (1999). " Dynamic layout planning using a hybrid incremental solution method.. " J. Constr. Eng. Manage., 125 (6), 400-408.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 400-408
    • Zouein, P.P.1    Tommelein, I.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.