메뉴 건너뛰기




Volumn 128, Issue 4, 2002, Pages 296-305

Representing work spaces generically in construction method models

Author keywords

Construction management; Construction methods; Scheduling; Workspace

Indexed keywords

CONSTRUCTION MANAGEMENT; CONSTRUCTION METHODS; WALL PANELS; WORKSPACE;

EID: 3142750829     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:4(296)     Document Type: Article
Times cited : (81)

References (45)
  • 1
    • 0004099797 scopus 로고    scopus 로고
    • PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
    • Aalami, F. (1998). "Using method models to generate 4D production models." PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
    • (1998) Using Method Models to Generate 4D Production Models
    • Aalami, F.1
  • 3
    • 0031635301 scopus 로고    scopus 로고
    • Time-space conflict analysis based on 4D production models
    • Reston, Va.
    • Akinci, B., and Fischer, M. (1998). "Time-space conflict analysis based on 4D production models." Conf. on Computing in Civil Engineering, ASCE, Reston, Va., 342-353.
    • (1998) Conf. on Computing in Civil Engineering, ASCE , pp. 342-353
    • Akinci, B.1    Fischer, M.2
  • 4
    • 0011128725 scopus 로고    scopus 로고
    • An automated approach for accounting for spaces required by construction activities
    • Reston, Va.
    • Akinci, B., and Fischer, M. (2000a). "An automated approach for accounting for spaces required by construction activities." Construction Congress VI, ASCE, Reston, Va., 1-10.
    • (2000) Construction Congress VI, ASCE , pp. 1-10
    • Akinci, B.1    Fischer, M.2
  • 5
    • 0034588228 scopus 로고    scopus 로고
    • 4D WorkPlanner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts
    • Akinci, B., and Fischer, M. (2000b). "4D WorkPlanner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts." Proc., 8th ICCBE, 740-747.
    • (2000) Proc., 8th ICCBE , pp. 740-747
    • Akinci, B.1    Fischer, M.2
  • 6
    • 0001867629 scopus 로고    scopus 로고
    • A proactive approach for reducing non value adding activities due to time-space conflicts
    • Akinci, B., Fischer, M., and Zabelle, T. (1998). "A proactive approach for reducing non value adding activities due to time-space conflicts." IGLC-6, 1-18.
    • (1998) IGLC-6 , pp. 1-18
    • Akinci, B.1    Fischer, M.2    Zabelle, T.3
  • 7
    • 0020849266 scopus 로고
    • Maintaining knowledge about temporal intervals
    • Allen, J. (1983). "Maintaining knowledge about temporal intervals." Commun. ACM, 26(11), 832-843.
    • (1983) Commun. ACM , vol.26 , Issue.11 , pp. 832-843
    • Allen, J.1
  • 9
    • 0029714192 scopus 로고    scopus 로고
    • Adaptation of a layout design system to a new domain: Construction site layouts
    • ASCE, New York
    • Choi, B., and Flemming, U. (1996). "Adaptation of a layout design system to a new domain: Construction site layouts." Conf. on Computing in Civil Engineering, ASCE, New York, 711-717.
    • (1996) Conf. on Computing in Civil Engineering , pp. 711-717
    • Choi, B.1    Flemming, U.2
  • 10
    • 0011153905 scopus 로고    scopus 로고
    • Space scheduling using flow analysis
    • International Group for Lean Construction
    • Choo, H. Y., and Tommelein, I. (1999). "Space scheduling using flow analysis." Proc., IGLC-7, International Group for Lean Construction, 299-311.
    • (1999) Proc., IGLC-7 , pp. 299-311
    • Choo, H.Y.1    Tommelein, I.2
  • 12
    • 0031223442 scopus 로고    scopus 로고
    • Qualitative representation of positional information
    • Clementini, E., Di Felice, P., and Hernandez, D. (1997). "Qualitative representation of positional information." Artif. Intel., 95, 317-356.
    • (1997) Artif. Intel. , vol.95 , pp. 317-356
    • Clementini, E.1    Di Felice, P.2    Hernandez, D.3
  • 13
    • 84974449619 scopus 로고
    • OARPLAN: Generating project plans by reasoning about objects, actions and resources
    • Darwiche, A., Levitt, R., and Hayes-Roth, B. (1988). "OARPLAN: Generating project plans by reasoning about objects, actions and resources." AI EDAM, 2(3), 169-181.
    • (1988) AI EDAM , vol.2 , Issue.3 , pp. 169-181
    • Darwiche, A.1    Levitt, R.2    Hayes-Roth, B.3
  • 15
  • 17
    • 13944257025 scopus 로고    scopus 로고
    • Representation of construction methods in total project systems
    • ASCE, Reston, Va.
    • Froese, T., and Rankin, J. (1998). "Representation of construction methods in total project systems." Int. Congress on Computing in Civil Engineering, ASCE, Reston, Va., 395-406.
    • (1998) Int. Congress on Computing in Civil Engineering , pp. 395-406
    • Froese, T.1    Rankin, J.2
  • 19
    • 0033156961 scopus 로고    scopus 로고
    • EvoSite: Evolution-based model for site layout planning
    • Hegazy, T., and Elbeltagi, E. (1999). "EvoSite: Evolution-based model for site layout planning." J. Comput. Civ. Eng., 13(3), 198-206.
    • (1999) J. Comput. Civ. Eng. , vol.13 , Issue.3 , pp. 198-206
    • Hegazy, T.1    Elbeltagi, E.2
  • 21
    • 13944279584 scopus 로고
    • An integrated facility construction process model
    • CIC Research Program, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
    • Hetrick, M., and Khayyal, S. A. (1987). "An integrated facility construction process model." Tech. Rep. No. 5, CIC Research Program, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
    • (1987) Tech. Rep. No. 5 , vol.5
    • Hetrick, M.1    Khayyal, S.A.2
  • 23
    • 13944254784 scopus 로고    scopus 로고
    • Industry foundation classes 2.0
    • Washington, D.C.
    • Industry Alliance for Interoperability (IAI). (1998). "Industry foundation classes 2.0." Specifications volumes 1-4, Washington, D.C.
    • (1998) Specifications Volumes 1-4
  • 24
    • 0028517808 scopus 로고
    • MDA planner: Interactive planning tool using product models and construction methods
    • Jägbeck, A. (1994). "MDA planner: Interactive planning tool using product models and construction methods." J. Comput. Civ. Eng., 8(4), 536-554.
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.4 , pp. 536-554
    • Jägbeck, A.1
  • 26
    • 10044292559 scopus 로고    scopus 로고
    • Neat vs. scruffy: A survey of computational models for spatial expressions
    • P. Olivier and K.-P. Gapp, eds., Kluwer, Dordrecht, The Netherlands
    • Mukerjee, A. (1998). "Neat vs. scruffy: A survey of computational models for spatial expressions." Computational representation and processing of spatial expressions, P. Olivier and K.-P. Gapp, eds., Kluwer, Dordrecht, The Netherlands, (http://www.cs.albany.edu/~amit/review.html).
    • (1998) Computational Representation and Processing of Spatial Expressions
    • Mukerjee, A.1
  • 28
    • 13944273815 scopus 로고    scopus 로고
    • Importance of site conditions and capacity allocation for construction cost and performances: A case study
    • O'Brien, W., Fischer, M., and Akinci, B. (1997). "Importance of site conditions and capacity allocation for construction cost and performances: A case study." Int. Conf. on Lean Construction, 77-89.
    • (1997) Int. Conf. on Lean Construction , pp. 77-89
    • O'Brien, W.1    Fischer, M.2    Akinci, B.3
  • 30
  • 31
    • 0005390052 scopus 로고
    • PhD thesis, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
    • Riley, D. (1994). "Modeling the space behavior of construction activities." PhD thesis, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
    • (1994) Modeling the Space Behavior of Construction Activities
    • Riley, D.1
  • 33
    • 0031362303 scopus 로고    scopus 로고
    • Space planning for mechanical, electrical, plumbing and fire protection trades in multistory building construction
    • New York
    • Riley, D., and Sanvido, V. (1997). "Space planning for mechanical, electrical, plumbing and fire protection trades in multistory building construction." 5th ASCE Construction Congress, New York, 102-109.
    • (1997) 5th ASCE Construction Congress , pp. 102-109
    • Riley, D.1    Sanvido, V.2
  • 35
    • 0032684768 scopus 로고    scopus 로고
    • Activity-based construction (ABC) modeling and simulation method
    • Shi, J. (1999). "Activity-based construction (ABC) modeling and simulation method." J. Constr. Eng. Manage., 125(5), 354-360.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.5 , pp. 354-360
    • Shi, J.1
  • 36
    • 0003119697 scopus 로고    scopus 로고
    • Resource-based modeling for construction simulation
    • Shi, J., and AbouRizk, S. (1997). "Resource-based modeling for construction simulation." J. Constr. Eng. Manage., 123(1), 26-33.
    • (1997) J. Constr. Eng. Manage. , vol.123 , Issue.1 , pp. 26-33
    • Shi, J.1    Abourizk, S.2
  • 37
    • 0030195306 scopus 로고    scopus 로고
    • Object-oriented model for integrating construction product and process information
    • Stumpf, A., Ganeshan, R., Chin, S., and Liu, L. (1996). "Object-oriented model for integrating construction product and process information." J. Comput. Civ. Eng., 10(3), 204-212.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.3 , pp. 204-212
    • Stumpf, A.1    Ganeshan, R.2    Chin, S.3    Liu, L.4
  • 38
    • 0028401574 scopus 로고
    • Modeling work space to schedule repetitive floors in multistory buildings
    • Thabet, W., and Beliveau, Y. (1994). "Modeling work space to schedule repetitive floors in multistory buildings." J. Constr. Eng. Manage., 120(1), 96-116.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 96-116
    • Thabet, W.1    Beliveau, Y.2
  • 39
    • 0028396033 scopus 로고
    • Forecasting labor productivity using factor model
    • Thomas, H. R., and Sakarcan, A. S. (1994). "Forecasting labor productivity using factor model." J. Constr. Eng. Manage., 120(1), 228-239.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.1 , pp. 228-239
    • Thomas, H.R.1    Sakarcan, A.S.2
  • 40
    • 0027607458 scopus 로고
    • Interactive dynamic layout planning
    • Tommelein, I., and Zouein, P. (1993). "Interactive dynamic layout planning." J. Constr. Eng. Manage., 119(2), 266-287.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.2 , pp. 266-287
    • Tommelein, I.1    Zouein, P.2
  • 41
    • 0028732526 scopus 로고
    • Assembly of simulation networks using designs, plans, and methods
    • Tommelein, I. D., Carr, R. I., and Odeh, A. M. (1994). "Assembly of simulation networks using designs, plans, and methods." J. Constr. Eng. Manage., 120(4), 796-815.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 796-815
    • Tommelein, I.D.1    Carr, R.I.2    Odeh, A.M.3
  • 42
    • 0026914052 scopus 로고
    • Site layout modeling: How can artificial intelligence help?
    • Tommelein, I. D., Levitt, R. E., and Hayes-Roth, B. (1992). "Site layout modeling: How can artificial intelligence help?" J. Constr. Eng. Manage., 118(3), 594-611.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.3 , pp. 594-611
    • Tommelein, I.D.1    Levitt, R.E.2    Hayes-Roth, B.3
  • 43
  • 44
    • 0033313625 scopus 로고    scopus 로고
    • Dynamic layout planning using hybrid incremental solution method
    • Zouein, P., and Tommelein, I. (1999). "Dynamic layout planning using hybrid incremental solution method." J. Constr. Eng. Manage., 125(6), 400-408.
    • (1999) J. Constr. Eng. Manage. , vol.125 , Issue.6 , pp. 400-408
    • Zouein, P.1    Tommelein, I.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.