-
1
-
-
0004099797
-
-
PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
Aalami, F. (1998). "Using method models to generate 4D production models." PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
(1998)
Using Method Models to Generate 4D Production Models
-
-
Aalami, F.1
-
2
-
-
13944260893
-
-
PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
Akinci, B. (2000). "Automatic generation of work spaces and analysis of time-space conflicts at construction sites." PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
(2000)
Automatic Generation of Work Spaces and Analysis of Time-space Conflicts at Construction Sites
-
-
Akinci, B.1
-
3
-
-
0031635301
-
Time-space conflict analysis based on 4D production models
-
Reston, Va.
-
Akinci, B., and Fischer, M. (1998). "Time-space conflict analysis based on 4D production models." Conf. on Computing in Civil Engineering, ASCE, Reston, Va., 342-353.
-
(1998)
Conf. on Computing in Civil Engineering, ASCE
, pp. 342-353
-
-
Akinci, B.1
Fischer, M.2
-
4
-
-
0011128725
-
An automated approach for accounting for spaces required by construction activities
-
Reston, Va.
-
Akinci, B., and Fischer, M. (2000a). "An automated approach for accounting for spaces required by construction activities." Construction Congress VI, ASCE, Reston, Va., 1-10.
-
(2000)
Construction Congress VI, ASCE
, pp. 1-10
-
-
Akinci, B.1
Fischer, M.2
-
5
-
-
0034588228
-
4D WorkPlanner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts
-
Akinci, B., and Fischer, M. (2000b). "4D WorkPlanner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts." Proc., 8th ICCBE, 740-747.
-
(2000)
Proc., 8th ICCBE
, pp. 740-747
-
-
Akinci, B.1
Fischer, M.2
-
6
-
-
0001867629
-
A proactive approach for reducing non value adding activities due to time-space conflicts
-
Akinci, B., Fischer, M., and Zabelle, T. (1998). "A proactive approach for reducing non value adding activities due to time-space conflicts." IGLC-6, 1-18.
-
(1998)
IGLC-6
, pp. 1-18
-
-
Akinci, B.1
Fischer, M.2
Zabelle, T.3
-
7
-
-
0020849266
-
Maintaining knowledge about temporal intervals
-
Allen, J. (1983). "Maintaining knowledge about temporal intervals." Commun. ACM, 26(11), 832-843.
-
(1983)
Commun. ACM
, vol.26
, Issue.11
, pp. 832-843
-
-
Allen, J.1
-
9
-
-
0029714192
-
Adaptation of a layout design system to a new domain: Construction site layouts
-
ASCE, New York
-
Choi, B., and Flemming, U. (1996). "Adaptation of a layout design system to a new domain: Construction site layouts." Conf. on Computing in Civil Engineering, ASCE, New York, 711-717.
-
(1996)
Conf. on Computing in Civil Engineering
, pp. 711-717
-
-
Choi, B.1
Flemming, U.2
-
10
-
-
0011153905
-
Space scheduling using flow analysis
-
International Group for Lean Construction
-
Choo, H. Y., and Tommelein, I. (1999). "Space scheduling using flow analysis." Proc., IGLC-7, International Group for Lean Construction, 299-311.
-
(1999)
Proc., IGLC-7
, pp. 299-311
-
-
Choo, H.Y.1
Tommelein, I.2
-
11
-
-
5944224517
-
Reference space for spatial inference in text understanding
-
C. Freksa, C. Habel, and K. Wender, eds., Springer, Berlin
-
Claus, B., et al. (1998). "Reference space for spatial inference in text understanding." Spatial cognition: An interdisciplinary approach to representing and processing spatial knowledge, C. Freksa, C. Habel, and K. Wender, eds., Springer, Berlin, 241-266.
-
(1998)
Spatial Cognition: An Interdisciplinary Approach to Representing and Processing Spatial Knowledge
, pp. 241-266
-
-
Claus, B.1
-
12
-
-
0031223442
-
Qualitative representation of positional information
-
Clementini, E., Di Felice, P., and Hernandez, D. (1997). "Qualitative representation of positional information." Artif. Intel., 95, 317-356.
-
(1997)
Artif. Intel.
, vol.95
, pp. 317-356
-
-
Clementini, E.1
Di Felice, P.2
Hernandez, D.3
-
13
-
-
84974449619
-
OARPLAN: Generating project plans by reasoning about objects, actions and resources
-
Darwiche, A., Levitt, R., and Hayes-Roth, B. (1988). "OARPLAN: Generating project plans by reasoning about objects, actions and resources." AI EDAM, 2(3), 169-181.
-
(1988)
AI EDAM
, vol.2
, Issue.3
, pp. 169-181
-
-
Darwiche, A.1
Levitt, R.2
Hayes-Roth, B.3
-
14
-
-
0026277578
-
Point-set topological spatial relations
-
Egenhofer, M., and Franzosa, R. (1991). "Point-set topological spatial relations." Int. J. Geographical Information Systems, 5(2), 161-174.
-
(1991)
Int. J. Geographical Information Systems
, vol.5
, Issue.2
, pp. 161-174
-
-
Egenhofer, M.1
Franzosa, R.2
-
15
-
-
0003602802
-
-
Addison-Wesley, Reading, Mass.
-
Fowler, M., and Scott, K. (1999). UML distilled, Addison-Wesley, Reading, Mass.
-
(1999)
UML Distilled
-
-
Fowler, M.1
Scott, K.2
-
16
-
-
13944274567
-
-
Springer, Berlin
-
Freksa, C., Habel, C., and Wender, K. (1998). Spatial cognition: An interdisciplinary approach to representing and processing spatial knowledge, Springer, Berlin.
-
(1998)
Spatial Cognition: An Interdisciplinary Approach to Representing and Processing Spatial Knowledge
-
-
Freksa, C.1
Habel, C.2
Wender, K.3
-
17
-
-
13944257025
-
Representation of construction methods in total project systems
-
ASCE, Reston, Va.
-
Froese, T., and Rankin, J. (1998). "Representation of construction methods in total project systems." Int. Congress on Computing in Civil Engineering, ASCE, Reston, Va., 395-406.
-
(1998)
Int. Congress on Computing in Civil Engineering
, pp. 395-406
-
-
Froese, T.1
Rankin, J.2
-
19
-
-
0033156961
-
EvoSite: Evolution-based model for site layout planning
-
Hegazy, T., and Elbeltagi, E. (1999). "EvoSite: Evolution-based model for site layout planning." J. Comput. Civ. Eng., 13(3), 198-206.
-
(1999)
J. Comput. Civ. Eng.
, vol.13
, Issue.3
, pp. 198-206
-
-
Hegazy, T.1
Elbeltagi, E.2
-
21
-
-
13944279584
-
An integrated facility construction process model
-
CIC Research Program, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
Hetrick, M., and Khayyal, S. A. (1987). "An integrated facility construction process model." Tech. Rep. No. 5, CIC Research Program, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
(1987)
Tech. Rep. No. 5
, vol.5
-
-
Hetrick, M.1
Khayyal, S.A.2
-
23
-
-
13944254784
-
Industry foundation classes 2.0
-
Washington, D.C.
-
Industry Alliance for Interoperability (IAI). (1998). "Industry foundation classes 2.0." Specifications volumes 1-4, Washington, D.C.
-
(1998)
Specifications Volumes 1-4
-
-
-
24
-
-
0028517808
-
MDA planner: Interactive planning tool using product models and construction methods
-
Jägbeck, A. (1994). "MDA planner: Interactive planning tool using product models and construction methods." J. Comput. Civ. Eng., 8(4), 536-554.
-
(1994)
J. Comput. Civ. Eng.
, vol.8
, Issue.4
, pp. 536-554
-
-
Jägbeck, A.1
-
25
-
-
0004007948
-
-
PhD thesis, Dept. of Civil and Environmental Engineering, Univ. of Michigan, Ann Arbor, Mich.
-
Martinez, J. (1996). "STROBOSCOPE: State and resource based simulation of construction processes." PhD thesis, Dept. of Civil and Environmental Engineering, Univ. of Michigan, Ann Arbor, Mich., (http://strobos.ce.vt.edu/).
-
(1996)
STROBOSCOPE: State and Resource Based Simulation of Construction Processes
-
-
Martinez, J.1
-
26
-
-
10044292559
-
Neat vs. scruffy: A survey of computational models for spatial expressions
-
P. Olivier and K.-P. Gapp, eds., Kluwer, Dordrecht, The Netherlands
-
Mukerjee, A. (1998). "Neat vs. scruffy: A survey of computational models for spatial expressions." Computational representation and processing of spatial expressions, P. Olivier and K.-P. Gapp, eds., Kluwer, Dordrecht, The Netherlands, (http://www.cs.albany.edu/~amit/review.html).
-
(1998)
Computational Representation and Processing of Spatial Expressions
-
-
Mukerjee, A.1
-
27
-
-
0003892654
-
-
PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
O'Brien, W. (1998). "Capacity costing approaches for construction supply-chain management." PhD thesis, Dept. of Civil and Environmental Engineering, Stanford Univ., Stanford, Calif.
-
(1998)
Capacity Costing Approaches for Construction Supply-chain Management
-
-
O'Brien, W.1
-
28
-
-
13944273815
-
Importance of site conditions and capacity allocation for construction cost and performances: A case study
-
O'Brien, W., Fischer, M., and Akinci, B. (1997). "Importance of site conditions and capacity allocation for construction cost and performances: A case study." Int. Conf. on Lean Construction, 77-89.
-
(1997)
Int. Conf. on Lean Construction
, pp. 77-89
-
-
O'Brien, W.1
Fischer, M.2
Akinci, B.3
-
29
-
-
0004158431
-
-
McGraw-Hill, New York
-
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction, McGraw-Hill, New York.
-
(1989)
Productivity Improvement in Construction
-
-
Oglesby, C.H.1
Parker, H.W.2
Howell, G.A.3
-
30
-
-
0003251087
-
Analysis of working space congestion from scheduling data
-
Morgantown, W.Va.
-
Rad, P. (1980). "Analysis of working space congestion from scheduling data." AACE Transactions, American Association of Cost Engineers, Morgantown, W.Va., F4.1-F4.5.
-
(1980)
AACE Transactions, American Association of Cost Engineers
-
-
Rad, P.1
-
31
-
-
0005390052
-
-
PhD thesis, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
Riley, D. (1994). "Modeling the space behavior of construction activities." PhD thesis, Dept. of Architectural Engineering, Pennsylvania State Univ., University Park, Pa.
-
(1994)
Modeling the Space Behavior of Construction Activities
-
-
Riley, D.1
-
32
-
-
0031618065
-
4D space planning specification development for construction work spaces
-
Riley, D. (1998). "4D space planning specification development for construction work spaces." Int. Comp. Congress on Computing in Civil Engineering, ASCE, Reston, Va., 354-363.
-
(1998)
Int. Comp. Congress on Computing in Civil Engineering, ASCE, Reston, Va.
, pp. 354-363
-
-
Riley, D.1
-
33
-
-
0031362303
-
Space planning for mechanical, electrical, plumbing and fire protection trades in multistory building construction
-
New York
-
Riley, D., and Sanvido, V. (1997). "Space planning for mechanical, electrical, plumbing and fire protection trades in multistory building construction." 5th ASCE Construction Congress, New York, 102-109.
-
(1997)
5th ASCE Construction Congress
, pp. 102-109
-
-
Riley, D.1
Sanvido, V.2
-
34
-
-
1642299923
-
-
PhD thesis, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
Sanvido, V. (1984). "Designing productivity management and control systems for construction projects." PhD thesis, Dept. of Civil Engineering, Stanford Univ., Stanford, Calif.
-
(1984)
Designing Productivity Management and Control Systems for Construction Projects
-
-
Sanvido, V.1
-
35
-
-
0032684768
-
Activity-based construction (ABC) modeling and simulation method
-
Shi, J. (1999). "Activity-based construction (ABC) modeling and simulation method." J. Constr. Eng. Manage., 125(5), 354-360.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.5
, pp. 354-360
-
-
Shi, J.1
-
36
-
-
0003119697
-
Resource-based modeling for construction simulation
-
Shi, J., and AbouRizk, S. (1997). "Resource-based modeling for construction simulation." J. Constr. Eng. Manage., 123(1), 26-33.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.1
, pp. 26-33
-
-
Shi, J.1
Abourizk, S.2
-
37
-
-
0030195306
-
Object-oriented model for integrating construction product and process information
-
Stumpf, A., Ganeshan, R., Chin, S., and Liu, L. (1996). "Object-oriented model for integrating construction product and process information." J. Comput. Civ. Eng., 10(3), 204-212.
-
(1996)
J. Comput. Civ. Eng.
, vol.10
, Issue.3
, pp. 204-212
-
-
Stumpf, A.1
Ganeshan, R.2
Chin, S.3
Liu, L.4
-
38
-
-
0028401574
-
Modeling work space to schedule repetitive floors in multistory buildings
-
Thabet, W., and Beliveau, Y. (1994). "Modeling work space to schedule repetitive floors in multistory buildings." J. Constr. Eng. Manage., 120(1), 96-116.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 96-116
-
-
Thabet, W.1
Beliveau, Y.2
-
39
-
-
0028396033
-
Forecasting labor productivity using factor model
-
Thomas, H. R., and Sakarcan, A. S. (1994). "Forecasting labor productivity using factor model." J. Constr. Eng. Manage., 120(1), 228-239.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.1
, pp. 228-239
-
-
Thomas, H.R.1
Sakarcan, A.S.2
-
40
-
-
0027607458
-
Interactive dynamic layout planning
-
Tommelein, I., and Zouein, P. (1993). "Interactive dynamic layout planning." J. Constr. Eng. Manage., 119(2), 266-287.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.2
, pp. 266-287
-
-
Tommelein, I.1
Zouein, P.2
-
41
-
-
0028732526
-
Assembly of simulation networks using designs, plans, and methods
-
Tommelein, I. D., Carr, R. I., and Odeh, A. M. (1994). "Assembly of simulation networks using designs, plans, and methods." J. Constr. Eng. Manage., 120(4), 796-815.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 796-815
-
-
Tommelein, I.D.1
Carr, R.I.2
Odeh, A.M.3
-
42
-
-
0026914052
-
Site layout modeling: How can artificial intelligence help?
-
Tommelein, I. D., Levitt, R. E., and Hayes-Roth, B. (1992). "Site layout modeling: How can artificial intelligence help?" J. Constr. Eng. Manage., 118(3), 594-611.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.3
, pp. 594-611
-
-
Tommelein, I.D.1
Levitt, R.E.2
Hayes-Roth, B.3
-
43
-
-
0028044305
-
Time-space tradeoff strategies for space-schedule construction
-
ASCE, New York
-
Zouein, P., and Tommelein, I. (1994). "Time-space tradeoff strategies for space-schedule construction." Proc., 1st Conf. on Computing in Civil Engineering, ASCE, New York, 1180-1187.
-
(1994)
Proc., 1st Conf. on Computing in Civil Engineering
, pp. 1180-1187
-
-
Zouein, P.1
Tommelein, I.2
-
44
-
-
0033313625
-
Dynamic layout planning using hybrid incremental solution method
-
Zouein, P., and Tommelein, I. (1999). "Dynamic layout planning using hybrid incremental solution method." J. Constr. Eng. Manage., 125(6), 400-408.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.6
, pp. 400-408
-
-
Zouein, P.1
Tommelein, I.2
-
45
-
-
0024902990
-
Knowledge-based construction planning
-
Zozaya-Gorostiza, C., Hendrickson, C., and Rehak, D. (1989). "Knowledge-based construction planning." Proc., Construction Congress I - Excellence in the Constructed Project, 217-222.
-
(1989)
Proc., Construction Congress I - Excellence in the Constructed Project
, pp. 217-222
-
-
Zozaya-Gorostiza, C.1
Hendrickson, C.2
Rehak, D.3
|