-
2
-
-
78651094962
-
Optimal scheduling of multi-cluster tools with constant robot moving times, part ii: Tree-like topology configurations
-
Chan, W.-K. V., Ding, S., Yi, J., and, Song, D. 2011a. Optimal Scheduling of Multi-Cluster Tools with Constant Robot Moving Times, Part II: Tree-Like Topology Configurations. IEEE Transactions on Automation Science Engineering, 8 (1): 17-28.
-
(2011)
IEEE Transactions on Automation Science Engineering
, vol.8
, Issue.1
, pp. 17-28
-
-
Chan, W.-K.V.1
Ding, S.2
Yi, J.3
Song, D.4
-
3
-
-
78651098378
-
Optimal scheduling of multi-cluster tools with constant robot moving times, part i: Two-cluster analysis
-
Chan, W.-K., Yi, J., and, Ding, S. 2011b. Optimal Scheduling of Multi-Cluster Tools with Constant Robot Moving Times, Part I: Two-Cluster Analysis. IEEE Transactions on Automation Science Engineering, 8 (1): 5-16.
-
(2011)
IEEE Transactions on Automation Science Engineering
, vol.8
, Issue.1
, pp. 5-16
-
-
Chan, W.-K.1
Yi, J.2
Ding, S.3
-
4
-
-
0026154176
-
Temporal constraint networks
-
Dechter, R., Meiri, I., and, Pearl, J. 1991. Temporal constraint networks. Artif Intel, 49 (1): 61-95.
-
(1991)
Artif Intel
, vol.49
, Issue.1
, pp. 61-95
-
-
Dechter, R.1
Meiri, I.2
Pearl, J.3
-
5
-
-
33747443542
-
Multi-cluster tools scheduling: An integrated event graph and network model approach
-
Ding, S., Yi, J., and M. T. Zhang. 2006. "Multi-cluster Tools Scheduling: An Integrated Event Graph and Network Model Approach." IEEE Transactions on Semiconductor Manufacturing 19 (3): 339-351.
-
(2006)
IEEE Transactions on Semiconductor Manufacturing
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.1
Yi, J.2
Zhang, M.T.3
-
6
-
-
25144432280
-
Online scheduling of integrated single-wafer processing tools with temporal constraints
-
Hyun, Joong Yoon, and, Doo, Yong Lee. 2005. Online Scheduling of Integrated Single-Wafer Processing Tools with Temporal Constraints. IEEE Transactions on Semiconductor Manufacturing, 18 (4): 390-398.
-
(2005)
IEEE Transactions on Semiconductor Manufacturing
, vol.18
, Issue.4
, pp. 390-398
-
-
Hyun, J.Y.1
Doo, Y.L.2
-
8
-
-
0028481573
-
Single wafer cluster tool performance: An analysis of throughput
-
Perkinson, T. L., McLarty, P. K., and, Gyurcsik, R. S. 1994. Single Wafer Cluster Tool Performance: An Analysis of Throughput. IEEE Transactions on Semiconductor Manufacturing, 7 (3): 369-373.
-
(1994)
IEEE Transactions on Semiconductor Manufacturing
, vol.7
, Issue.3
, pp. 369-373
-
-
Perkinson, T.L.1
McLarty, P.K.2
Gyurcsik, R.S.3
-
9
-
-
0036691245
-
Optimal scheduling techniques for cluster tools with process-module and transport-module residency constraints
-
Rostami, S., and, Hamidzadeh, B. 2002. Optimal Scheduling Techniques for Cluster Tools with Process-Module and Transport-Module Residency Constraints. IEEE Transactions on Semiconductor Manufacturing, 15 (3): 341-349.
-
(2002)
IEEE Transactions on Semiconductor Manufacturing
, vol.15
, Issue.3
, pp. 341-349
-
-
Rostami, S.1
Hamidzadeh, B.2
-
10
-
-
1342329492
-
An optimal residency-aware scheduling technique for cluster tools with buffer module
-
Rostami, S., and, Hamidzadeh, B. 2004. An Optimal Residency-Aware Scheduling Technique for Cluster Tools with Buffer Module. IEEE Transactions on Semiconductor Manufacturing, 17 (1): 68-73.
-
(2004)
IEEE Transactions on Semiconductor Manufacturing
, vol.17
, Issue.1
, pp. 68-73
-
-
Rostami, S.1
Hamidzadeh, B.2
-
11
-
-
0035485501
-
An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
-
Rostami, S., Hamidzadeh, B., and, Camporese, D. 2001. An Optimal Periodic Scheduler for Dual-Arm Robots in Cluster Tools with Residency Constraints. IEEE Transactions on Robotics and Automation, 17 (5): 609-618.
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.5
, pp. 609-618
-
-
Rostami, S.1
Hamidzadeh, B.2
Camporese, D.3
-
12
-
-
0031276238
-
A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Venkatesh, S., Davenport, R., Foxhoven, P., and, Nulman, J. 1997. A Steady-State Throughput Analysis of Cluster Tools: Dual-Blade Versus Single-Blade Robots. IEEE Transactions on Semiconductor Manufacturing, 10 (4): 418-424.
-
(1997)
IEEE Transactions on Semiconductor Manufacturing
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
13
-
-
77956689709
-
A branch and bound algorithm for optimal cyclic scheduling in a robotic cell with processing time windows
-
Yan, Pengyu, Chu, Chengbin, Yang, Naiding, and, Che, Ada. 2010. A Branch and Bound Algorithm for Optimal Cyclic Scheduling in a Robotic Cell with Processing Time Windows. International Journal of Production Research, 48 (21): 6461-6480.
-
(2010)
International Journal of Production Research
, vol.48
, Issue.21
, pp. 6461-6480
-
-
Yan, P.1
Chu, C.2
Yang, N.3
Che, A.4
-
14
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach
-
Yi, J., Ding, S., Song, D., and, Zhang, M. T. 2008. Steady-State Throughput and Scheduling Analysis of Multi-Cluster Tools: A Decomposition Approach. IEEE Transactions on Automation Science Engineering, 5 (2): 321-336.
-
(2008)
IEEE Transactions on Automation Science Engineering
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Song, D.3
Zhang, M.T.4
|