-
1
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput
-
T.L. Perkinson, P.K. McLarty, R.S. Gyurcsik and R.K. Cavin, III, "Single-wafer cluster tool performance: an analysis of throughput," IEEE Trans. Semicond. Manuf., vol. 7, no. 3, 1994, pp. 369-373.
-
(1994)
IEEE Trans. Semicond. Manuf.
, vol.7
, Issue.3
, pp. 369-373
-
-
Perkinson, T.L.1
McLarty, P.K.2
Gyurcsik, R.S.3
Cavin Iii, R.K.4
-
2
-
-
0031276238
-
A steadystate throughput analysis of cluster tools: Dual-blade versus singleblade robots
-
S. Venkatesh, R. Davenport, P. Foxhoven and J. Nulman, "A steadystate throughput analysis of cluster tools: dual-blade versus singleblade robots," IEEE Trans. Semicond. Manuf., vol. 10, no. 4, 1997, pp. 418-424.
-
(1997)
IEEE Trans. Semicond. Manuf.
, vol.10
, Issue.4
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
3
-
-
0041384559
-
Scheduling analysis of time-constrained dual-armed cluster tools
-
J.-H. Kim, T.-E. Lee, H.-Y. Lee and D.-B. Park, "Scheduling analysis of time-constrained dual-armed cluster tools," IEEE Trans. Semicond. Manuf., vol. 16, no. 3, 2003, pp. 521-534.
-
(2003)
IEEE Trans. Semicond. Manuf.
, vol.16
, Issue.3
, pp. 521-534
-
-
Kim, J.-H.1
Lee, T.-E.2
Lee, H.-Y.3
Park, D.-B.4
-
4
-
-
0035485301
-
Timed Petri nets in modeling and analysis of cluster tools
-
W.M. Zuberek, "Timed Petri nets in modeling and analysis of cluster tools," IEEE Transactions on Robotics & Automation, vol. 17, no. 5, 2001, pp. 562-575.
-
(2001)
IEEE Transactions on Robotics & Automation
, vol.17
, Issue.5
, pp. 562-575
-
-
Zuberek, W.M.1
-
5
-
-
34249658388
-
Cyclic hoist scheduling in large real-life electroplating lines
-
A. Che and C. Chu, "Cyclic hoist scheduling in large real-life electroplating lines," OR Spectrum, vol. 29, no. 3, 2007, pp. 445-470.
-
(2007)
OR Spectrum
, vol.29
, Issue.3
, pp. 445-470
-
-
Che, A.1
Chu, C.2
-
6
-
-
0034367676
-
Cyclic scheduling in robotic flowshops
-
Y. Crama, V. Kats, J. van de Klundert and E. Levner, "Cyclic scheduling in robotic flowshops," Ann. Oper. Res., vol. 96, 2000, pp. 97-124.
-
(2000)
Ann. Oper. Res.
, vol.96
, pp. 97-124
-
-
Crama, Y.1
Kats, V.2
Van De Klundert, J.3
Levner, E.4
-
7
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Y. Crama and J. Van De Klundert, "Cyclic scheduling of identical parts in a robotic cell," Oper. Res., vol. 45, no. 6, 1997, pp. 952-965.
-
(1997)
Oper. Res.
, vol.45
, Issue.6
, pp. 952-965
-
-
Crama, Y.1
Van De Klundert, J.2
-
8
-
-
0036769403
-
On throughput maximization in constant travel-time robotic cells
-
M. Dawande, C. Sriskandarajah and S. Sethi, "On throughput maximization in constant travel-time robotic cells," Manufacturing and Service Oper. Management, vol. 4, no. 4, 2002, pp. 296-312.
-
(2002)
Manufacturing and Service Oper. Management
, vol.4
, Issue.4
, pp. 296-312
-
-
Dawande, M.1
Sriskandarajah, C.2
Sethi, S.3
-
9
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
M. Dawande, H.N. Geismar, S.P. Sethi and C. Sriskandarajah, "Sequencing and scheduling in robotic cells: Recent developments," Journal of Scheduling, vol. 8, no. 5, 2005, pp. 387-426.
-
(2005)
Journal of Scheduling
, vol.8
, Issue.5
, pp. 387-426
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.P.3
Sriskandarajah, C.4
-
12
-
-
3242715937
-
Increasing throughput for robotic cells with parallel Machines and multiple robots
-
H.N. Geismar, C. Sriskandarajah and N. Ramanan, "Increasing throughput for robotic cells with parallel Machines and multiple robots," IEEE Transactions on Automation Science and Engineering, vol. 1, no. 1, 2004, pp. 84-89.
-
(2004)
IEEE Transactions on Automation Science and Engineering
, vol.1
, Issue.1
, pp. 84-89
-
-
Geismar, H.N.1
Sriskandarajah, C.2
Ramanan, N.3
-
13
-
-
33747443542
-
Multicluster tools scheduling: An integrated event graph and network model approach
-
S. Ding, J. Yi and M.T. Zhang, "Multicluster Tools Scheduling: An Integrated Event Graph and Network Model Approach," IEEE Trans. Semicond. Manuf., vol. 19, no. 3, 2006, pp. 339-351.
-
(2006)
IEEE Trans. Semicond. Manuf.
, vol.19
, Issue.3
, pp. 339-351
-
-
Ding, S.1
Yi, J.2
Zhang, M.T.3
-
14
-
-
41949134365
-
Steady-state throughput and scheduling analysis of multi-cluster tools: A decomposition approach
-
J. Yi, S. Ding, D. Song and M.T. Zhang, "Steady-State Throughput and Scheduling Analysis of Multi-Cluster Tools: A Decomposition Approach," IEEE Transactions on Automation Science and Engineering, vol. 5, no. 2, 2008, pp. 321-336.
-
(2008)
IEEE Transactions on Automation Science and Engineering
, vol.5
, Issue.2
, pp. 321-336
-
-
Yi, J.1
Ding, S.2
Song, D.3
Zhang, M.T.4
-
16
-
-
54949096231
-
Optimal scheduling of kunit production of cluster tools with single-blade robots
-
W.K.V. Chan, J. Yi, S. Ding and D. Song, "Optimal scheduling of kunit production of cluster tools with single-blade robots," IEEE International Conference on Automation Science and Engineering 2008 (CASE 2008), 2008, pp. 335-340.
-
(2008)
IEEE International Conference on Automation Science and Engineering 2008 (CASE 2008)
, pp. 335-340
-
-
Chan, W.K.V.1
Yi, J.2
Ding, S.3
Song, D.4
-
17
-
-
50249110762
-
Cycle time reduction at cluster tool in semiconductor wafer fabrication
-
A.N. Swe, A.K. Gupta, A.I. Sivakumar and P. Lendermann, "Cycle time reduction at cluster tool in semiconductor wafer fabrication," Electronics Packaging Technology Conference, 2006. EPTC '06. 8th, 2006, pp. 671-677.
-
(2006)
Electronics Packaging Technology Conference, 2006. EPTC '06. 8th
, pp. 671-677
-
-
Swe, A.N.1
Gupta, A.K.2
Sivakumar, A.I.3
Lendermann, P.4
-
18
-
-
0034429115
-
Simulation based cause and effect analysis of cycle time distribution in semiconductor backend
-
A.I. Sivakumar, "Simulation based cause and effect analysis of cycle time distribution in semiconductor backend," Proceedings of the 32nd conference on Winter simulation, 2000, pp. 1464-1471.
-
(2000)
Proceedings of the 32nd Conference on Winter Simulation
, pp. 1464-1471
-
-
Sivakumar, A.I.1
-
19
-
-
0026417185
-
Consistency of infinitesimal perturbation analysis for the GI/G/m queue
-
M.C. Fu and J.Q. Hu, "Consistency of infinitesimal perturbation analysis for the GI/G/m queue," European Journal of Operational Research, vol. 54, no. 1, 1991, pp. 121-139.
-
(1991)
European Journal of Operational Research
, vol.54
, Issue.1
, pp. 121-139
-
-
Fu, M.C.1
Hu, J.Q.2
-
20
-
-
49749108222
-
Mathematical programming-based perturbation analysis for GI/G/1 queues
-
Piscataway, New Jersy: Institute of Electrical and Electronics Engineers
-
H. Zhang and W.K.V. Chan, "Mathematical programming-based perturbation analysis for GI/G/1 queues," Proceedings of the 2007 Winter Simulation Conference, Piscataway, New Jersy: Institute of Electrical and Electronics Engineers, 2007, pp. 553-559.
-
(2007)
Proceedings of the 2007 Winter Simulation Conference
, pp. 553-559
-
-
Zhang, H.1
Chan, W.K.V.2
-
21
-
-
77957882546
-
Modelling and analysis of multiple cluster tools system with random failures using coloured Petri net
-
10.1007/s00170-00010-02592-00178
-
T. Aized, "Modelling and analysis of multiple cluster tools system with random failures using coloured Petri net," The International Journal of Advanced Manufacturing Technology, 2010, pp. 10.1007/s00170-00010-02592- 00178.
-
(2010)
The International Journal of Advanced Manufacturing Technology
-
-
Aized, T.1
-
22
-
-
46849094532
-
Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net
-
J.-H. Kim and T.-E. Lee, "Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net," IEEE Transactions on Automation Science and Engineering, vol. 5, no. 3, 2008, pp. 490-503.
-
(2008)
IEEE Transactions on Automation Science and Engineering
, vol.5
, Issue.3
, pp. 490-503
-
-
Kim, J.-H.1
Lee, T.-E.2
-
23
-
-
78651090465
-
Optimal scheduling of multi- cluster tools with constant robot moving times, part I: Two- cluster analysis
-
to appear
-
W.K.V. Chan, J. Yi and S. Ding, "Optimal Scheduling of Multi- Cluster Tools with Constant Robot Moving Times, Part I: Two- Cluster Analysis," IEEE Transactions On Automation Science and Engineering (to appear), 2010.
-
(2010)
IEEE Transactions on Automation Science and Engineering
-
-
Chan, W.K.V.1
Yi, J.2
Ding, S.3
-
24
-
-
9644286254
-
Scheduling multiple parts in a robotic cell served by a dual-gripper robot
-
C. Sriskandarajah, I. Drobouchevitch, S.P. Sethi and R. Chandrasekaran, "Scheduling multiple parts in a robotic cell served by a dual-gripper robot," Oper. Res., vol. 52, no. 1, 2004, pp. 65-82.
-
(2004)
Oper. Res.
, vol.52
, Issue.1
, pp. 65-82
-
-
Sriskandarajah, C.1
Drobouchevitch, I.2
Sethi, S.P.3
Chandrasekaran, R.4
-
25
-
-
78651074409
-
Optimal scheduling of multi- cluster tools with constant robot moving times, part II: Tree-like topology configurations
-
to appear
-
W.K.V. Chan, J. Yi and S. Ding, "Optimal Scheduling of Multi- Cluster Tools with Constant Robot Moving Times, Part II: Tree-Like Topology Configurations," IEEE Transactions On Automation Science and Engineering (to appear), 2010.
-
(2010)
IEEE Transactions on Automation Science and Engineering
-
-
Chan, W.K.V.1
Yi, J.2
Ding, S.3
-
26
-
-
60749115278
-
Optimization models of discrete- event system dynamics
-
W.K.V. Chan and L.W. Schruben, "Optimization Models of Discrete- Event System Dynamics," Oper. Res., vol. 56, no. 1218-1237, 2008.
-
(2008)
Oper. Res.
, vol.56
, Issue.1218-1237
-
-
Chan, W.K.V.1
Schruben, L.W.2
-
28
-
-
17744380258
-
Nonlinear Regression Fits for Simulated Cycle Time vs. Throughput Curves for Semiconductor Manufacturing
-
R.T. Johnson, F. Yang, B.E. Ankenman and B.L. Nelson, "Nonlinear Regression Fits for Simulated Cycle Time vs. Throughput Curves for Semiconductor Manufacturing," Proceedings of the 2004 Winter Simulation Conference, 2004, pp. 1951-1955.
-
(2004)
Proceedings of the 2004 Winter Simulation Conference
, pp. 1951-1955
-
-
Johnson, R.T.1
Yang, F.2
Ankenman, B.E.3
Nelson, B.L.4
-
29
-
-
0042121901
-
Resource-driven and job-driven simulations
-
T. Roeder, S.A. Fischbein, L.W. Schruben and M. Janakiram, "Resource-driven and Job-driven Simulations," Proceedings of the 2002 International Conference on Modeling and Analysis of Semiconductor Manufacturing, 2002, pp. 78-83.
-
(2002)
Proceedings of the 2002 International Conference on Modeling and Analysis of Semiconductor Manufacturing
, pp. 78-83
-
-
Roeder, T.1
Fischbein, S.A.2
Schruben, L.W.3
Janakiram, M.4
|