메뉴 건너뛰기




Volumn 62, Issue 5, 2013, Pages 446-473

Performance measurement and management in practice: Advantages, disadvantages and reasons for use

Author keywords

Organizations; Performance management; Performance management systems; Performance measurement

Indexed keywords


EID: 84878833106     PISSN: 17410401     EISSN: None     Source Type: Journal    
DOI: 10.1108/IJPPM-10-2012-0118     Document Type: Article
Times cited : (70)

References (123)
  • 1
    • 0000862536 scopus 로고
    • The impact of manufacturing flexibility on management control system design
    • Abernethy, M.A. and Lillis, A. (1995), “The impact of manufacturing flexibility on management control system design”, Accounting, Organizations and Society, Vol. 20 No. 4, pp. 241-258.
    • (1995) Accounting, Organizations and Society , vol.20 , Issue.4 , pp. 241-258
    • Abernethy, M.A.1    Lillis, A.2
  • 2
    • 0004210879 scopus 로고
    • No. 29, Series: Quantitative Applications in the Social Sciences, Sage Publications, Thousand Oaks, CA.
    • Achen, C.H. (1982), Interpreting and Using Regression, No. 29, Series: Quantitative Applications in the Social Sciences, Sage Publications, Thousand Oaks, CA.
    • (1982) Interpreting and Using Regression
    • Achen, C.H.1
  • 3
    • 0035414011 scopus 로고    scopus 로고
    • Applying the balanced scorecard concept: an experience report
    • Ahn, H. (2001), “Applying the balanced scorecard concept: an experience report”, Long Range Planning, Vol. 34 No. 4, pp. 441-461.
    • (2001) Long Range Planning , vol.34 , Issue.4 , pp. 441-461
    • Ahn, H.1
  • 5
    • 0004268475 scopus 로고    scopus 로고
    • Pine Forge Press, Thousand Oaks, CA.
    • Allison, P.D. (1999), Multiple Regression, Pine Forge Press, Thousand Oaks, CA.
    • (1999) Multiple Regression
    • Allison, P.D.1
  • 8
    • 1342307574 scopus 로고    scopus 로고
    • The usefulness of a performance measurement system in the daily life of an organisation: a note on a case study
    • Azofraa, V., Prietob, B. and Santidrián, A. (2003), “The usefulness of a performance measurement system in the daily life of an organisation: a note on a case study”, The British Accounting Review, Vol. 35, pp. 367-384.
    • (2003) The British Accounting Review , vol.35 , pp. 367-384
    • Azofraa, V.1    Prietob, B.2    Santidrián, A.3
  • 10
    • 58149094949 scopus 로고    scopus 로고
    • Performance measurement in Italian hospitals: the role of the balanced scorecard
    • in Neely, A., Kennerly, M. and Waters, A. (Eds) Centre for Business Performance, Cranfield University, Cranfield
    • Baraldi, S. and Monolo, G. (2004), “Performance measurement in Italian hospitals: the role of the balanced scorecard”, in Neely, A., Kennerly, M. and Waters, A. (Eds), Performance Measurement and Management: Public and Private, Centre for Business Performance, Cranfield University, Cranfield, pp. 75-82.
    • (2004) Performance Measurement and Management: Public and Private , pp. 75-82
    • Baraldi, S.1    Monolo, G.2
  • 11
    • 33745443979 scopus 로고    scopus 로고
    • The interplay between performance measurement, organizational culture and management styles
    • in Neely, A., Kennerly, M. and Waters, A. (Eds) Centre for Business Performance, Cranfield University, Cranfield
    • Bititci, U., Mendibil, K., Nudurupati, S., Turner, T. and Garengo, P. (2004), “The interplay between performance measurement, organizational culture and management styles”, in Neely, A., Kennerly, M. and Waters, A. (Eds), Performance Measurement and Management: Public and Private, Centre for Business Performance, Cranfield University, Cranfield, pp. 107-114.
    • (2004) Performance Measurement and Management: Public and Private , pp. 107-114
    • Bititci, U.1    Mendibil, K.2    Nudurupati, S.3    Turner, T.4    Garengo, P.5
  • 17
    • 4544339898 scopus 로고    scopus 로고
    • Performance effects of using the balanced scorecard: a note on the Dutch experience
    • Braam, G.J. and Nijssen, E.J. (2004), “Performance effects of using the balanced scorecard: a note on the Dutch experience”, Long Range Planning, Vol. 37 No. 4, pp. 335-349.
    • (2004) Long Range Planning , vol.37 , Issue.4 , pp. 335-349
    • Braam, G.J.1    Nijssen, E.J.2
  • 18
    • 0002035694 scopus 로고    scopus 로고
    • Using the balanced scorecard to measure supply chain performance
    • Brewer, P. and Speh, T. (2000), “Using the balanced scorecard to measure supply chain performance”, Journal of Business Logistics, Vol. 21 No. 1, pp. 75-93.
    • (2000) Journal of Business Logistics , vol.21 , Issue.1 , pp. 75-93
    • Brewer, P.1    Speh, T.2
  • 19
    • 2942663106 scopus 로고    scopus 로고
    • The unbalanced scorecard: a social and environment critique
    • in Neely, A., Walters, A. and Austin, R. (Eds) Cranfield School of Management, Cranfield
    • Brignall, S. (2002), “The unbalanced scorecard: a social and environment critique”, in Neely, A., Walters, A. and Austin, R. (Eds), Performance Measurement and Management: Research and Action, Cranfield School of Management, Cranfield, pp. 85-91.
    • (2002) Performance Measurement and Management: Research and Action , pp. 85-91
    • Brignall, S.1
  • 20
    • 58149092762 scopus 로고    scopus 로고
    • Implementing a system of performance management in England's primary school
    • in Neely, A., Kennerly, M. and Waters, A. (Eds) Centre for Business Performance, Cranfield University, Cranfield
    • Brown, A. (2004), “Implementing a system of performance management in England's primary school”, in Neely, A., Kennerly, M. and Waters, A. (Eds), Performance Measurement and Management: Public and Private, Centre for Business Performance, Cranfield University, Cranfield, pp. 155-162.
    • (2004) Performance Measurement and Management: Public and Private , pp. 155-162
    • Brown, A.1
  • 21
    • 0014324927 scopus 로고
    • A comparison of factor analytic techniques
    • Browne, M.W. (1968), “A comparison of factor analytic techniques”, Psychometrika, Vol. 33 No. 3, pp. 267-334.
    • (1968) Psychometrika , vol.33 , Issue.3 , pp. 267-334
    • Browne, M.W.1
  • 22
    • 33645938947 scopus 로고    scopus 로고
    • Managing value creation within the firm: an examination of multiple performance measurement
    • Bryant, L., Jones, D.A. and Widener, S.K. (2004), “Managing value creation within the firm: an examination of multiple performance measurement”, Journal of Management Accounting Research, Vol. 16 No. 1, pp. 107-131.
    • (2004) Journal of Management Accounting Research , vol.16 , Issue.1 , pp. 107-131
    • Bryant, L.1    Jones, D.A.2    Widener, S.K.3
  • 23
    • 46149087307 scopus 로고    scopus 로고
    • The relationship of strategic performance management to team strategy, company performance and organizational effectiveness
    • Chau, V.S. (2008), “The relationship of strategic performance management to team strategy, company performance and organizational effectiveness”, Team Performance Management, Vol. 14 Nos 3/4, pp. 113-117.
    • (2008) Team Performance Management , vol.14 , Issue.3-4 , pp. 113-117
    • Chau, V.S.1
  • 24
    • 0031167855 scopus 로고    scopus 로고
    • Reliance on manufacturing performance measures, total quality management and organisational performance
    • Chenhall, R.H. (1997), “Reliance on manufacturing performance measures, total quality management and organisational performance”, Management Accounting Research, Vol. 8 No. 2, pp. 187-206.
    • (1997) Management Accounting Research , vol.8 , Issue.2 , pp. 187-206
    • Chenhall, R.H.1
  • 26
    • 0000087715 scopus 로고
    • Multiple regression as a general data-analytic system
    • Cohen, J. (1968), “Multiple regression as a general data-analytic system”, Psychological Bulletin, Vol. 70 No. 6, pp. 426-443.
    • (1968) Psychological Bulletin , vol.70 , Issue.6 , pp. 426-443
    • Cohen, J.1
  • 27
    • 58149089661 scopus 로고    scopus 로고
    • Relationship between high quality implementation procedures and improved financial performance for new performance measurement systems
    • Davis, S. and Albright, T. (2002), “Relationship between high quality implementation procedures and improved financial performance for new performance measurement systems”, FSR Forum, Vol. 4, pp. 22-31.
    • (2002) FSR Forum , vol.4 , pp. 22-31
    • Davis, S.1    Albright, T.2
  • 28
    • 2942689985 scopus 로고    scopus 로고
    • An investigation of the effect of balanced scorecard implementation on financial performance
    • Davis, S. and Albright, T. (2004), “An investigation of the effect of balanced scorecard implementation on financial performance”, Management Accounting Research, Vol. 15 No. 2, pp. 135-153.
    • (2004) Management Accounting Research , vol.15 , Issue.2 , pp. 135-153
    • Davis, S.1    Albright, T.2
  • 30
    • 0039985166 scopus 로고    scopus 로고
    • The drivers of customer and corporate profitability: modelling, measuring, and managing the causal relationships
    • Epstein, M., Kumar, P. and Westbrook, R. (2000), “The drivers of customer and corporate profitability: modelling, measuring, and managing the causal relationships”, Advances in Management Accounting, Vol. 9 No. 1, pp. 43-72.
    • (2000) Advances in Management Accounting , vol.9 , Issue.1 , pp. 43-72
    • Epstein, M.1    Kumar, P.2    Westbrook, R.3
  • 31
    • 2542488438 scopus 로고    scopus 로고
    • An exploratory study of performance measurement systems and relationships with performance results
    • Evans, J.R. (2004), “An exploratory study of performance measurement systems and relationships with performance results”, Journal of Operations Management, Vol. 22 No. 3, pp. 219-232.
    • (2004) Journal of Operations Management , vol.22 , Issue.3 , pp. 219-232
    • Evans, J.R.1
  • 32
    • 0037308671 scopus 로고    scopus 로고
    • Systems modelling, simulation, and the dynamics of strategy
    • Fowler, A. (2003), “Systems modelling, simulation, and the dynamics of strategy”, Journal of Business Research, Vol. 56 No. 2, pp. 135-144.
    • (2003) Journal of Business Research , vol.56 , Issue.2 , pp. 135-144
    • Fowler, A.1
  • 33
    • 84861483417 scopus 로고    scopus 로고
    • Contemporary performance measurement systems: a review of their consequences and a framework for research
    • Franco-Santos, M., Lucianetti, L. and Bourne, M. (2012), “Contemporary performance measurement systems: a review of their consequences and a framework for research”, Management Accounting Research, Vol. 23 No. 2, pp. 79-119.
    • (2012) Management Accounting Research , vol.23 , Issue.2 , pp. 79-119
    • Franco-Santos, M.1    Lucianetti, L.2    Bourne, M.3
  • 34
    • 77951094850 scopus 로고    scopus 로고
    • from North Carolina State University Public Administration Program, available at: (accessed 22 March 2008).
    • Garson, D.G. (2008), “Factor analysis: statnotes”, from North Carolina State University Public Administration Program, available at: www2.chass.ncsu.edu/garson/pa765/factor.htm (accessed 22 March 2008).
    • (2008) Factor analysis: statnotes
    • Garson, D.G.1
  • 35
    • 0000232480 scopus 로고    scopus 로고
    • Multilevel design of performance measurement systems: enhancing strategic dialogue throughout the organization
    • Haas, M. de and Kleingeld, A. (1999), “Multilevel design of performance measurement systems: enhancing strategic dialogue throughout the organization”, Management Accounting Research, Vol. 10 No. 3, pp. 233-261.
    • (1999) Management Accounting Research , vol.10 , Issue.3 , pp. 233-261
    • de Haas, M.1    Kleingeld, A.2
  • 38
    • 19944363289 scopus 로고
    • Interviewing techniques in business and management research
    • in Wass, V. and Wells, P. (Eds) Aldershot, Dartmouth
    • Healey, M. and Rawlinson, M. (1994), “Interviewing techniques in business and management research”, in Wass, V. and Wells, P. (Eds), Principles and Practice in Business and Management Research, Aldershot, Dartmouth, pp. 123-146.
    • (1994) Principles and Practice in Business and Management Research , pp. 123-146
    • Healey, M.1    Rawlinson, M.2
  • 39
    • 58149087893 scopus 로고    scopus 로고
    • Performance measurement and quality systems: results of qualitative research carried out in companies that had won the Catalan quality award
    • in Neely, A., Kennerly, M. and Waters, A. (Eds) Centre for Business Performance, Cranfield University, Cranfield
    • Heras, M.A. (2004), “Performance measurement and quality systems: results of qualitative research carried out in companies that had won the Catalan quality award”, in Neely, A., Kennerly, M. and Waters, A. (Eds), Performance Measurement and Management: Public and Private, Centre for Business Performance, Cranfield University, Cranfield, pp. 459-466.
    • (2004) Performance Measurement and Management: Public and Private , pp. 459-466
    • Heras, M.A.1
  • 40
    • 11244325594 scopus 로고    scopus 로고
    • Balanced scorecard: two perspectives
    • Ho, S.J.K. and McKay, R. (2002), “Balanced scorecard: two perspectives”, CPA Journal, Vol. 72 No. 3, pp. 20-25.
    • (2002) CPA Journal , vol.72 , Issue.3 , pp. 20-25
    • Ho, S.J.K.1    McKay, R.2
  • 43
    • 0038019495 scopus 로고    scopus 로고
    • Total quality management and the balanced scorecard approach: a critical analysis of their potential relationships and directions for research
    • Hoque, Z. (2003), “Total quality management and the balanced scorecard approach: a critical analysis of their potential relationships and directions for research”, Critical Perspectives on Accounting, Vol. 14 No. 5, pp. 553-566.
    • (2003) Critical Perspectives on Accounting , vol.14 , Issue.5 , pp. 553-566
    • Hoque, Z.1
  • 45
    • 71849084570 scopus 로고    scopus 로고
    • Two studies reveal how firms are improving their budgeting and planning. Performance reporting: majority of companies need to fix their balanced scorecards
    • IOMA, Newark
    • IOMA Business Intelligence at Work (2005), “Two studies reveal how firms are improving their budgeting and planning. Performance reporting: majority of companies need to fix their balanced scorecards”, IOMA's Financial Analysis, Planning & Reporting 2005 Yearbook, IOMA, Newark, pp. 4-5.
    • (2005) IOMA's Financial Analysis, Planning & Reporting 2005 Yearbook , pp. 4-5
  • 46
    • 47549093159 scopus 로고    scopus 로고
    • Does measuring intangibles for management purposes improve performance? A review of the evidence
    • Ittner, C.D. (2008), “Does measuring intangibles for management purposes improve performance? A review of the evidence”, Accounting and Business Research, Vol. 38 No. 3, pp. 261-272.
    • (2008) Accounting and Business Research , vol.38 , Issue.3 , pp. 261-272
    • Ittner, C.D.1
  • 47
    • 21344446892 scopus 로고
    • Total quality management and the choice of information and reward systems
    • Ittner, C.D. and Larcker, D.F. (1995), “Total quality management and the choice of information and reward systems”, Journal of Accounting Research, Vol. 33, Supplement 1995, pp. 1-34.
    • (1995) Journal of Accounting Research , vol.33 , Issue.Supplement 1995 , pp. 1-34
    • Ittner, C.D.1    Larcker, D.F.2
  • 48
    • 0031115767 scopus 로고    scopus 로고
    • Quality strategy, strategic control systems, and organizational performance
    • Ittner, C.D. and Larcker, D.F. (1997), “Quality strategy, strategic control systems, and organizational performance”, Accounting, Organizations and Society, Vol. 22 Nos 3-4, pp. 293-314.
    • (1997) Accounting, Organizations and Society , vol.22 , Issue.3-4 , pp. 293-314
    • Ittner, C.D.1    Larcker, D.F.2
  • 49
    • 0042074498 scopus 로고    scopus 로고
    • Subjectivity and the weighting of performance measures: evidence from a balanced scorecard
    • Ittner, C.D., Larcker, D.F. and Meyer, M.W. (2003), “Subjectivity and the weighting of performance measures: evidence from a balanced scorecard”, The Accounting Review, Vol. 78 No. 3, pp. 725-758.
    • (2003) The Accounting Review , vol.78 , Issue.3 , pp. 725-758
    • Ittner, C.D.1    Larcker, D.F.2    Meyer, M.W.3
  • 51
    • 0034134680 scopus 로고    scopus 로고
    • Performance measurement at Nordic companies
    • Kald, M. and Nilsson, F. (2000), “Performance measurement at Nordic companies”, European Management Journal, Vol. 14 No. 1, pp. 113-127.
    • (2000) European Management Journal , vol.14 , Issue.1 , pp. 113-127
    • Kald, M.1    Nilsson, F.2
  • 53
    • 0038818931 scopus 로고    scopus 로고
    • The relationship between total quality management practices and their effect on firms performance
    • Kaynak, H. (2003), “The relationship between total quality management practices and their effect on firms performance”, Journal of Operations Management, Vol. 21 No. 4, pp. 405-435.
    • (2003) Journal of Operations Management , vol.21 , Issue.4 , pp. 405-435
    • Kaynak, H.1
  • 56
    • 58149091299 scopus 로고    scopus 로고
    • The design of a strategic management system in an industrial private sector organisation
    • in Neely, A., Kennerly, M. and Waters, A. (Eds) Centre for Business Performance, Cranfield University, Cranfield
    • Lawrie, G., Cobbold, I. and Issa, K. (2004), “The design of a strategic management system in an industrial private sector organisation”, in Neely, A., Kennerly, M. and Waters, A. (Eds), Performance Measurement and Management: Public and Private, Centre for Business Performance, Cranfield University, Cranfield, pp. 579-586.
    • (2004) Performance Measurement and Management: Public and Private , pp. 579-586
    • Lawrie, G.1    Cobbold, I.2    Issa, K.3
  • 57
    • 44949152974 scopus 로고    scopus 로고
    • The benefits of a scorecard system
    • Lawson, R., Stratton, W. and Hatch, T. (2003), “The benefits of a scorecard system”, CMA Management, Vol. 77 No. 4, pp. 24-26.
    • (2003) CMA Management , vol.77 , Issue.4 , pp. 24-26
    • Lawson, R.1    Stratton, W.2    Hatch, T.3
  • 58
    • 58149098198 scopus 로고    scopus 로고
    • Automating the balanced scorecard
    • Lawson, R., Stratton, W. and Hatch, T. (2004), “Automating the balanced scorecard”, CMA Management, Vol. 77 No. 9, pp. 39-43.
    • (2004) CMA Management , vol.77 , Issue.9 , pp. 39-43
    • Lawson, R.1    Stratton, W.2    Hatch, T.3
  • 60
    • 0002008075 scopus 로고    scopus 로고
    • From balanced scorecard to strategic gauges: is measurement worth it?
    • Lingle, J.H. and Schiemann, W.A. (1996), “From balanced scorecard to strategic gauges: is measurement worth it?”, Management Review, Vol. 5 No. 3, pp. 56-61.
    • (1996) Management Review , vol.5 , Issue.3 , pp. 56-61
    • Lingle, J.H.1    Schiemann, W.A.2
  • 62
    • 84870885674 scopus 로고    scopus 로고
    • Building a practically useful theory of goal setting and task motivation
    • Locke, E.A. and Latham, G.P. (2002), “Building a practically useful theory of goal setting and task motivation”, American Psychologist, Vol. 57 No. 9, pp. 705-717.
    • (2002) American Psychologist , vol.57 , Issue.9 , pp. 705-717
    • Locke, E.A.1    Latham, G.P.2
  • 63
    • 58149103459 scopus 로고    scopus 로고
    • A pragmatic assessment of the balanced scorecard: an evaluation of a new performance system for use in a NHS multi agency setting in the UK
    • Lovell, B., Radnor, Z. and Henderson, J. (2002), “A pragmatic assessment of the balanced scorecard: an evaluation of a new performance system for use in a NHS multi agency setting in the UK”, University of Bradford Working Paper Series, Vol. 2 No. 13, pp. 339-346.
    • (2002) University of Bradford Working Paper Series , vol.2 , Issue.13 , pp. 339-346
    • Lovell, B.1    Radnor, Z.2    Henderson, J.3
  • 64
    • 0037813085 scopus 로고
    • Tailoring performance measures to suit your business
    • Lynch, R. and Cross, K. (1990), “Tailoring performance measures to suit your business”, Journal of Accounting and EDP, Vol. 6 No. 1, pp. 17-25.
    • (1990) Journal of Accounting and EDP , vol.6 , Issue.1 , pp. 17-25
    • Lynch, R.1    Cross, K.2
  • 66
    • 84992976345 scopus 로고    scopus 로고
    • Communicating and controlling strategy: an empirical study of the effectiveness of the balanced scorecard
    • Malina, M.A. and Selto, F.H. (2001), “Communicating and controlling strategy: an empirical study of the effectiveness of the balanced scorecard”, Journal of Management Accounting Research, Vol. 13, pp. 47-90.
    • (2001) Journal of Management Accounting Research , vol.13 , pp. 47-90
    • Malina, M.A.1    Selto, F.H.2
  • 68
    • 45749115781 scopus 로고    scopus 로고
    • Researching performance measurement systems, an information systems perspective
    • Marchand, M. and Raymond, L. (2008), “Researching performance measurement systems, an information systems perspective”, International Journal of Operations & Production Management, Vol. 28 No. 7, pp. 663-686.
    • (2008) International Journal of Operations & Production Management , vol.28 , Issue.7 , pp. 663-686
    • Marchand, M.1    Raymond, L.2
  • 69
    • 2942720113 scopus 로고    scopus 로고
    • Gartner Inc and Cranfield School of Management, Stamford, CT.
    • Marr, B. and Neely, A. (2003), Balanced Scorecard Software Report, Gartner Inc and Cranfield School of Management, Stamford, CT.
    • (2003) Balanced Scorecard Software Report
    • Marr, B.1    Neely, A.2
  • 70
    • 84986097848 scopus 로고    scopus 로고
    • The dynamics of value creation: mapping your intellectual performance drivers
    • Marr, B., Schiuma, G. and Neely, A. (2004), “The dynamics of value creation: mapping your intellectual performance drivers”, Journal of Intellectual Capital, Vol. 5 No. 2, pp. 312-325.
    • (2004) Journal of Intellectual Capital , vol.5 , Issue.2 , pp. 312-325
    • Marr, B.1    Schiuma, G.2    Neely, A.3
  • 73
    • 46249100183 scopus 로고    scopus 로고
    • Performance measurement and program effectiveness: a structural equation modelling approach
    • Mausolff, C. and Spence, J. (2008), “Performance measurement and program effectiveness: a structural equation modelling approach”, International Journal of Public Administration, Vol. 31 No. 6, pp. 595-615.
    • (2008) International Journal of Public Administration , vol.31 , Issue.6 , pp. 595-615
    • Mausolff, C.1    Spence, J.2
  • 75
    • 15944368152 scopus 로고    scopus 로고
    • models of performance-measurement use in local governments: understanding budgeting, communication, and lasting effects
    • Melkers, J. and Willoughby, K. (2005), “models of performance-measurement use in local governments: understanding budgeting, communication, and lasting effects”, Public Administration Review, Vol. 65 No. 2, pp. 180-190.
    • (2005) Public Administration Review , vol.65 , Issue.2 , pp. 180-190
    • Melkers, J.1    Willoughby, K.2
  • 76
    • 80052586502 scopus 로고    scopus 로고
    • Performance measurement models in facility management: a comparative study
    • Meng, X. and Minogue, M. (2011), “Performance measurement models in facility management: a comparative study”, Facilities, Vol. 29 Nos 11/12, pp. 472-484.
    • (2011) Facilities , vol.29 , Issue.11-12 , pp. 472-484
    • Meng, X.1    Minogue, M.2
  • 77
    • 0033211797 scopus 로고    scopus 로고
    • The balanced scorecard: a necessary good or an unnecessary evil?
    • Mooraj, S., Oyon, D. and Hostettler, D. (1999), “The balanced scorecard: a necessary good or an unnecessary evil?”, European Management Journal, Vol. 17 No. 5, pp. 481-491.
    • (1999) European Management Journal , vol.17 , Issue.5 , pp. 481-491
    • Mooraj, S.1    Oyon, D.2    Hostettler, D.3
  • 78
    • 28344435907 scopus 로고    scopus 로고
    • Update: the evolution of performance measurement research
    • Neely, A. (2005), “Update: the evolution of performance measurement research”, International Journal of Operations & Production Management, Vol. 25 No. 12, pp. 1264-1277.
    • (2005) International Journal of Operations & Production Management , vol.25 , Issue.12 , pp. 1264-1277
    • Neely, A.1
  • 79
    • 33745440563 scopus 로고    scopus 로고
    • Measuring operations performance: past, present and future
    • in Neely, A. (Ed.), Centre for Business Performance, Cranfield School of Management, Cranfield University, Cranfield
    • Neely, A. and Austin, R. (2000), “Measuring operations performance: past, present and future”, in Neely, A. (Ed.), Performance Measurement: Past, Present and Future, Centre for Business Performance, Cranfield School of Management, Cranfield University, Cranfield, pp. 419-426.
    • (2000) Performance Measurement: Past, Present and Future , pp. 419-426
    • Neely, A.1    Austin, R.2
  • 80
    • 84993009218 scopus 로고    scopus 로고
    • Why measurement initiatives fail
    • Neely, A. and Bourne, M. (2000), “Why measurement initiatives fail”, Measuring Business Excellence, Vol. 4 No. 4, pp. 3-6.
    • (2000) Measuring Business Excellence , vol.4 , Issue.4 , pp. 3-6
    • Neely, A.1    Bourne, M.2
  • 81
    • 19944390545 scopus 로고    scopus 로고
    • Does the balanced scorecard work: an empirical investigation
    • in Neely, A., Kennerly, M. and Waters, A. (Eds) Centre for Business Performance, Cranfield University, Cranfield
    • Neely, A., Kennerley, M. and Martinez, V. (2004), “Does the balanced scorecard work: an empirical investigation”, in Neely, A., Kennerly, M. and Waters, A. (Eds), Performance Measurement and Management: Public and Private, Centre for Business Performance, Cranfield University, Cranfield, pp. 763-770.
    • (2004) Performance Measurement and Management: Public and Private , pp. 763-770
    • Neely, A.1    Kennerley, M.2    Martinez, V.3
  • 83
    • 0002520520 scopus 로고    scopus 로고
    • The balanced on the balanced scorecard: a critical analysis of some of the assumptions
    • Norreklit, H. (2000), “The balanced on the balanced scorecard: a critical analysis of some of the assumptions”, Management Accounting Research, Vol. 11 No. 1, pp. 65-88.
    • (2000) Management Accounting Research , vol.11 , Issue.1 , pp. 65-88
    • Norreklit, H.1
  • 84
    • 4544290177 scopus 로고    scopus 로고
    • Implementing the balanced scorecard in Greece: a software firm's experience
    • Papalexandris, A., Ioannou, G. and Prastacos, G.P. (2004), “Implementing the balanced scorecard in Greece: a software firm's experience”, Long Range Planning, Vol. 37 No. 4, pp. 347-362.
    • (2004) Long Range Planning , vol.37 , Issue.4 , pp. 347-362
    • Papalexandris, A.1    Ioannou, G.2    Prastacos, G.P.3
  • 85
    • 0007194601 scopus 로고
    • The influence of communality and N on the sampling distributions of factor loadings
    • Pennell, R. (1968), “The influence of communality and N on the sampling distributions of factor loadings”, Psychometrika, Vol. 33 No. 4, pp. 423-439.
    • (1968) Psychometrika , vol.33 , Issue.4 , pp. 423-439
    • Pennell, R.1
  • 86
    • 0031206462 scopus 로고    scopus 로고
    • Customer-focused manufacturing strategy and the use of operations-based nonfinancial performance measures: a research note
    • Perera, S., Harrison, G. and Poole, M. (1997), “Customer-focused manufacturing strategy and the use of operations-based nonfinancial performance measures: a research note”, Accounting, Organizations and Society, Vol. 22 No. 6, pp. 557-572.
    • (1997) Accounting, Organizations and Society , vol.22 , Issue.6 , pp. 557-572
    • Perera, S.1    Harrison, G.2    Poole, M.3
  • 87
  • 88
    • 58149092053 scopus 로고    scopus 로고
    • Performance management programs
    • Rheem, H. (1996), “Performance management programs”, Harvard Business Review, Vol. 74 No. 5, pp. 8-10.
    • (1996) Harvard Business Review , vol.74 , Issue.5 , pp. 8-10
    • Rheem, H.1
  • 89
    • 23044528533 scopus 로고    scopus 로고
    • Management tools and techniques: a survey
    • Rigby, D. (2001), “Management tools and techniques: a survey”, California Management Review, Vol. 43 No. 2, pp. 139-160.
    • (2001) California Management Review , vol.43 , Issue.2 , pp. 139-160
    • Rigby, D.1
  • 90
    • 58149099443 scopus 로고    scopus 로고
    • The adoption of the balanced scorecard: performance measurement motives, measures and impact
    • in Neely, A., Kennerly, M. and Waters, A. (Eds) Centre for Business Performance, Cranfield University, Cranfield
    • Robinson, S.P. (2004), “The adoption of the balanced scorecard: performance measurement motives, measures and impact”, in Neely, A., Kennerly, M. and Waters, A. (Eds), Performance Measurement and Management: Public and Private, Centre for Business Performance, Cranfield University, Cranfield, pp. 883-890.
    • (2004) Performance Measurement and Management: Public and Private , pp. 883-890
    • Robinson, S.P.1
  • 92
    • 19944402218 scopus 로고    scopus 로고
    • An empirical investigation of the performance consequences of nonfinancial measures
    • Said, A.A., HassabElnaby, H.R. and Wier, B. (2003), “An empirical investigation of the performance consequences of nonfinancial measures”, Journal of Management Accounting Research, Vol. 15 No. 1, pp. 193-223.
    • (2003) Journal of Management Accounting Research , vol.15 , Issue.1 , pp. 193-223
    • Said, A.A.1    HassabElnaby, H.R.2    Wier, B.3
  • 94
    • 84986133560 scopus 로고    scopus 로고
    • Metrics and management: applying the results of the balanced scorecard
    • Self, J. (2004), “Metrics and management: applying the results of the balanced scorecard”, Performance Measurement and Metrics, Vol. 5 No. 3, pp. 101-105.
    • (2004) Performance Measurement and Metrics , vol.5 , Issue.3 , pp. 101-105
    • Self, J.1
  • 96
    • 0002682417 scopus 로고    scopus 로고
    • Automating the balanced scorecard
    • Silk, S. (1998), “Automating the balanced scorecard”, Management Accounting, Vol. 79 No. 11, pp. 38-44.
    • (1998) Management Accounting , vol.79 , Issue.11 , pp. 38-44
    • Silk, S.1
  • 97
    • 84986059552 scopus 로고    scopus 로고
    • Balanced scorecard: a rising trend in strategic performance measurement
    • Sim, K.L. and Koh, H.C. (2001), “Balanced scorecard: a rising trend in strategic performance measurement”, Measuring Business Excellence, Vol. 5 No. 2, pp. 18-28.
    • (2001) Measuring Business Excellence , vol.5 , Issue.2 , pp. 18-28
    • Sim, K.L.1    Koh, H.C.2
  • 98
    • 0012216938 scopus 로고
    • The performance management question in the organization of the future
    • Sink, D.S. and Tuttle, T.C. (1990), “The performance management question in the organization of the future”, Industrial Management, Vol. 32 No. 1, pp. 4-12.
    • (1990) Industrial Management , vol.32 , Issue.1 , pp. 4-12
    • Sink, D.S.1    Tuttle, T.C.2
  • 99
    • 0344253991 scopus 로고    scopus 로고
    • A descriptive analysis on the implementation of balanced scorecards in German speaking countries
    • Speckbacher, G., Bischof, J. and Pfeiffer, T. (2003), “A descriptive analysis on the implementation of balanced scorecards in German speaking countries”, Management Accounting Research, Vol. 14 No. 4, pp. 361-387.
    • (2003) Management Accounting Research , vol.14 , Issue.4 , pp. 361-387
    • Speckbacher, G.1    Bischof, J.2    Pfeiffer, T.3
  • 101
    • 33644512811 scopus 로고    scopus 로고
    • An expert diagnosis system for the benchmarking of SMEs' performance
    • St-Pierre, J. and Delisle, S. (2006), “An expert diagnosis system for the benchmarking of SMEs' performance”, Benchmarking: An International Journal, Vol. 13 Nos 1/2, pp. 106-119.
    • (2006) Benchmarking: An International Journal , vol.13 , Issue.1-2 , pp. 106-119
    • St-Pierre, J.1    Delisle, S.2
  • 103
    • 77949318504 scopus 로고    scopus 로고
    • Performance measurement and management: a literature review and a research agenda
    • Taticchi, P., Tonelli, F. and Cagnazzo, L. (2010), “Performance measurement and management: a literature review and a research agenda”, Measuring Business Excellence, Vol. 14 No. 1, pp. 4-18.
    • (2010) Measuring Business Excellence , vol.14 , Issue.1 , pp. 4-18
    • Taticchi, P.1    Tonelli, F.2    Cagnazzo, L.3
  • 104
    • 84986051003 scopus 로고    scopus 로고
    • The characteristics of performance management research, implications and challenges
    • Thorpe, R. and Beasley, T. (2004), “The characteristics of performance management research, implications and challenges”, International Journal of Productivity and Performance Management, Vol. 53 No. 4, pp. 334-344.
    • (2004) International Journal of Productivity and Performance Management , vol.53 , Issue.4 , pp. 334-344
    • Thorpe, R.1    Beasley, T.2
  • 105
    • 0142022795 scopus 로고    scopus 로고
    • Performance measures and the rationalization of organizations
    • Towley, B., Cooper, D.J. and Oakes, L. (2003), “Performance measures and the rationalization of organizations”, Organization Studies, Vol. 24 No. 7, pp. 1045-1071.
    • (2003) Organization Studies , vol.24 , Issue.7 , pp. 1045-1071
    • Towley, B.1    Cooper, D.J.2    Oakes, L.3
  • 107
    • 34548496042 scopus 로고    scopus 로고
    • Performance measurement impacts on management and leadership: perspectives of management and employees
    • Ukko, J., Tenhunen, J. and Rantanen, H. (2007), “Performance measurement impacts on management and leadership: perspectives of management and employees”, International Journal of Production Economics, Vol. 110 Nos 1-2, pp. 39-51.
    • (2007) International Journal of Production Economics , vol.110 , Issue.1-2 , pp. 39-51
    • Ukko, J.1    Tenhunen, J.2    Rantanen, H.3
  • 108
    • 84986031700 scopus 로고    scopus 로고
    • The impact of culture on the use of performance measurement information in the university setting
    • Vakkuri, J. and Meklin, P. (2000), “The impact of culture on the use of performance measurement information in the university setting”, Management Decision, Vol. 41 No. 8, pp. 751-759.
    • (2000) Management Decision , vol.41 , Issue.8 , pp. 751-759
    • Vakkuri, J.1    Meklin, P.2
  • 109
    • 0642291571 scopus 로고
    • A comparison of component and factor patterns: a Monte Carlo approach
    • Velicer, W.F., Peacock, A.C. and Jackson, D.N. (1982), “A comparison of component and factor patterns: a Monte Carlo approach”, Multivariate Behavioral Research, Vol. 17 No. 3, pp. 371-388.
    • (1982) Multivariate Behavioral Research , vol.17 , Issue.3 , pp. 371-388
    • Velicer, W.F.1    Peacock, A.C.2    Jackson, D.N.3
  • 113
    • 71849083636 scopus 로고    scopus 로고
    • The relationship between the level of completeness of a strategic management system and perceived advantages and disadvantages
    • Waal, A.A. de, Kourit, K. and Nijkamp, P. (2009), “The relationship between the level of completeness of a strategic management system and perceived advantages and disadvantages”, International Journal of Operations & Production Management, Vol. 29 No. 12, pp. 1242-1265.
    • (2009) International Journal of Operations & Production Management , vol.29 , Issue.12 , pp. 1242-1265
    • de Waal, A.A.1    Kourit, K.2    Nijkamp, P.3
  • 115
    • 84986037628 scopus 로고    scopus 로고
    • Is intellectual capital performance and disclosure practices related?
    • Williams, M.S. (2001), “Is intellectual capital performance and disclosure practices related?”, Journal of Intellectual Capital, Vol. 2 No. 3, pp. 192-203.
    • (2001) Journal of Intellectual Capital , vol.2 , Issue.3 , pp. 192-203
    • Williams, M.S.1
  • 117
    • 34547772050 scopus 로고    scopus 로고
    • Multiple perspectives of performance measures
    • Chenhall, R.H. and Langfield-Smith, K. (2007), “Multiple perspectives of performance measures”, European Management Journal, Vol. 25 No. 4, pp. 266-282.
    • (2007) European Management Journal , vol.25 , Issue.4 , pp. 266-282
    • Chenhall, R.H.1    Langfield-Smith, K.2
  • 118
    • 26444511618 scopus 로고    scopus 로고
    • Performance measurement in the public sector: the German experience
    • Greiling, D. (2005), “Performance measurement in the public sector: the German experience”, International Journal of Productivity and Performance Management, Vol. 54 No. 7, pp. 551-567.
    • (2005) International Journal of Productivity and Performance Management , vol.54 , Issue.7 , pp. 551-567
    • Greiling, D.1
  • 119
    • 2942625232 scopus 로고    scopus 로고
    • Coming up short on nonfinancial performance measurement
    • Ittner, C.D. and Larcker, D.F. (2003), “Coming up short on nonfinancial performance measurement”, Harvard Business Review, Vol. 81 No. 11, pp. 88-95.
    • (2003) Harvard Business Review , vol.81 , Issue.11 , pp. 88-95
    • Ittner, C.D.1    Larcker, D.F.2
  • 121
    • 33845897268 scopus 로고    scopus 로고
    • Minimum sample size recommendations for conducting factor analysis
    • Mundfrom, D.J., Shaw, D.G. and Tian, L.K. (2005), “Minimum sample size recommendations for conducting factor analysis”, International Journal of Testing, Vol. 5 No. 2, pp. 159-168.
    • (2005) International Journal of Testing , vol.5 , Issue.2 , pp. 159-168
    • Mundfrom, D.J.1    Shaw, D.G.2    Tian, L.K.3
  • 123
    • 84878851745 scopus 로고    scopus 로고
    • The cascading process for multi-level balanced scorecard design: the case of a Belgian wastewater management company
    • in Neely, A., Kennerly, M. and Walters, A. (Eds) Centre for Business Performance, Cranfield University, Cranfield
    • Scheipers, G., Ameels, A. and Bruggeman, W. (2004), “The cascading process for multi-level balanced scorecard design: the case of a Belgian wastewater management company”, in Neely, A., Kennerly, M. and Walters, A. (Eds), Performance Measurement and Management: Public and Private, Centre for Business Performance, Cranfield University, Cranfield, pp. 1209-1216.
    • (2004) Performance Measurement and Management: Public and Private , pp. 1209-1216
    • Scheipers, G.1    Ameels, A.2    Bruggeman, W.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.