메뉴 건너뛰기




Volumn 8, Issue 1, 2009, Pages 111-118

Real-time progress management system for steel structure construction

Author keywords

3D CAD; Database; Progress management; RFID; Steel structural construction; Visualization

Indexed keywords

COMPUTER AIDED DESIGN; DATABASE SYSTEMS; FLOW VISUALIZATION; RADIO FREQUENCY IDENTIFICATION (RFID); REAL TIME SYSTEMS; SCHEDULING; STEEL STRUCTURES; THREE DIMENSIONAL COMPUTER GRAPHICS;

EID: 68349130104     PISSN: 13467581     EISSN: 13472852     Source Type: Journal    
DOI: 10.3130/jaabe.8.111     Document Type: Article
Times cited : (11)

References (15)
  • 1
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedules with 4D-CAD tools
    • McKinney, K. and Fischer, M. (1998) Generating, evaluating and visualizing construction schedules with 4D-CAD tools. Automation in Construction, 7 (6), pp.433-447.
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 2
    • 68349145511 scopus 로고    scopus 로고
    • Real-time 4D CAD + RFID for Project Progress Management
    • April 5-7, San Diego, California
    • Sangyoon Chin. and Suwon Yoon. (2005) Real-time 4D CAD + RFID for Project Progress Management. ASCE Conference Proceeding, April 5-7, San Diego, California.
    • (2005) ASCE Conference Proceeding
    • Sangyoon, C.1    Yoon, S.2
  • 3
    • 39349114541 scopus 로고    scopus 로고
    • RFID + 4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings
    • Sangyoon Chin. and Suwon Yoon. (2008) RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings. Journal of Computing in Civil Engineering, 22(2), pp.74-89.
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.2 , pp. 74-89
    • Sangyoon, C.1    Yoon, S.2
  • 4
    • 84889492598 scopus 로고    scopus 로고
    • Integrated and Automated Project Processes in Civil Engineering: Experiences of the Center for Integrated Facility Engineering at Stanford university
    • Blacksburg, VA
    • Kunz, J., Fischer, M., Haymaker, J., and Levitt, R. (2001) Integrated and Automated Project Processes in Civil Engineering: Experiences of the Center for Integrated Facility Engineering at Stanford university. Proceedings from ASCE Specialty Conference, Blacksburg, VA. pp.96-105.
    • (2001) Proceedings from ASCE Specialty Conference , pp. 96-105
    • Kunz, J.1    Fischer, M.2    Haymaker, J.3    Levitt, R.4
  • 5
    • 0014574409 scopus 로고
    • Multiproject scheduling with limited resources: A zero-one programming approach
    • A.A.B. Pritsker, L.J. Watters, P.M. Wolfe. (1969) Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 16(1), pp.93-108.
    • (1969) Management Science , vol.16 , Issue.1 , pp. 93-108
    • Pritsker, A.A.B.1    Watters, L.J.2    Wolfe, P.M.3
  • 7
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedules with CAD tools
    • K. McKinney, M. Fischer. (1998) Generating, evaluating and visualizing construction schedules with CAD tools. Automation in Construction, 7(6), pp.433-447.
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 9
    • 68349156647 scopus 로고    scopus 로고
    • A Framework for Multi-dimensional Visualization of Project Control Data
    • March 19-21, Honolulu, Hawaii, USA
    • Anthony D. Songer and Benjamin Hays. (2003) A Framework for Multi-dimensional Visualization of Project Control Data. ASCE Conference Proceeding, March 19-21, Honolulu, Hawaii, USA.
    • (2003) ASCE Conference Proceeding
    • Songer, A.D.1    Hays, B.2
  • 10
    • 85087585973 scopus 로고    scopus 로고
    • A location system with RFID technology in building construction site
    • nd ISARC, 43(1)-(6)
    • nd ISARC, 43(1)-(6).
    • (2005)
    • Chae, S.1    Kano, N.2
  • 12
    • 33749826089 scopus 로고    scopus 로고
    • Generation of a construction planning from a 3D CAD model
    • Bauke de vries and Jeroen M.J. Harink (2007) Generation of a construction planning from a 3D CAD model. Automation in Construction, 16(1), pp.13-18.
    • (2007) Automation in Construction , vol.16 , Issue.1 , pp. 13-18
    • de Vries, B.1    Harink, J.M.J.2
  • 13
    • 33744547057 scopus 로고    scopus 로고
    • Planning and visualization for automated robotic crane erection processes in construction
    • Shih Chung Kang and Eduardo Miranda (2006) Planning and visualization for automated robotic crane erection processes in construction. Automation in Construction, 15(4), pp.398-414.
    • (2006) Automation in Construction , vol.15 , Issue.4 , pp. 398-414
    • Kang, S.C.1    Miranda, E.2
  • 15
    • 58849093542 scopus 로고    scopus 로고
    • 4D Work Planner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts
    • Stanford University, CA
    • Akinci, B., and Fischer, M. (2000) 4D Work Planner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts. Eighth International Conference on Computing in Civil and Building Engineering (ICCCBE-VIII), Stanford University, CA, pp.740-747.
    • (2000) Eighth International Conference on Computing in Civil and Building Engineering (ICCCBE-VIII) , pp. 740-747
    • Akinci, B.1    Fischer, M.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.