-
1
-
-
0032165225
-
Generating, evaluating and visualizing construction schedules with 4D-CAD tools
-
McKinney, K. and Fischer, M. (1998) Generating, evaluating and visualizing construction schedules with 4D-CAD tools. Automation in Construction, 7 (6), pp.433-447.
-
(1998)
Automation in Construction
, vol.7
, Issue.6
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
2
-
-
68349145511
-
Real-time 4D CAD + RFID for Project Progress Management
-
April 5-7, San Diego, California
-
Sangyoon Chin. and Suwon Yoon. (2005) Real-time 4D CAD + RFID for Project Progress Management. ASCE Conference Proceeding, April 5-7, San Diego, California.
-
(2005)
ASCE Conference Proceeding
-
-
Sangyoon, C.1
Yoon, S.2
-
3
-
-
39349114541
-
RFID + 4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings
-
Sangyoon Chin. and Suwon Yoon. (2008) RFID+4D CAD for Progress Management of Structural Steel Works in High-Rise Buildings. Journal of Computing in Civil Engineering, 22(2), pp.74-89.
-
(2008)
Journal of Computing in Civil Engineering
, vol.22
, Issue.2
, pp. 74-89
-
-
Sangyoon, C.1
Yoon, S.2
-
4
-
-
84889492598
-
Integrated and Automated Project Processes in Civil Engineering: Experiences of the Center for Integrated Facility Engineering at Stanford university
-
Blacksburg, VA
-
Kunz, J., Fischer, M., Haymaker, J., and Levitt, R. (2001) Integrated and Automated Project Processes in Civil Engineering: Experiences of the Center for Integrated Facility Engineering at Stanford university. Proceedings from ASCE Specialty Conference, Blacksburg, VA. pp.96-105.
-
(2001)
Proceedings from ASCE Specialty Conference
, pp. 96-105
-
-
Kunz, J.1
Fischer, M.2
Haymaker, J.3
Levitt, R.4
-
5
-
-
0014574409
-
Multiproject scheduling with limited resources: A zero-one programming approach
-
A.A.B. Pritsker, L.J. Watters, P.M. Wolfe. (1969) Multiproject scheduling with limited resources: A zero-one programming approach. Management Science, 16(1), pp.93-108.
-
(1969)
Management Science
, vol.16
, Issue.1
, pp. 93-108
-
-
Pritsker, A.A.B.1
Watters, L.J.2
Wolfe, P.M.3
-
7
-
-
0032165225
-
Generating, evaluating and visualizing construction schedules with CAD tools
-
K. McKinney, M. Fischer. (1998) Generating, evaluating and visualizing construction schedules with CAD tools. Automation in Construction, 7(6), pp.433-447.
-
(1998)
Automation in Construction
, vol.7
, Issue.6
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
8
-
-
33947358295
-
Implementation of 4D visualization as a planning tool in the Indian AEC Industry
-
B. Kanagasabapathi, K. Ananthanarayanan. (2004) Implementation of 4D visualization as a planning tool in the Indian AEC Industry. Journal of Institution of Engineers (India), Architectural Engineering Division, 85(2), pp.35-40.
-
(2004)
Journal of Institution of Engineers (India), Architectural Engineering Division
, vol.85
, Issue.2
, pp. 35-40
-
-
Kanagasabapathi, B.1
Ananthanarayanan, K.2
-
9
-
-
68349156647
-
A Framework for Multi-dimensional Visualization of Project Control Data
-
March 19-21, Honolulu, Hawaii, USA
-
Anthony D. Songer and Benjamin Hays. (2003) A Framework for Multi-dimensional Visualization of Project Control Data. ASCE Conference Proceeding, March 19-21, Honolulu, Hawaii, USA.
-
(2003)
ASCE Conference Proceeding
-
-
Songer, A.D.1
Hays, B.2
-
10
-
-
85087585973
-
A location system with RFID technology in building construction site
-
nd ISARC, 43(1)-(6)
-
nd ISARC, 43(1)-(6).
-
(2005)
-
-
Chae, S.1
Kano, N.2
-
12
-
-
33749826089
-
Generation of a construction planning from a 3D CAD model
-
Bauke de vries and Jeroen M.J. Harink (2007) Generation of a construction planning from a 3D CAD model. Automation in Construction, 16(1), pp.13-18.
-
(2007)
Automation in Construction
, vol.16
, Issue.1
, pp. 13-18
-
-
de Vries, B.1
Harink, J.M.J.2
-
13
-
-
33744547057
-
Planning and visualization for automated robotic crane erection processes in construction
-
Shih Chung Kang and Eduardo Miranda (2006) Planning and visualization for automated robotic crane erection processes in construction. Automation in Construction, 15(4), pp.398-414.
-
(2006)
Automation in Construction
, vol.15
, Issue.4
, pp. 398-414
-
-
Kang, S.C.1
Miranda, E.2
-
14
-
-
0036165741
-
Nonlinear models for predicting Hoisting times of tower crane
-
C.M. Tam, W.T. Leung, D.K. Liu. Nonlinear models for predicting Hoisting times of tower crane, Journal of Computing in Civil Engineering. 16(1), pp.76-81.
-
Journal of Computing in Civil Engineering
, vol.16
, Issue.1
, pp. 76-81
-
-
Tam, C.M.1
Leung, W.T.2
Liu, D.K.3
-
15
-
-
58849093542
-
4D Work Planner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts
-
Stanford University, CA
-
Akinci, B., and Fischer, M. (2000) 4D Work Planner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts. Eighth International Conference on Computing in Civil and Building Engineering (ICCCBE-VIII), Stanford University, CA, pp.740-747.
-
(2000)
Eighth International Conference on Computing in Civil and Building Engineering (ICCCBE-VIII)
, pp. 740-747
-
-
Akinci, B.1
Fischer, M.2
|