메뉴 건너뛰기




Volumn 26, Issue 2, 2012, Pages 151-160

Automated trajectory and path planning analysis based on ultra wideband data

Author keywords

Safety; Trajectory analysis; Ultra wideband; Worker behavior; Workforce tracking; Worksite utilization

Indexed keywords

CONSTRUCTION RESOURCE; CONSTRUCTION SITES; MULTIPLE-PATH; OCCUPANCY GRIDS; OPTIMAL PATHS; OPTIMALITY; PATH GENERATION; PLANNING GRAPHS; SAFETY MANAGERS; SITE OPERATIONS; TRAJECTORY ANALYSIS; TRAJECTORY INFORMATION; TRAVEL PATTERNS; ULTRA-WIDEBAND SENSORS; UWB SIGNALS; WORK SITES; WORK STUDY; WORKER BEHAVIOR;

EID: 84859557026     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000115     Document Type: Article
Times cited : (49)

References (27)
  • 1
    • 42949097433 scopus 로고    scopus 로고
    • Editorial: Sensors in construction and infrastructure management
    • 1874-4753
    • Akinci, B., and Anumba, C. (2008). Editorial: Sensors in construction and infrastructure management. ITcon 1874-4753, 13, 69-70.
    • (2008) ITcon , vol.13 , pp. 69-70
    • Akinci, B.1    Anumba, C.2
  • 2
    • 0027242479 scopus 로고
    • Motion and path control for robotic excavation
    • 0893-1321, 10.1061/(ASCE)0893-1321(1993)6:1(1)
    • Bernold, E. L. (1993). Motion and path control for robotic excavation. J. Aerosp. Eng. 0893-1321, 6 (1), 1-18. 10.1061/(ASCE)0893-1321(1993)6:1(1)
    • (1993) J. Aerosp. Eng. , vol.6 , Issue.1 , pp. 1-18
    • Bernold, E.L.1
  • 4
    • 70449708995 scopus 로고    scopus 로고
    • Error modeling for an untethered ultra-wideband system for construction indoor asset tracking
    • 0926-5805.
    • Cho, Y. K., Youn, J. H., and Martinez, D. (2010). Error modeling for an untethered ultra-wideband system for construction indoor asset tracking. Autom. Constr. 0926-5805, 19 (1), 43-54.
    • (2010) Autom. Constr. , vol.19 , Issue.1 , pp. 43-54
    • Cho, Y.K.1    Youn, J.H.2    Martinez, D.3
  • 5
    • 84859558443 scopus 로고    scopus 로고
    • CII. . Re No. 252-1, Construction Industry Institute, Univ. of Texas at, Austin, TX.
    • CII. (2010). Craft productivity program-Phase 1. Rep. No. 252-1, Construction Industry Institute, Univ. of Texas at, Austin, TX.
    • (2010) Craft Productivity Program-Phase 1
  • 7
    • 0034937996 scopus 로고    scopus 로고
    • An application of the Internet-based project management system
    • DOI 10.1016/S0926-5805(99)00037-0, PII S0926580599000370
    • Deng, Z., Lib, H., Tama, C. M., Shenb, Q. P., and Love, P. E. D. (2001). An application of the internet-based project management system. Autom. Constr. 0926-5805, 10 (2), 239-246. 10.1016/S0926-5805(99)00037-0 (Pubitemid 32636813)
    • (2001) Automation in Construction , vol.10 , Issue.2 , pp. 239-246
    • Deng, Z.M.1    Li, H.2    Tam, C.M.3    Shen, Q.P.4    Love, P.E.D.5
  • 9
    • 68049115666 scopus 로고    scopus 로고
    • Assessing the impact of automated materials tracking technologies on construction craft productivity
    • 10.1016/j.autcon.2009.04.001 0926-5805
    • Grau, T. D., Caldas, C. H., Haas, C. T., Goodrum, P. M., and Gong, J. (2009). Assessing the impact of automated materials tracking technologies on construction craft productivity. Autom. Constr., 18, 903-911. 10.1016/j.autcon.2009.04.001 0926-5805
    • (2009) Autom. Constr. , vol.18 , pp. 903-911
    • Grau, T.D.1    Caldas, C.H.2    Haas, C.T.3    Goodrum, P.M.4    Gong, J.5
  • 10
    • 0035482195 scopus 로고    scopus 로고
    • Visualizing simulated construction operations in 3D
    • DOI 10.1061/(ASCE)0887-3801(2001)15:4(329), Reportnr 22118
    • Kamat, V. R., and Martinez, J. C. (2001). Visualizing simulated construction operations in 3D. J. Comput. Civ. Eng., 15 (4), 329-337. 0887-3801 10.1061/(ASCE)0887-3801(2001)15:4(329) (Pubitemid 33073892)
    • (2001) Journal of Computing in Civil Engineering , vol.15 , Issue.4 , pp. 329-327
    • Kamat, V.R.1    Martinez, J.C.2
  • 11
    • 63549085077 scopus 로고    scopus 로고
    • Evaluation of position tracking technologies for user localization in indoor construction environments
    • 10.1016/j.autcon.2008.10.011 0926-5805
    • Khoury, H. M., and Kamat, V. R. (2009). Evaluation of position tracking technologies for user localization in indoor construction environments. Autom. Constr., 18, 444-457. 10.1016/j.autcon.2008.10.011 0926-5805
    • (2009) Autom. Constr. , vol.18 , pp. 444-457
    • Khoury, H.M.1    Kamat, V.R.2
  • 12
    • 2042528491 scopus 로고    scopus 로고
    • Spatial model for path planning of multiple mobile construction robots
    • DOI 10.1111/j.1467-8667.2004.00351.x
    • Lee, S., and Adams, T. (2004). Spatial model for path planning of multiple mobile construction robots. Comput. Aided Civ. Infrastruct. Eng., 19 (4), 231-245. 1093-9687 10.1111/j.1467-8667.2004.00351.x (Pubitemid 38536452)
    • (2004) Computer-Aided Civil and Infrastructure Engineering , vol.19 , Issue.4 , pp. 231-245
    • Lee, S.1    Adams, T.M.2
  • 14
    • 84859524196 scopus 로고    scopus 로고
    • National Institute for Occupational Safety and Health (NIOSH). (Goal 1: Reduce the major risks associated with traumatic injuries and fatalities in construction, (Dec. 1, 2007).
    • National Institute for Occupational Safety and Health (NIOSH). (2007) Goal 1: Reduce the major risks associated with traumatic injuries and fatalities in construction, http://www.cdc.gov/niosh/nas/construction/pdfs/04- CoNAGoal1OverviewFosbroke-Final-wotxt.pdf (Dec. 1, 2007).
    • (2007)
  • 15
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research issues in automated project performance control (APPC)
    • 0926-5805 10.1016/j.autcon.2006.08.001
    • Navon, R., and Sacks, R. (2007). Assessing research issues in automated project performance control (APPC). Autom. Constr., 16 (4), 474-484. 0926-5805 10.1016/j.autcon.2006.08.001
    • (2007) Autom. Constr. , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 16
    • 79957489773 scopus 로고    scopus 로고
    • Methods for static and dynamic performance evaluation of commercially-available ultra wideband tracking systems
    • 10.1016/j.autcon.2010.11.018 0926-5805
    • Saidi, K., Teizer, J., Franaszek, M., and Lytle, A. (2011). Methods for static and dynamic performance evaluation of commercially-available ultra wideband tracking systems. Autom. Constr., 20 (5), 519-530. 10.1016/j.autcon. 2010.11.018 0926-5805
    • (2011) Autom. Constr. , vol.20 , Issue.5 , pp. 519-530
    • Saidi, K.1    Teizer, J.2    Franaszek, M.3    Lytle, A.4
  • 17
    • 4344717496 scopus 로고    scopus 로고
    • A fuzzy based multi-objective path planning of construction sites
    • 10.1016/j.autcon.2004.04.012 0926-5805
    • Soltani, A. R., and Fernando, T. (2004). A fuzzy based multi-objective path planning of construction sites. Autom. Constr., 13 (6), 717-734. 10.1016/j.autcon.2004.04.012 0926-5805
    • (2004) Autom. Constr. , vol.13 , Issue.6 , pp. 717-734
    • Soltani, A.R.1    Fernando, T.2
  • 18
    • 77955716869 scopus 로고    scopus 로고
    • Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
    • 0926-5805 10.1016/j.autcon.2010.02.009
    • Teizer, J., Allread, B., Fullerton, C., and Hinze, J. (2010). Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system. Autom. Constr., 19 (5), 630-640. 0926-5805 10.1016/j.autcon.2010. 02.009
    • (2010) Autom. Constr. , vol.19 , Issue.5 , pp. 630-640
    • Teizer, J.1    Allread, B.2    Fullerton, C.3    Hinze, J.4
  • 19
    • 35348874797 scopus 로고    scopus 로고
    • Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
    • DOI 10.1061/(ASCE)0733-9364(2007)133:11(880)
    • Teizer, J., Caldas, C., and Haas, C. (2007 a). Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources. J. Constr. Eng. Manage., 133 (11), 880-888. 10.1061/(ASCE)0733-9364(2007)133:11(880) 0733-9364 (Pubitemid 47587931)
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.11 , pp. 880-888
    • Teizer, J.1    Caldas, C.H.2    Haas, C.T.3
  • 20
    • 84862999765 scopus 로고    scopus 로고
    • Rapid automated monitoring of construction site activities using ultra-wideband
    • (b). ., International Association for Automation and Robotics in Construction (IAARC), Eindhoven, Netherlands.
    • Teizer, J., Lao, D., and Sofer, M. (2007 b). Rapid automated monitoring of construction site activities using ultra-wideband. Proc., Int. Symp. of Automation and Robotics in Construction, International Association for Automation and Robotics in Construction (IAARC), Eindhoven, Netherlands, 23-28.
    • (2007) Proc., Int. Symp. of Automation and Robotics in Construction , pp. 23-28
    • Teizer, J.1    Lao, D.2    Sofer, M.3
  • 21
    • 84862993864 scopus 로고    scopus 로고
    • Analyzing the travel patterns of construction workers
    • International Association for Automation and Robotics in Construction (IAARC), Eindhoven, Netherlands.
    • Teizer, J., Mantripragada, U., and Venugopal, M. (2008). Analyzing the travel patterns of construction workers. Proc., Int. Symp. of Automation and Robotics in Construction, International Association for Automation and Robotics in Construction (IAARC), Eindhoven, Netherlands.
    • (2008) Proc., Int. Symp. of Automation and Robotics in Construction
    • Teizer, J.1    Mantripragada, U.2    Venugopal, M.3
  • 22
    • 0034325173 scopus 로고    scopus 로고
    • Interactive path planning for multi-equipment landfill operations
    • 10.1016/S0926-5805(00)00073-X 0926-5805
    • Tserng, H. P., Ran, B., and Russell, J. S. (2000). Interactive path planning for multi-equipment landfill operations. Autom. Constr., 10, 155-168. 10.1016/S0926-5805(00)00073-X 0926-5805
    • (2000) Autom. Constr. , vol.10 , pp. 155-168
    • Tserng, H.P.1    Ran, B.2    Russell, J.S.3
  • 23
    • 84859536117 scopus 로고    scopus 로고
    • Owners join effort to improve industry productivity
    • Dec. 12.
    • Tuchman, J. (2009). Owners join effort to improve industry productivity. Engineering News Record, Dec. 12.
    • (2009) Engineering News Record
    • Tuchman, J.1
  • 24
    • 77953959509 scopus 로고    scopus 로고
    • Large corporations are attempting to meet the industry halfway on issues of staff shortages and risk
    • Nov. 21.
    • Tulacz, G., and Armistead, T. (2007). Large corporations are attempting to meet the industry halfway on issues of staff shortages and risk. Engineering News Record, Nov. 21.
    • (2007) Engineering News Record
    • Tulacz, G.1    Armistead, T.2
  • 25
    • 45749131570 scopus 로고
    • Routing large vehicles on industrial construction sites
    • 10.1061/(ASCE)0733-9364(1995)121:1(1) 0733-9364
    • Varghese, K., and O'Connor, J. T. (1995). Routing large vehicles on industrial construction sites. J. Constr. Eng. Manage., 121 (1), 1-12. 10.1061/(ASCE)0733-9364(1995)121:1(1) 0733-9364
    • (1995) J. Constr. Eng. Manage. , vol.121 , Issue.1 , pp. 1-12
    • Varghese, K.1    O'Connor, J.T.2
  • 27
    • 70449558586 scopus 로고    scopus 로고
    • WPI precision personnel locator system: Antenna geometry estimation using a robust multilateralization technique
    • Institute of Navigation (ION), Manassas, VA.
    • Woodacre, B., Cyganski, D., Duckworth, R. J., and Amendolare, V. (2009). WPI precision personnel locator system: Antenna geometry estimation using a robust multilateralization technique. Proc., Int. Technical Meeting of the Institute of Navigation, Institute of Navigation (ION), Manassas, VA.
    • (2009) Proc., Int. Technical Meeting of the Institute of Navigation
    • Woodacre, B.1    Cyganski, D.2    Duckworth, R.J.3    Amendolare, V.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.