-
1
-
-
35348874797
-
Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources
-
J. Teizer, C.H. Caldas, and C.T. Haas Real-time three-dimensional occupancy grid modeling for the detection and tracking of construction resources Journal of Construction Engineering and Management 133 11 2007 880 888
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.11
, pp. 880-888
-
-
Teizer, J.1
Caldas, C.H.2
Haas, C.T.3
-
2
-
-
58149259941
-
Methodology for automating the identification and localization of construction components on industrial projects
-
D. Grau, and C.H. Caldas Methodology for automating the identification and localization of construction components on industrial projects ASCE Journal of Computing in Civil Engineering 23 1 2009 3 13
-
(2009)
ASCE Journal of Computing in Civil Engineering
, vol.23
, Issue.1
, pp. 3-13
-
-
Grau, D.1
Caldas, C.H.2
-
3
-
-
68049115666
-
Assessing the impact of materials tracking technologies on construction craft productivity
-
D. Grau, C.H. Caldas, C.T. Haas, P.M. Goodrum, and J. Gong Assessing the impact of materials tracking technologies on construction craft productivity Journal of Automation in Construction 18 2009 903 911
-
(2009)
Journal of Automation in Construction
, vol.18
, pp. 903-911
-
-
Grau, D.1
Caldas, C.H.2
Haas, C.T.3
Goodrum, P.M.4
Gong, J.5
-
4
-
-
38649103110
-
Automated retrieval of 3D CAD model objects in construction range images
-
F. Bosche, and C.T. Haas Automated retrieval of 3D CAD model objects in construction range images Journal of Automation in Construction 17 4 2008 499 512
-
(2008)
Journal of Automation in Construction
, vol.17
, Issue.4
, pp. 499-512
-
-
Bosche, F.1
Haas, C.T.2
-
5
-
-
32944467411
-
Interpretation of automatically monitored lifting equipment data for project control
-
R. Sacks, R. Navon, and I. Brodetskaia Interpretation of automatically monitored lifting equipment data for project control Journal of Computing in Civil Engineering 20 2 2006 111 120
-
(2006)
Journal of Computing in Civil Engineering
, vol.20
, Issue.2
, pp. 111-120
-
-
Sacks, R.1
Navon, R.2
Brodetskaia, I.3
-
6
-
-
61349190359
-
Ultrawideband for Automated Real-time Three-Dimensional Location Sensing for Workforce, Equipment, and Material Positioning and Tracking
-
J. Teizer, M. Venugopal, and A. Walia Ultrawideband for Automated Real-time Three-Dimensional Location Sensing for Workforce, Equipment, and Material Positioning and Tracking Transportation Research Record, Transportation Research Board of the National Academies, Washington D.C 2008 56 64
-
(2008)
Transportation Research Record, Transportation Research Board of the National Academies, Washington D.C
, pp. 56-64
-
-
Teizer, J.1
Venugopal, M.2
Walia, A.3
-
7
-
-
79960182786
-
Performance-based evaluation of RFID-based Indoor Location Sensing Solutions for the Built Environment
-
N. Li, and B. Becerik-Gerber Performance-based evaluation of RFID-based Indoor Location Sensing Solutions for the Built Environment Journal of Advanced Engineering Informatics. 25 3 2011 535 546
-
(2011)
Journal of Advanced Engineering Informatics.
, vol.25
, Issue.3
, pp. 535-546
-
-
Li, N.1
Becerik-Gerber, B.2
-
8
-
-
80053648019
-
Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments
-
T. Cheng, M. Venugopal, J. Teizer, and P.A. Vela Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments Automation in Construction 20 8 2011 1173 1184
-
(2011)
Automation in Construction
, vol.20
, Issue.8
, pp. 1173-1184
-
-
Cheng, T.1
Venugopal, M.2
Teizer, J.3
Vela, P.A.4
-
9
-
-
33845728532
-
Tracking components and maintenance history within a facility utilizing radio frequency identification technology
-
E. Ergen, B. Akinci, B. East, and J. Kirby Tracking components and maintenance history within a facility utilizing radio frequency identification technology Journal of Computing in Civil Engineering 21 1 2007 11 20
-
(2007)
Journal of Computing in Civil Engineering
, vol.21
, Issue.1
, pp. 11-20
-
-
Ergen, E.1
Akinci, B.2
East, B.3
Kirby, J.4
-
10
-
-
73349132668
-
Effective monitoring of the concrete pouring operation in an RFID-based environment
-
S. Moon, and B. Yang Effective monitoring of the concrete pouring operation in an RFID-based environment Journal of Computing in Civil Engineering 24 1 2010 108 116
-
(2010)
Journal of Computing in Civil Engineering
, vol.24
, Issue.1
, pp. 108-116
-
-
Moon, S.1
Yang, B.2
-
11
-
-
70449368210
-
Real World Implementation of Belief Function Theory to Detect Dislocation of Materials in Construction
-
S.N. Razavi, C.T. Haas, P. Vanheeghe, and E. Duflos Real World Implementation of Belief Function Theory to Detect Dislocation of Materials in Construction 12th International Conference on Information Fusion, Seattle, WA, USA 2009 748 755
-
(2009)
12th International Conference on Information Fusion, Seattle, WA, USA
, pp. 748-755
-
-
Razavi, S.N.1
Haas, C.T.2
Vanheeghe, P.3
Duflos, E.4
-
12
-
-
29144515805
-
Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects
-
J. Song, C.T. Haas, C. Caldas, E. Ergen, and B. Akinci Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects Automation in Construction 15 2 2006 166 177
-
(2006)
Automation in Construction
, vol.15
, Issue.2
, pp. 166-177
-
-
Song, J.1
Haas, C.T.2
Caldas, C.3
Ergen, E.4
Akinci, B.5
-
13
-
-
79960638196
-
Integrating automated data acquisition technologies for progress reporting of construction projects
-
S. El-Omari, and O. Moselhi Integrating automated data acquisition technologies for progress reporting of construction projects Journal of Automation in Construction 20 6 2011 699 705
-
(2011)
Journal of Automation in Construction
, vol.20
, Issue.6
, pp. 699-705
-
-
El-Omari, S.1
Moselhi, O.2
-
14
-
-
0042631497
-
Ultra-wideband and its capabilities
-
X. Gu, and L. Taylor Ultra-wideband and its capabilities BT Technology Journal 21 2003 56 66
-
(2003)
BT Technology Journal
, vol.21
, pp. 56-66
-
-
Gu, X.1
Taylor, L.2
-
15
-
-
70449708995
-
Error modeling for an untethered ultra-wideband system for construction indoor asset tracking
-
Y. Cho, J.H. Youn, and D. Martinez Error modeling for an untethered ultra-wideband system for construction indoor asset tracking Journal of Automation in Construction 19 2010 43 54
-
(2010)
Journal of Automation in Construction
, vol.19
, pp. 43-54
-
-
Cho, Y.1
Youn, J.H.2
Martinez, D.3
-
16
-
-
0036028115
-
Integrating barcode and GIS for monitoring construction progress
-
M. Cheng, and J. Chen Integrating barcode and GIS for monitoring construction progress Journal of Automation in Construction 11 1 2002 23 33
-
(2002)
Journal of Automation in Construction
, vol.11
, Issue.1
, pp. 23-33
-
-
Cheng, M.1
Chen, J.2
-
17
-
-
84900036656
-
Recent Advanced in Ultra Wideband Communications Systems
-
R.J. Fontana, A. Ameti, E. Richley, L. Beard, and D. Guy Recent Advanced in Ultra Wideband Communications Systems IEEE Conference on Ultra Wideband Systems and Technologies 2003 369 373
-
(2003)
IEEE Conference on Ultra Wideband Systems and Technologies
, pp. 369-373
-
-
Fontana, R.J.1
Ameti, A.2
Richley, E.3
Beard, L.4
Guy, D.5
-
19
-
-
63549085077
-
Evaluation of position tracking technologies for user localization in indoor construction environments
-
H.M. Khoury, and V.R. Kamat Evaluation of position tracking technologies for user localization in indoor construction environments Journal of Automation in Construction 18 4 2009 444 457
-
(2009)
Journal of Automation in Construction
, vol.18
, Issue.4
, pp. 444-457
-
-
Khoury, H.M.1
Kamat, V.R.2
-
21
-
-
84860306962
-
-
accessed on 28 May 2011
-
Ubisense® Company Product Fact Sheets http://www.ubisense.net/en/ 2011 accessed on 28 May 2011
-
(2011)
Product Fact Sheets
-
-
Company, U.1
-
22
-
-
77955716869
-
Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system
-
J. Teizer, B.S. Allread, C.E. Fullerton, and J.W. Hinze Autonomous pro-active real-time construction worker and equipment operator proximity safety alert system Automation in Construction 19 5 2010 630 640
-
(2010)
Automation in Construction
, vol.19
, Issue.5
, pp. 630-640
-
-
Teizer, J.1
Allread, B.S.2
Fullerton, C.E.3
Hinze, J.W.4
-
23
-
-
70350139502
-
Lifecycle management of facilities components using radio frequency identification and building information model
-
A. Motamedi, and A. Hammad Lifecycle management of facilities components using radio frequency identification and building information model The Electronic Journal of Information Technology in Construction 14 2009 238 262
-
(2009)
The Electronic Journal of Information Technology in Construction
, vol.14
, pp. 238-262
-
-
Motamedi, A.1
Hammad, A.2
-
25
-
-
84855819334
-
Evaluation of Ultra-Wideband Technology for Position Location and Progress Tracking in Indoor Construction Environments
-
June 14-17
-
A. Aryan, A. Shahi, J.S. West, C.T. Haas, R.C.G. Haas, and G. Caldwell Evaluation of Ultra-Wideband Technology for Position Location and Progress Tracking in Indoor Construction Environments 3rd International/9th Construction Specialty Conference Ottawa, Ontario, Canada June 14-17, 2011
-
(2011)
3rd International/9th Construction Specialty Conference Ottawa, Ontario, Canada
-
-
Aryan, A.1
Shahi, A.2
West, J.S.3
Haas, C.T.4
Haas, R.C.G.5
Caldwell, G.6
|