메뉴 건너뛰기




Volumn 20, Issue 2, 2006, Pages 111-120

Interpretation of automatically monitored lifting equipment data for project control

Author keywords

Automation; Construction equipment; Data collection; Data processing; Monitoring; Project management

Indexed keywords

CONSTRUCTION ACTIVITIES; DATA COLLECTION; EQUIPMENT OPERATION;

EID: 32944467411     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0887-3801(2006)20:2(111)     Document Type: Article
Times cited : (12)

References (31)
  • 1
    • 25144515330 scopus 로고    scopus 로고
    • Representation and integration of as-built information to IFC based product and process models for automated assessment of as-built conditions
    • International Association for Automation and Robotics in Construction, München, Germany
    • Akinci, B., and Boukamp, F. (2002). " Representation and integration of as-built information to IFC based product and process models for automated assessment of as-built conditions.. " Proc., 19th Int. Symp. on Automation and Robotics in Construction, International Association for Automation and Robotics in Construction, München, Germany, 543-550.
    • (2002) Proc., 19th Int. Symp. on Automation and Robotics in Construction , pp. 543-550
    • Akinci, B.1    Boukamp, F.2
  • 2
    • 0027242479 scopus 로고
    • Motion and path control for robotic excavation
    • Bernold, L. E. (1993). " Motion and path control for robotic excavation.. " J. Aerosp. Eng., 6 (1), 1-18.
    • (1993) J. Aerosp. Eng. , vol.6 , Issue.1 , pp. 1-18
    • Bernold, L.E.1
  • 3
    • 0028516982 scopus 로고
    • RATAS project-Developing an infrastructure for computer-integrated construction
    • Bjork, B.-C. (1994). " RATAS project-Developing an infrastructure for computer-integrated construction.. " J. Comput. Civ. Eng., 8 (4), 401-419.
    • (1994) J. Comput. Civ. Eng. , vol.8 , Issue.4 , pp. 401-419
    • Bjork, B.-C.1
  • 5
    • 0032047054 scopus 로고    scopus 로고
    • Fuzzy pattern recognition model for diagnosing cracks in RC structures
    • Chao, C.-J., and Cheng, F.-P. (1998). " Fuzzy pattern recognition model for diagnosing cracks in RC structures.. " J. Comput. Civ. Eng., 12 (2), 111-119.
    • (1998) J. Comput. Civ. Eng. , vol.12 , Issue.2 , pp. 111-119
    • Chao, C.-J.1    Cheng, F.-P.2
  • 6
    • 0036028115 scopus 로고    scopus 로고
    • Integrating barcode and GIS for monitoring construction progress
    • Cheng, M.-Y., and Chen, J.-C. (2002). " Integrating barcode and GIS for monitoring construction progress.. " Autom. Constr., 11 (1), 23-33.
    • (2002) Autom. Constr. , vol.11 , Issue.1 , pp. 23-33
    • Cheng, M.-Y.1    Chen, J.-C.2
  • 7
    • 84858535920 scopus 로고    scopus 로고
    • Chrysostomou, V. (2003). COMPASS-IP, 〈 http://www.compass-ip.com/ Default.aspx 〉 (Nov. 11, 2003).
    • (2003)
    • Chrysostomou, V.1
  • 8
    • 84858537042 scopus 로고    scopus 로고
    • Computer-Integrated Manufacturing/Steel Integration Standards (CIM/CIS).
    • Computer-Integrated Manufacturing/Steel Integration Standards (CIM/CIS). (2004). " CIS/2.. "CIS/2@GT, 〈 http://www.coa.gatech.edu/~aisc 〉 (Jan. 20, 2004).
    • (2004) CIS/2
  • 9
    • 0029196815 scopus 로고
    • Simulation of automated data collection in buildings
    • Davidson, I. N., and Skibniewski, M. J. (1995). " Simulation of automated data collection in buildings.. " J. Comput. Civ. Eng., 9 (1), 9-20.
    • (1995) J. Comput. Civ. Eng. , vol.9 , Issue.1 , pp. 9-20
    • Davidson, I.N.1    Skibniewski, M.J.2
  • 11
    • 2942735084 scopus 로고    scopus 로고
    • Development and implementation of an advanced IT strategy for the North American precast concrete industry
    • Eastman, C. M., Sacks, R., and Lee, G. (2003). " Development and implementation of an advanced IT strategy for the North American precast concrete industry.. " Int. J. Constr. Inf. Technol., 8, 247-262.
    • (2003) Int. J. Constr. Inf. Technol. , vol.8 , pp. 247-262
    • Eastman, C.M.1    Sacks, R.2    Lee, G.3
  • 14
    • 0020274607 scopus 로고
    • SPERIL: An expert system for damage assessment of existing structures
    • Elsevier, Berlin
    • Ishizuka, M., Fu, K. S., and Yao, J. T. P. (1982). " SPERIL: An expert system for damage assessment of existing structures.. " Proc., 6th Int. Conf. on Pattern Recognition, Elsevier, Berlin, 932-937.
    • (1982) Proc., 6th Int. Conf. on Pattern Recognition , pp. 932-937
    • Ishizuka, M.1    Fu, K.S.2    Yao, J.T.P.3
  • 16
    • 13944281379 scopus 로고    scopus 로고
    • Implementing radiofrequency identification in the construction process
    • Jaselskis, E. J., and El-Misalami, T. (2003). " Implementing radiofrequency identification in the construction process.. " J. Constr. Eng. Manage., 129 (6), 680-688.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.6 , pp. 680-688
    • Jaselskis, E.J.1    El-Misalami, T.2
  • 17
    • 84858536282 scopus 로고    scopus 로고
    • Laiserin, J. (2002). " Comparing pommes and naranjas.. " The LaiserinLetter, 〈 http://www.laiserin.com/features/issue15/feature01.php 〉 (Dec. 15, 2003).
    • (2002) Comparing Pommes and Naranjas
    • Laiserin, J.1
  • 18
    • 14544298805 scopus 로고    scopus 로고
    • Automated project performance control (APPC) of construction projects
    • Navon, R. (2004). " Automated project performance control (APPC) of construction projects.. " Autom. Constr., 14 (4), 467-476.
    • (2004) Autom. Constr. , vol.14 , Issue.4 , pp. 467-476
    • Navon, R.1
  • 19
    • 13944281377 scopus 로고    scopus 로고
    • Can labor inputs be measured and controlled automatically?
    • Navon, R., and Goldschmidt, E. (2003). " Can labor inputs be measured and controlled automatically? " J. Constr. Eng. Manage., 129 (4), 437-445.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 437-445
    • Navon, R.1    Goldschmidt, E.2
  • 20
    • 15944411816 scopus 로고    scopus 로고
    • Field experiments in automated monitoring of road construction
    • Navon, R., and Shpatnitsky, Y. (2005). " Field experiments in automated monitoring of road construction.. " J. Constr. Eng. Manage., 131 (4), 487-493.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4 , pp. 487-493
    • Navon, R.1    Shpatnitsky, Y.2
  • 21
    • 0343193299 scopus 로고    scopus 로고
    • High-precision application of GPS in the field of real-time equipment positioning
    • Peyret, F., Betaille, D., and Hintzy, G. (2000). " High-precision application of GPS in the field of real-time equipment positioning.. " Autom. Constr., 9, 299-314.
    • (2000) Autom. Constr. , vol.9 , pp. 299-314
    • Peyret, F.1    Betaille, D.2    Hintzy, G.3
  • 22
    • 84858533490 scopus 로고    scopus 로고
    • Potain.
    • Potain. (2004a). Dialog Visu, 〈 http://www.potain.com/products/ proRange_home.cfm?objectID=000D8E06-72C2-1ABF- B59480F03BE70000&selectedHeadingID=EQUIPEMENT 〉 (Oct. 15, 2004).
    • (2004)
  • 23
    • 84858546607 scopus 로고    scopus 로고
    • Potain.
    • Potain. (2004b). Top Tracing, 〈 http://www.potain.com/products/ prdRange_home.cfm?objectID=0001A406-758C-1ABF- B59480F03BE70000&selectedHeadingID=EQUIPEMENT 〉 (Oct. 15, 2004).
    • (2004)
  • 24
    • 0002941762 scopus 로고    scopus 로고
    • Issues in the development and implementation of a building project model for an automated building system
    • Sacks, R. (1998). " Issues in the development and implementation of a building project model for an automated building system.. " Int. J. Constr. Inf. Technol., 5 (2), 75-101.
    • (1998) Int. J. Constr. Inf. Technol. , vol.5 , Issue.2 , pp. 75-101
    • Sacks, R.1
  • 25
    • 1642618587 scopus 로고    scopus 로고
    • Parametric 3D modeling in building construction with examples from precast concrete
    • Sacks, R., Eastman, C. M., and Lee, G. (2004). " Parametric 3D modeling in building construction with examples from precast concrete.. " Autom. Constr., 13, 291-312.
    • (2004) Autom. Constr. , vol.13 , pp. 291-312
    • Sacks, R.1    Eastman, C.M.2    Lee, G.3
  • 26
    • 18744383106 scopus 로고    scopus 로고
    • Feasibility of automated monitoring of lifting equipment in support of project control
    • Sacks, R., Navon, R., Brodetskaia, I., and Shapira, A. (2005). " Feasibility of automated monitoring of lifting equipment in support of project control.. " J. Constr. Eng. Manage., 131 (5), 604-614.
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.5 , pp. 604-614
    • Sacks, R.1    Navon, R.2    Brodetskaia, I.3    Shapira, A.4
  • 27
    • 2942739545 scopus 로고    scopus 로고
    • Building project model support for automated labor monitoring
    • Sacks, R., Navon, R., and Goldschmidt, E. (2003). " Building project model support for automated labor monitoring.. " J. Comput. Civ. Eng., 17 (1), 19-27.
    • (2003) J. Comput. Civ. Eng. , vol.17 , Issue.1 , pp. 19-27
    • Sacks, R.1    Navon, R.2    Goldschmidt, E.3
  • 28
    • 14544283775 scopus 로고    scopus 로고
    • Report of the NIST workshop on data exchange standards at the construction job site
    • G.Maas and F.van Gassel, eds., International Association for Automation and Robotics in Construction, Alexandria, Va.
    • Saidi, K. S., Lytle, A. M., and Stone, W. C. (2003). " Report of the NIST workshop on data exchange standards at the construction job site.. " Proc., 20th Int. Symp. on Automation and Robotics in Construction, G. Maas, and, F. van Gassel, eds., International Association for Automation and Robotics in Construction, Alexandria, Va., 617-622.
    • (2003) Proc., 20th Int. Symp. on Automation and Robotics in Construction , pp. 617-622
    • Saidi, K.S.1    Lytle, A.M.2    Stone, W.C.3
  • 29
    • 31844443085 scopus 로고    scopus 로고
    • Toward the ultimate construction site sensor
    • International Association for Automation and Robotics in Construction, Alexandria, Va.
    • Stone, W. C., and Juberts, M. (2002). " Toward the ultimate construction site sensor.. " Proc., 19th Int. Symp. on Automation and Robotics in Construction, International Association for Automation and Robotics in Construction, Alexandria, Va., 263-268.
    • (2002) Proc., 19th Int. Symp. on Automation and Robotics in Construction , pp. 263-268
    • Stone, W.C.1    Juberts, M.2
  • 30
    • 84858548556 scopus 로고    scopus 로고
    • Tekla.
    • Tekla. (2004). Tekla Structures v10.2, 〈 http://www.tekla.com/ user_nf/default.asp?r=0&site=33 〉 (Nov. 17, 2004).
    • (2004)


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.