Volumn 131, Issue 5, 2005, Pages 604-614

Feasibility of automated monitoring of lifting equipment in support of project control

Author keywords

Automation; Construction equipment; Cranes; Data collection; Information management; Project management

Indexed keywords

AUTOMATION; BUILDING MATERIALS; BUILDINGS; CRANES; DATA ACQUISITION; ELECTRONIC EQUIPMENT; INFORMATION MANAGEMENT; MATHEMATICAL MODELS; PROJECT MANAGEMENT;

EID: 18744383106     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:5(604)     Document Type: Article
Times cited : (71)

References (28)
  • 1
    • 0036028115 scopus 로고    scopus 로고
    • Integrating barcode and GIS for monitoring construction progress
    • Cheng, M. Y., and Chen, J. C. (2002). "Integrating barcode and GIS for monitoring construction progress." Autom. Constr. 11, 23-33.
    • (2002) Autom. Constr. , vol.11 , pp. 23-33
    • Cheng, M.Y.1    Chen, J.C.2
  • 2
    • 18744411351 scopus 로고    scopus 로고
    • November 11
    • Chysostomou, V. (2003). "COMPASS-IP." 〈http://www.compass- ip.com/ Default.aspx〉 (November 11, 2003).
    • (2003) COMPASS-IP
  • 4
    • 18744387518 scopus 로고    scopus 로고
    • Crane equipment
    • Crane Equipment
    • Crane Equipment. (2001). "Crane equipment." Cranes Today, 314, 44-44.
    • (2001) Cranes Today , vol.314 , pp. 44-44
  • 6
    • 2942735084 scopus 로고    scopus 로고
    • Development and implementation of an advanced IT strategy for the North American precast concrete industry
    • Eastman, C. M., Sacks, R., and Lee, G. (2003). "Development and Implementation of an advanced IT strategy for the North American precast concrete industry." Int. J. Constr. Inf. Technol., 8, 247-262.
    • (2003) Int. J. Constr. Inf. Technol. , vol.8 , pp. 247-262
    • Eastman, C.M.1    Sacks, R.2    Lee, G.3
  • 8
    • 0011478702 scopus 로고    scopus 로고
    • User survey on a WAN portfolio MIS used for portfolio/project management in Hong Kong
    • White River, South Africa
    • Futcher, K. (2001). "User survey on a WAN portfolio MIS used for portfolio/project management in Hong Kong." Proc., IT in Construc tion in Africa, CIB W78 Workshop, White River, South Africa, 44-1-44-14.
    • (2001) Proc., IT in Construc Tion in Africa, CIB W78 Workshop , pp. 441-4414
    • Futcher, K.1
  • 9
    • 18744416356 scopus 로고    scopus 로고
    • Black boxes
    • Greeman, A. (2002). "Black boxes." Cranes Today, (334), 45-49.
    • (2002) Cranes Today , vol.334 , pp. 45-49
    • Greeman, A.1
  • 15
    • 13944281379 scopus 로고    scopus 로고
    • Implementing radio frequency identification in the construction process
    • Jaselskis, E. J., and El-Misalami, T. (2003). "Implementing radio frequency identification in the construction process." J. Constr. Eng. Manage. 129(6), 680-688.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.6 , pp. 680-688
    • Jaselskis, E.J.1    El-Misalami, T.2
  • 16
    • 18744415815 scopus 로고    scopus 로고
    • Comparing pommes and naranjas
    • December 16, 2003
    • Laiserin, J. (2002). "Comparing pommes and naranjas." The LaiserinLetter, Issue 15, 〈http://www.laiserin.com/features/issue15/ feature01.php〉, (December 16, 2003).
    • (2002) The LaiserinLetter , Issue.15
    • Laiserin, J.1
  • 17
    • 13944281377 scopus 로고    scopus 로고
    • Can labor inputs be measured and controlled automatically?
    • Navon, R., and Goldschmidt, E. (2003a). "Can labor inputs be measured and controlled automatically?" J. Constr. Eng. Manage. 129(4), 437-445.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.4 , pp. 437-445
    • Navon, R.1    Goldschmidt, E.2
  • 18
    • 0037332784 scopus 로고    scopus 로고
    • Monitoring labor inputs: "Automated-data-collection model and enabling technologies
    • Navon, R., and Goldschmidt, E. (2003b). "Monitoring labor inputs: "Automated-data-collection model and enabling technologies." Autom. Constr. 12(2), 185-199.
    • (2003) Autom. Constr. , vol.12 , Issue.2 , pp. 185-199
    • Navon, R.1    Goldschmidt, E.2
  • 19
    • 0346639292 scopus 로고    scopus 로고
    • A concept proving prototype of automated earthmoving control
    • in press
    • Navon, R., Goldschmidt, E., and Shpatnitsky, Y. (2004). "A concept proving prototype of automated earthmoving control." Autom. Constr., in press.
    • (2004) Autom. Constr.
    • Navon, R.1    Goldschmidt, E.2    Shpatnitsky, Y.3
  • 20
    • 15944411816 scopus 로고    scopus 로고
    • Field experiments in automated monitoring of road construction
    • Navon, R., and Shpatnitsky, Y. (2005). "Field experiments in automated monitoring of road construction." J. Constr. Eng. Manage., 131(4).
    • (2005) J. Constr. Eng. Manage. , vol.131 , Issue.4
    • Navon, R.1    Shpatnitsky, Y.2
  • 21
    • 0343193299 scopus 로고    scopus 로고
    • High-precision application of GPS in the field of real-time equipment positioning
    • Peyret, F., Betaille, D., and Hintzy, G. (2000). "High-precision application of GPS in the field of real-time equipment positioning." Autom. Constr., 9, 299-314.
    • (2000) Autom. Constr. , vol.9 , pp. 299-314
    • Peyret, F.1    Betaille, D.2    Hintzy, G.3
  • 22
    • 18744395591 scopus 로고    scopus 로고
    • November 11, 2003
    • Potain. (2003). "Top tracing." 〈http://www.potain.com/ products/ prdRange_home.cfm?objectID=0001A406-758C-1ABF-B59480F03 BE70000&selectedHeadingID=EQUIPEMENT〉 (November 11, 2003).
    • (2003) Top Tracing
  • 23
    • 0002941762 scopus 로고    scopus 로고
    • Issues in the development and implementation of a building project model for an automated building system
    • Sacks, R. (1998). "Issues in the development and implementation of a building project model for an automated building system." Int. J. Constr. Inf. Technol. 5(2), 75-101.
    • (1998) Int. J. Constr. Inf. Technol. , vol.5 , Issue.2 , pp. 75-101
    • Sacks, R.1
  • 24
    • 1642618587 scopus 로고    scopus 로고
    • Parametric 3D modeling in building construction with examples from precast concrete
    • Sacks, R., Eastman, C. M., and Lee, G. (2003a). "Parametric 3D modeling in building construction with examples from precast concrete." Autom. Constr., 13(3), 291-312.
    • (2003) Autom. Constr. , vol.13 , Issue.3 , pp. 291-312
    • Sacks, R.1    Eastman, C.M.2    Lee, G.3
  • 25
    • 2942739545 scopus 로고    scopus 로고
    • Building project model support for automated labor monitoring
    • Sacks, R., Navon, R., and Goldschmidt, E. (2003b). "Building project model support for automated labor monitoring." J. Comput. Civ. Eng. 17(1), 19-27.
    • (2003) J. Comput. Civ. Eng. , vol.17 , Issue.1 , pp. 19-27
    • Sacks, R.1    Navon, R.2    Goldschmidt, E.3
  • 26
    • 14544283775 scopus 로고    scopus 로고
    • Report of the NIST Workshop on data exchange standards at the construction job site
    • F. van Gassel, ed., Eindhoven, The Netherlands
    • Saidi, K. S., Lytle, A. M., and Stone, W. C. (2003). "Report of the NIST Workshop on data exchange standards at the construction job site." Proc., ISARC-20th Int. Symp. on Automation and Robotics in Construction, F. van Gassel, ed., Eindhoven, The Netherlands, 617-622.
    • (2003) Proc., ISARC-20th Int. Symp. on Automation and Robotics in Construction , pp. 617-622
    • Saidi, K.S.1    Lytle, A.M.2    Stone, W.C.3
  • 27
    • 0005736484 scopus 로고    scopus 로고
    • Culture of using mobile cranes for building construction
    • Shapira, A., and Glascock, J. D. (1996). "Culture of using mobile cranes for building construction." J. Constr. Eng. Manage. 122(4), 298-307.
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.4 , pp. 298-307
    • Shapira, A.1    Glascock, J.D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.