메뉴 건너뛰기




Volumn 3, Issue , 2008, Pages 1503-1511

Field trial of automated material tracking in construction

Author keywords

[No Author keywords available]

Indexed keywords

AUTOMATED MATERIALS; CONSTRUCTION SITES; DYNAMIC CONSTRUCTIONS; FIELD TRIALS; IDLE TIME; INDUSTRIAL CONSTRUCTIONS; JOBSITE MANAGEMENTS; LOCATION ESTIMATIONS; ONTARIO; RESOURCE HANDLINGS; SHORT INTERVALS; TORONTO;

EID: 63049083431     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (27)

References (10)
  • 2
    • 0022675344 scopus 로고
    • Attributes of Materials Management Systems
    • Bell, L.C., and Stukhart, G. 1986. Attributes of Materials Management Systems, J. Constr. Engrg. Manag., ASCE, 112(1), 14-21.
    • (1986) J. Constr. Engrg. Manag., ASCE , vol.112 , Issue.1 , pp. 14-21
    • Bell, L.C.1    Stukhart, G.2
  • 3
    • 33845728532 scopus 로고    scopus 로고
    • Tracking components and maintenance history within a facility utilizing radio frequency identification technology
    • Ergen, E., Akinci, B., East, B., and Kirby, J. 2007a. Tracking components and maintenance history within a facility utilizing radio frequency identification technology, Journal of Computing in Civil Engineering, 21 (1), 2007, 11-20.
    • (2007) Journal of Computing in Civil Engineering , vol.21 , Issue.1 , pp. 11-20
    • Ergen, E.1    Akinci, B.2    East, B.3    Kirby, J.4
  • 4
    • 33846821572 scopus 로고    scopus 로고
    • Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS
    • Ergen, E., Akinci, B., and Sacks, R. 2007b. Tracking and locating components in a precast storage yard utilizing radio frequency identification technology and GPS, Automation in Construction, 16(3), 354-367.
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 354-367
    • Ergen, E.1    Akinci, B.2    Sacks, R.3
  • 5
    • 33745325795 scopus 로고    scopus 로고
    • Using global positioning system to improve materials-locating processes on industrial projects
    • Caldas, C.H., Grau, D., Haas, C.T. (2006). Using global positioning system to improve materials-locating processes on industrial projects, Journal of Construction Engineering and Management, 132 (7), 741-749.
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.7 , pp. 741-749
    • Caldas, C.H.1    Grau, D.2    Haas, C.T.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.