메뉴 건너뛰기




Volumn 141, Issue 1, 2013, Pages 112-126

Robust scheduling for multi-objective flexible job-shop problems with random machine breakdowns

Author keywords

Flexible job shop schedule problem; Machine breakdowns; Multi objective evolutionary algorithm; Robust scheduling; Surrogate measure

Indexed keywords

MACHINE BREAKDOWN; MULTI OBJECTIVE EVOLUTIONARY ALGORITHMS; ROBUST SCHEDULING; SCHEDULE PROBLEMS; SURROGATE MEASURE;

EID: 84869492892     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2012.04.015     Document Type: Article
Times cited : (193)

References (52)
  • 3
    • 79957742860 scopus 로고    scopus 로고
    • Robust and stable flexible job shop scheduling with random machine breakdowns using hybrid genetic algorithm
    • N. Al-Hinai, and T.Y. ElMekkawy Robust and stable flexible job shop scheduling with random machine breakdowns using hybrid genetic algorithm International Journal of Production Economics 132 2011 279 291
    • (2011) International Journal of Production Economics , vol.132 , pp. 279-291
    • Al-Hinai, N.1    Elmekkawy, T.Y.2
  • 4
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • H. Aytug, M.A. Lawley, K. McKay, S. Moha, and R. Uzsoy Executing production schedules in the face of uncertainties: a review and some future directions European Journal of Operational Research 161 2005 86 110
    • (2005) European Journal of Operational Research , vol.161 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Moha, S.4    Uzsoy, R.5
  • 5
    • 34250084648 scopus 로고
    • Routing and scheduling in a flexible job shop by tabu search
    • P. Brandimarte Routing and scheduling in a flexible job shop by tabu search Annals of Operations Research 41 1993 157 183
    • (1993) Annals of Operations Research , vol.41 , pp. 157-183
    • Brandimarte, P.1
  • 6
    • 0025531716 scopus 로고
    • Job shop scheduling with multi-purpose machines
    • P. Bruker, and R. Schlie Job shop scheduling with multi-purpose machines Computing 45 1990 369 375
    • (1990) Computing , vol.45 , pp. 369-375
    • Bruker, P.1    Schlie, R.2
  • 7
    • 44649128530 scopus 로고    scopus 로고
    • A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling
    • H. Chtourou, and M. Haouari A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling Computers Industrial Engineering 55 1 2008 183 194
    • (2008) Computers Industrial Engineering , vol.55 , Issue.1 , pp. 183-194
    • Chtourou, H.1    Haouari, M.2
  • 9
    • 0029254356 scopus 로고
    • Robust scheduling to hedge against processing time uncertainty in single-stage production
    • R.L. Daniels, and P. Kouvelis Robust scheduling to hedge against processing time uncertainty in single-stage production Management Science 41 2 1995 363 376
    • (1995) Management Science , vol.41 , Issue.2 , pp. 363-376
    • Daniels, R.L.1    Kouvelis, P.2
  • 13
    • 84882456750 scopus 로고    scopus 로고
    • Production rescheduling for machine breakdown at a job shop
    • doi:10.1080/00207543.2001.579637 in press
    • Dong, Y.-H.; Jang, J. Production rescheduling for machine breakdown at a job shop. International Journal Production Research, in press, http://dx.doi.org/10.1080/00207543.2001.579637.
    • International Journal Production Research
    • Dong Y., .-H.1    Jang, J.2
  • 14
    • 38749142590 scopus 로고    scopus 로고
    • A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems
    • J. Gao, L. Sun, and M. Gen A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems Computers & Operations Research 35 2008 2892 2907
    • (2008) Computers & Operations Research , vol.35 , pp. 2892-2907
    • Gao, J.1    Sun, L.2    Gen, M.3
  • 15
    • 34447289102 scopus 로고    scopus 로고
    • A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems
    • J. Gao, L. Sun, M. Gen, and X. Zhao A hybrid of genetic algorithm and bottleneck shifting for multiobjective flexible job shop scheduling problems Computers & Industrial Engineering 53 2007 149 162
    • (2007) Computers & Industrial Engineering , vol.53 , pp. 149-162
    • Gao, J.1    Sun, L.2    Gen, M.3    Zhao, X.4
  • 18
    • 36148970840 scopus 로고    scopus 로고
    • Robustness and stability measures for scheduling: Single-machine environment
    • S. Goren, and I. Sabuncuolu Robustness and stability measures for scheduling: single-machine environment IIE Transactions 40 1 2008 66 83
    • (2008) IIE Transactions , vol.40 , Issue.1 , pp. 66-83
    • Goren, S.1    Sabuncuolu, I.2
  • 19
    • 70350621618 scopus 로고    scopus 로고
    • A novel competitive co-evolutionary quantum genetic algorithm for stochastic job shop scheduling problem
    • J. Gu, M. Gu, C. Cao, and X. Gu A novel competitive co-evolutionary quantum genetic algorithm for stochastic job shop scheduling problem Computers & Operations Research 37 2010 927 937
    • (2010) Computers & Operations Research , vol.37 , pp. 927-937
    • Gu, J.1    Gu, M.2    Cao, C.3    Gu, X.4
  • 20
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • S. Hartmann A competitive genetic algorithm for resource-constrained project scheduling Naval Research Logistics 45 1998 733 750
    • (1998) Naval Research Logistics , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 21
    • 77955551788 scopus 로고    scopus 로고
    • Robust scheduling and robustness measures for the discrete time/cost trade-off problem
    • O. Hazir, M. Haouari, and E. Erel Robust scheduling and robustness measures for the discrete time/cost trade-off problem European Journal of Operational Research 207 2 2010 633 643
    • (2010) European Journal of Operational Research , vol.207 , Issue.2 , pp. 633-643
    • Hazir, O.1    Haouari, M.2    Erel, E.3
  • 22
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • W. Herroelen, and R. Leus Project scheduling under uncertainty: survey and research potentials European Journal of Operational Research 165 2005 289 306
    • (2005) European Journal of Operational Research , vol.165 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 24
    • 0032668814 scopus 로고    scopus 로고
    • Scheduling in job shops with machine breakdowns: An experimental study
    • O. Holthaus Scheduling in job shops with machine breakdowns: an experimental study Computers & Industrial Engineering 36 1 1999 137 162
    • (1999) Computers & Industrial Engineering , vol.36 , Issue.1 , pp. 137-162
    • Holthaus, O.1
  • 25
    • 0038479948 scopus 로고    scopus 로고
    • Generating robust and flexible job shop schedules using genetic algorithms
    • M.T. Jensen Generating robust and flexible job shop schedules using genetic algorithms IEEE Transactions on Evolutionary Computation 7 3 2003 275 288
    • (2003) IEEE Transactions on Evolutionary Computation , vol.7 , Issue.3 , pp. 275-288
    • Jensen, M.T.1
  • 26
    • 21044438483 scopus 로고    scopus 로고
    • Evolutionary optimization in uncertain environments survey
    • Y. Jin, and J. Branke Evolutionary optimization in uncertain environments survey IEEE Transactions on Evolutionary Computation 9 3 2005 303 317
    • (2005) IEEE Transactions on Evolutionary Computation , vol.9 , Issue.3 , pp. 303-317
    • Jin, Y.1    Branke, J.2
  • 28
    • 0037201140 scopus 로고    scopus 로고
    • Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
    • I. Kacem, S. Hammadi, and P. Borne Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic Mathematics and Computers in Simulation 60 2002 245 276
    • (2002) Mathematics and Computers in Simulation , vol.60 , pp. 245-276
    • Kacem, I.1    Hammadi, S.2    Borne, P.3
  • 29
    • 34047102496 scopus 로고    scopus 로고
    • A note on the paper by M. A. Al-fawzan and M. Haouari about a bi-objective model for robust resource-constrained project scheduling
    • P. Kobylański, and D. Kuchta A note on the paper by M. A. Al-fawzan and M. Haouari about a bi-objective model for robust resource-constrained project scheduling International Journal of Production Economics 107 2007 496 501
    • (2007) International Journal of Production Economics , vol.107 , pp. 496-501
    • Kobylański, P.1    Kuchta, D.2
  • 31
    • 77951099246 scopus 로고    scopus 로고
    • A genetic algorithm for flexible job shop scheduling with fuzzy processing time
    • D. Lei A genetic algorithm for flexible job shop scheduling with fuzzy processing time International Journal Production Research 48 10 2010 2995 3013
    • (2010) International Journal Production Research , vol.48 , Issue.10 , pp. 2995-3013
    • Lei, D.1
  • 32
    • 79961021759 scopus 로고    scopus 로고
    • Scheduling stochastic job shop subject to random breakdown to minimize makespan
    • D. Lei Scheduling stochastic job shop subject to random breakdown to minimize makespan International Journal of Advanced Manufacturing Technology 55 2011 1183 1192
    • (2011) International Journal of Advanced Manufacturing Technology , vol.55 , pp. 1183-1192
    • Lei, D.1
  • 33
    • 0028499648 scopus 로고
    • Robustness measures and robust scheduling for job shops
    • V.J. Leon, S.D. Wu, and R.H. Storer Robustness measures and robust scheduling for job shops IIE Transactions 26 5 1994 32 43
    • (1994) IIE Transactions , vol.26 , Issue.5 , pp. 32-43
    • Leon, V.J.1    Wu, S.D.2    Storer, R.H.3
  • 34
    • 4444286146 scopus 로고    scopus 로고
    • A robust optimization model for stochastic aggregate production planning
    • S. Leung, and W. Yue A robust optimization model for stochastic aggregate production planning Production Planning & Control 15 5 2004 502 514
    • (2004) Production Planning & Control , vol.15 , Issue.5 , pp. 502-514
    • Leung, S.1    Yue, W.2
  • 35
    • 79961021676 scopus 로고    scopus 로고
    • Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems
    • J.-Q. Li, Q.-K. Pan, and K.-Z. Gao Pareto-based discrete artificial bee colony algorithm for multi-objective flexible job shop scheduling problems International Journal of Advanced Manufacturing Technology 55 2011 1159 1169
    • (2011) International Journal of Advanced Manufacturing Technology , vol.55 , pp. 1159-1169
    • Li, J.-Q.1    Pan, Q.-K.2    Gao, K.-Z.3
  • 36
    • 0037411886 scopus 로고    scopus 로고
    • Single-machine scheduling with periodic maintenance and nonresumable jobs
    • C.-J. Liao, and W.J. Chen Single-machine scheduling with periodic maintenance and nonresumable jobs Computers & Operations Research 30 2003 1335 1347
    • (2003) Computers & Operations Research , vol.30 , pp. 1335-1347
    • Liao, C.-J.1    Chen, W.J.2
  • 37
    • 34547326656 scopus 로고    scopus 로고
    • Makespan minimization for two parallel machines with an unavailable period on each machine
    • C.-H. Lin, and C.-J. Liao Makespan minimization for two parallel machines with an unavailable period on each machine International Journal of Advanced Manufacturing Technology 33 2007 1024 1030
    • (2007) International Journal of Advanced Manufacturing Technology , vol.33 , pp. 1024-1030
    • Lin, C.-H.1    Liao, C.-J.2
  • 39
    • 77950298803 scopus 로고    scopus 로고
    • Development of a simulation-based decision support system for controlling stochastic flexible job shop manufacturing systems
    • I. Mahdavi, B. Shirazi, and M. Solimanpur Development of a simulation-based decision support system for controlling stochastic flexible job shop manufacturing systems Simulation Modelling Practice and Theory 18 2010 768 786
    • (2010) Simulation Modelling Practice and Theory , vol.18 , pp. 768-786
    • Mahdavi, I.1    Shirazi, B.2    Solimanpur, M.3
  • 42
    • 79951579853 scopus 로고    scopus 로고
    • Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem
    • E. Moradi, S.M.T.F. Ghomi, and M. Zandich Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem Expert Systems with Application 38 2011 7169 7178
    • (2011) Expert Systems with Application , vol.38 , pp. 7169-7178
    • Moradi, E.1    Ghomi, S.M.T.F.2    Zandich, M.3
  • 45
    • 33847297058 scopus 로고    scopus 로고
    • A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty
    • S. Shadrokh, and F. Kianfar A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty European Journal of Operational Research 181 2007 86 101
    • (2007) European Journal of Operational Research , vol.181 , pp. 86-101
    • Shadrokh, S.1    Kianfar, F.2
  • 46
    • 56549107166 scopus 로고    scopus 로고
    • Minimizing total tardiness on a single machine with controllable processing times
    • C.-T. Tseng, C.-J. Liao, and K.-L. Huang Minimizing total tardiness on a single machine with controllable processing times Computers & Operations Research 36 2009 1852 1858
    • (2009) Computers & Operations Research , vol.36 , pp. 1852-1858
    • Tseng, C.-T.1    Liao, C.-J.2    Huang, K.-L.3
  • 47
    • 84863283344 scopus 로고    scopus 로고
    • A decomposition-based approach to flexible flow shop scheduling under machine breakdown
    • doi:10.1080/00207543.2011.571456 in press
    • Wang, K.; Choi, S.H. A decomposition-based approach to flexible flow shop scheduling under machine breakdown. International Journal of Production Research, in press, http://dx.doi.org/10.1080/00207543.2011.571456.
    • International Journal of Production Research
    • Wang, K.1    Choi S., .H.2
  • 48
    • 77955473840 scopus 로고    scopus 로고
    • An effective heuristic for flexible job-shop scheduling problem with maintenance activities
    • S. Wang, and J. Yu An effective heuristic for flexible job-shop scheduling problem with maintenance activities Computers & Industrial Engineering 59 2010 436 447
    • (2010) Computers & Industrial Engineering , vol.59 , pp. 436-447
    • Wang, S.1    Yu, J.2
  • 49
    • 0000927907 scopus 로고    scopus 로고
    • A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness
    • S.D. Wu, E. Byeon, and R.H. Storer A graph-theoretic decomposition of the job shop scheduling problem to achieve scheduling robustness Operations Research 47 1 1999 113 124
    • (1999) Operations Research , vol.47 , Issue.1 , pp. 113-124
    • Wu, S.D.1    Byeon, E.2    Storer, R.H.3
  • 50
    • 34548434627 scopus 로고    scopus 로고
    • Job sequencing and due date assignment in a single machine shop with uncertain processing times
    • Y. Xia, B. Chen, and J. Yue Job sequencing and due date assignment in a single machine shop with uncertain processing times European Journal of Operational Research 184 2008 63 75
    • (2008) European Journal of Operational Research , vol.184 , pp. 63-75
    • Xia, Y.1    Chen, B.2    Yue, J.3
  • 51
    • 77649234984 scopus 로고    scopus 로고
    • A knowledge-based ant colony optimization for flexible job shop scheduling problems
    • L. Xing, Y. Chen, P. Wang, Q. Zhao, and J. Xiong A knowledge-based ant colony optimization for flexible job shop scheduling problems Applied Soft Computing 10 3 2010 888 896
    • (2010) Applied Soft Computing , vol.10 , Issue.3 , pp. 888-896
    • Xing, L.1    Chen, Y.2    Wang, P.3    Zhao, Q.4    Xiong, J.5
  • 52
    • 80052008498 scopus 로고    scopus 로고
    • An evolutionary multi-objective scenario-based approach for stochastic resource investment project scheduling
    • New Orleans, LA, USA
    • Xiong, J.; Liu, J.; Chen, Y.; Abbass, H.A.; 2011. An evolutionary multi-objective scenario-based approach for stochastic resource investment project scheduling. In: 2011 IEEE Congress on Evolutionary Computation (CEC), New Orleans, LA, USA, pp. 2767-2774.
    • (2011) 2011 IEEE Congress on Evolutionary Computation (CEC) , pp. 2767-2774
    • Xiong, J.1    Liu, J.2    Chen, Y.3    Abbass H., .A.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.