메뉴 건너뛰기




Volumn 36, Issue 1, 1999, Pages 137-162

Scheduling in job shops with machine breakdowns: An experimental study

Author keywords

[No Author keywords available]

Indexed keywords

BENCHMARKING; COMPUTER SIMULATION; MATHEMATICAL MODELS; PARAMETER ESTIMATION; PREVENTIVE MAINTENANCE; PROCESS CONTROL; SCHEDULING; SENSITIVITY ANALYSIS;

EID: 0032668814     PISSN: 03608352     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0360-8352(99)00006-6     Document Type: Article
Times cited : (108)

References (19)
  • 3
    • 0021496929 scopus 로고
    • Sequencing rules and due date assignments in a job shop
    • Baker K.R. Sequencing rules and due date assignments in a job shop. Management Science. 30:1984;1093-1104.
    • (1984) Management Science , vol.30 , pp. 1093-1104
    • Baker, K.R.1
  • 4
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems.
    • Bertrand J.W.M. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management. 3:1983;79-92.
    • (1983) Journal of Operations Management , vol.3 , pp. 79-92
    • Bertrand, J.W.M.1
  • 7
    • 0001173520 scopus 로고
    • Priority dispatching and work in process inventory in a job shop
    • Conway R.W. Priority dispatching and work in process inventory in a job shop. Journal of Industrial Engineering. 16:1965;123-130.
    • (1965) Journal of Industrial Engineering , vol.16 , pp. 123-130
    • Conway, R.W.1
  • 9
    • 34249973653 scopus 로고
    • A survey of priority rule-based scheduling
    • Haupt R. A survey of priority rule-based scheduling. OR Spektrum. 11:1989;3-16.
    • (1989) OR Spektrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 17
    • 0016885524 scopus 로고
    • A statistical comparison of the performance of simple dispatching rules for a particular set of job shops
    • Rochette R., Sadowski R.P. A statistical comparison of the performance of simple dispatching rules for a particular set of job shops. International Journal of Production Research. 14:1976;63-75.
    • (1976) International Journal of Production Research , vol.14 , pp. 63-75
    • Rochette, R.1    Sadowski, R.P.2
  • 18
    • 0023437076 scopus 로고
    • A comparative analysis of the COVERT job sequencing rule using various shop performance measures
    • Russell R.S., Dar-El E.M., Taylor B.W. A comparative analysis of the COVERT job sequencing rule using various shop performance measures. International Journal of Production Research. 25:1987;1523-1540.
    • (1987) International Journal of Production Research , vol.25 , pp. 1523-1540
    • Russell, R.S.1    Dar-El, E.M.2    Taylor, B.W.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.