-
1
-
-
0006859287
-
An extension of two machine sequencing problems
-
TS Arthanary KG Ramaswamy 1971 An extension of two machine sequencing problems Oper Res 8 10 22
-
(1971)
Oper Res
, vol.8
, pp. 10-22
-
-
Arthanary, T.S.1
Ramaswamy, K.G.2
-
2
-
-
67349185753
-
Production control in flexible flow shops: An example from textile manufacturing
-
North Carolina State University, USA
-
Elmaghraby SE, Karnoub RE (1995) Production control in flexible flow shops: an example from textile manufacturing. OR Report No. 305 OR and IE Department, North Carolina State University, USA
-
(1995)
OR Report No. 305 or and IE Department
-
-
Elmaghraby, S.E.1
Karnoub, R.E.2
-
4
-
-
0041375052
-
Job shop scheduling with group dependent setups, finite buffers, and long time horizon
-
PB Luh L Gou Y Zhang T Nagahora M Tsuji K Yoneda 1998 Job shop scheduling with group dependent setups, finite buffers, and long time horizon Ann Oper Res 76 233 259
-
(1998)
Ann Oper Res
, vol.76
, pp. 233-259
-
-
Luh, P.B.1
Gou, L.2
Zhang, Y.3
Nagahora, T.4
Tsuji, M.5
Yoneda, K.6
-
6
-
-
0027640745
-
Dynamic scheduling a survey of research
-
V Suresh D Chaudhuri 1993 Dynamic scheduling a survey of research Int J Prod Econ 32 1 53 63
-
(1993)
Int J Prod Econ
, vol.32
, Issue.1
, pp. 53-63
-
-
Suresh, V.1
Chaudhuri, D.2
-
7
-
-
0036604832
-
Using real-time information for effective dynamic scheduling
-
PI Cowling M Johansson 2002 Using real-time information for effective dynamic scheduling Eur J Oper Res 139 2 230 244
-
(2002)
Eur J Oper Res
, vol.139
, Issue.2
, pp. 230-244
-
-
Cowling, P.I.1
Johansson, M.2
-
8
-
-
0242703954
-
Rescheduling manufacturing systems: A framework of strategies, policies and methods
-
GE Vieira JW Hermann E Lin 2003 Rescheduling manufacturing systems: a framework of strategies, policies and methods J Sched 6 1 36 92
-
(2003)
J Sched
, vol.6
, Issue.1
, pp. 36-92
-
-
Vieira, G.E.1
Hermann, J.W.2
Lin, E.3
-
9
-
-
0034248849
-
Scheduling flexible flow shops with sequence-dependent setup effects
-
CY Liu SC Chang 2000 Scheduling flexible flow shops with sequence-dependent setup effects IEEE Trans Robot Autom 16 408 419
-
(2000)
IEEE Trans Robot Autom
, vol.16
, pp. 408-419
-
-
Liu, C.Y.1
Chang, S.C.2
-
10
-
-
0038486864
-
Comparing scheduling rules for flexible flow lines
-
ME Kurz RG Askin 2003 Comparing scheduling rules for flexible flow lines Int J Prod Econ 85 371 388
-
(2003)
Int J Prod Econ
, vol.85
, pp. 371-388
-
-
Kurz, M.E.1
Askin, R.G.2
-
11
-
-
2942674864
-
Scheduling flexible flow lines with sequence-dependent setup times
-
ME Kurz RG Askin 2004 Scheduling flexible flow lines with sequence-dependent setup times Eur J Oper Res 159 1 66 82
-
(2004)
Eur J Oper Res
, vol.159
, Issue.1
, pp. 66-82
-
-
Kurz, M.E.1
Askin, R.G.2
-
12
-
-
33748321077
-
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times
-
M Zandieh SMT Fatemi Ghomi SM Moattar Husseini 2006 An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times Appl Math Comput 180 111 127
-
(2006)
Appl Math Comput
, vol.180
, pp. 111-127
-
-
Zandieh, M.1
Fatemi Ghomi, S.M.T.2
Moattar Husseini, S.M.3
-
13
-
-
27144540137
-
A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility
-
R Ruiz C Maroto 2006 A genetic algorithm for hybrid flow shops with sequence dependent setup times and machine eligibility Eur J Oper Res 169 781 800
-
(2006)
Eur J Oper Res
, vol.169
, pp. 781-800
-
-
Ruiz, R.1
Maroto, C.2
-
14
-
-
0842267361
-
Generating non-permutation schedules in flow line based manufacturing systems with sequence-dependent setup times of jobs: A heuristic approach
-
S Pugazhendhi S Thiagarajan C Rajendran N Anantharaman 2004 Generating non-permutation schedules in flow line based manufacturing systems with sequence-dependent setup times of jobs: a heuristic approach Int J Adv Manuf Technol 23 64 78
-
(2004)
Int J Adv Manuf Technol
, vol.23
, pp. 64-78
-
-
Pugazhendhi, S.1
Thiagarajan, S.2
Rajendran, C.3
Anantharaman, N.4
-
15
-
-
67349113347
-
An evaluation of sequencing heuristics for flexible flow shop scheduling problems with unrelated parallel machines and dual criteria. Otto-von-Guericke-Universitat Magdeburg
-
J Jungwattanaki M Reodecha P Chaovalitwongse F Werner 2005 An evaluation of sequencing heuristics for flexible flow shop scheduling problems with unrelated parallel machines and dual criteria. Otto-von-Guericke-Universitat Magdeburg Preprint 28 05 1 23
-
(2005)
Preprint
, vol.28
, Issue.5
, pp. 1-23
-
-
Jungwattanaki, J.1
Reodecha, M.2
Chaovalitwongse, P.3
Werner, F.4
-
16
-
-
37049022197
-
An iterated greedy heuristic for the sequence dependent setup times flow shop with makespan and weighted tardiness objectives
-
R Ruiz T Stützle 2008 An iterated greedy heuristic for the sequence dependent setup times flow shop with makespan and weighted tardiness objectives Eur J Oper Res 187 1143 1159
-
(2008)
Eur J Oper Res
, vol.187
, pp. 1143-1159
-
-
Ruiz, R.1
Stützle, T.2
-
18
-
-
0029343965
-
Two-stage production scheduling with separated set-up times and stochastic breakdown
-
A Allahverdi 1995 Two-stage production scheduling with separated set-up times and stochastic breakdown J Oper Res Soc 46 896 904
-
(1995)
J Oper Res Soc
, vol.46
, pp. 896-904
-
-
Allahverdi, A.1
-
19
-
-
0018520161
-
Optimal two-stage production scheduling with setup times separated
-
T Yoshida K Hitomi 1979 Optimal two-stage production scheduling with setup times separated AIIE Trans 11 3 261 263
-
(1979)
AIIE Trans
, vol.11
, Issue.3
, pp. 261-263
-
-
Yoshida, T.1
Hitomi, K.2
-
20
-
-
0030270129
-
Two-machine proportionate flow shop scheduling with breakdowns to minimize maximum lateness
-
A Allahverdi 1996 Two-machine proportionate flow shop scheduling with breakdowns to minimize maximum lateness Comput Oper Res 23 909 916
-
(1996)
Comput Oper Res
, vol.23
, pp. 909-916
-
-
Allahverdi, A.1
-
21
-
-
0347834986
-
Dual criteria scheduling on a two-machine flow shop subject to random breakdowns
-
A Allahverdi J Mittenthal 1998 Dual criteria scheduling on a two-machine flow shop subject to random breakdowns Int Trans Oper Res 5 317 324
-
(1998)
Int Trans Oper Res
, vol.5
, pp. 317-324
-
-
Allahverdi, A.1
Mittenthal, J.2
-
22
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flow shops and job shops
-
C Rajendran O Holthaus 1999 A comparative study of dispatching rules in dynamic flow shops and job shops Eur J Oper Res 116 1 156 170
-
(1999)
Eur J Oper Res
, vol.116
, Issue.1
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
23
-
-
0032668814
-
Scheduling in job shops with machine breakdowns: An experimental study
-
O Holthaus 1999 Scheduling in job shops with machine breakdowns: an experimental study Comput Ind Eng 36 137 162
-
(1999)
Comput Ind Eng
, vol.36
, pp. 137-162
-
-
Holthaus, O.1
-
24
-
-
0037118759
-
An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns
-
D Alcaide A Rodriguez-Gonzalez J Sicilia 2002 An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns Eur J Oper Res 140 384 398
-
(2002)
Eur J Oper Res
, vol.140
, pp. 384-398
-
-
Alcaide, D.1
Rodriguez-Gonzalez, A.2
Sicilia, J.3
-
25
-
-
0035900864
-
Single-machine scheduling with maintenance and repair rate-modifying activities
-
CY Lee CS Lin 2001 Single-machine scheduling with maintenance and repair rate-modifying activities Eur J Oper Res 135 493 513
-
(2001)
Eur J Oper Res
, vol.135
, pp. 493-513
-
-
Lee, C.Y.1
Lin, C.S.2
-
26
-
-
28044442238
-
Minimizing makespan on a single machine subject to random breakdowns
-
N Kasap H Aytug A Paul 2006 Minimizing makespan on a single machine subject to random breakdowns Oper Res Lett 34 29 36
-
(2006)
Oper Res Lett
, vol.34
, pp. 29-36
-
-
Kasap, N.1
Aytug, H.2
Paul, A.3
-
27
-
-
10444260511
-
Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
-
H Allaoui A Artiba 2004 Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints Comput Ind Eng 47 431 450
-
(2004)
Comput Ind Eng
, vol.47
, pp. 431-450
-
-
Allaoui, H.1
Artiba, A.2
-
28
-
-
26444492122
-
Scheduling two-stage hybrid flow shop with availability constraints
-
H Allaoui A Artiba 2006 Scheduling two-stage hybrid flow shop with availability constraints Comput Oper Res 33 1399 1419
-
(2006)
Comput Oper Res
, vol.33
, pp. 1399-1419
-
-
Allaoui, H.1
Artiba, A.2
-
29
-
-
0034326104
-
Analysis of reactive scheduling problems in a job shop environment
-
I Sabuncuoglu M Bayiz 2000 Analysis of reactive scheduling problems in a job shop environment Eur J Oper Res 126 3 567 586
-
(2000)
Eur J Oper Res
, vol.126
, Issue.3
, pp. 567-586
-
-
Sabuncuoglu, I.1
Bayiz, M.2
-
30
-
-
0022097890
-
Scheduling/rescheduling in the manufacturing operating system environment
-
M Yamamoto SY Nof 1985 Scheduling/rescheduling in the manufacturing operating system environment Int J Prod Res 23 4 705 722
-
(1985)
Int J Prod Res
, vol.23
, Issue.4
, pp. 705-722
-
-
Yamamoto, M.1
Nof, S.Y.2
-
31
-
-
0033101911
-
A genetic algorithm methodology for complex scheduling problems
-
BA Norman JC Bean 1999 A genetic algorithm methodology for complex scheduling problems Nav Res Logistics 46 199 211
-
(1999)
Nav Res Logistics
, vol.46
, pp. 199-211
-
-
Norman, B.A.1
Bean, J.C.2
-
32
-
-
0001096735
-
Genetic algorithms and random keys for sequencing and optimization
-
JC Bean 1994 Genetic algorithms and random keys for sequencing and optimization ORSA J Comput 6 154 160
-
(1994)
ORSA J Comput
, vol.6
, pp. 154-160
-
-
Bean, J.C.1
|