-
1
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs
-
Adam, N.R., et al., 1993. Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs. European Journal of Operational Research, 68, 212-227.
-
(1993)
European Journal of Operational Research
, vol.68
, pp. 212-227
-
-
Adam, N.R.1
-
2
-
-
0023418695
-
Priority assignment procedures in multi level assembly job shops
-
Adam, N.R., Bertrand, J.W.M., and Surkis, J., 1987. Priority assignment procedures in multi level assembly job shops. IIE Transactions, 19, 317-328.
-
(1987)
IIE Transactions
, vol.19
, pp. 317-328
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Surkis, J.3
-
3
-
-
0012245221
-
The effects of input control in a simple scheduling model
-
Baker, K.R., 1984. The effects of input control in a simple scheduling model. Journal of Operations Management, 4, 99-112.
-
(1984)
Journal of Operations Management
, vol.4
, pp. 99-112
-
-
Baker, K.R.1
-
4
-
-
0002098611
-
The use of workload information to control job lateness in controlled and uncontrolled release production systems
-
Bertrand, J.W.M., 1983a. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3, 79-92.
-
(1983)
Journal of Operations Management
, vol.3
, pp. 79-92
-
-
Bertrand, J.W.M.1
-
5
-
-
0020783525
-
The effect of workload dependent due-dates on job-shop performance
-
Bertrand, J.W.M., 1983b. The effect of workload dependent due-dates on job-shop performance. Management Science, 29, 799-816.
-
(1983)
Management Science
, vol.29
, pp. 799-816
-
-
Bertrand, J.W.M.1
-
7
-
-
0036819519
-
An investigation of order release and flow time allowance policies for assembly shops
-
Bertrand, J.W.M. and Van de Wakker, A.M., 2002. An investigation of order release and flow time allowance policies for assembly shops. Production Planning and Control, 13, 639-648.
-
(2002)
Production Planning and Control
, vol.13
, pp. 639-648
-
-
Bertrand, J.W.M.1
Van De Wakker, A.M.2
-
8
-
-
0024303531
-
Survey of scheduling research involving due date determination decisions
-
Cheng, T.C.E. and Gupta, M.C., 1989. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38, 156-166.
-
(1989)
European Journal of Operational Research
, vol.38
, pp. 156-166
-
-
Cheng, T.C.E.1
Gupta, M.C.2
-
10
-
-
0001153814
-
A dynamic forecasting model for job shop flowtime prediction and tardiness control
-
Enns, S.T., 1995. A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research, 33, 1295-1312.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 1295-1312
-
-
Enns, S.T.1
-
11
-
-
0024641735
-
The effects of product structure and sequencing rule on assembly shop performance
-
Fry, T.D., et al., 1989a. The effects of product structure and sequencing rule on assembly shop performance. International Journal of Production Research, 27, 671-686.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 671-686
-
-
Fry, T.D.1
-
12
-
-
0024680497
-
Due date assignment in a multistage job shop
-
Fry, T.D., Philipoom, P.R., and Markland, R.E., 1989b. Due date assignment in a multistage job shop. IIE Transactions, 21, 153-161.
-
(1989)
IIE Transactions
, vol.21
, pp. 153-161
-
-
Fry, T.D.1
Philipoom, P.R.2
Markland, R.E.3
-
13
-
-
0027642739
-
Selecting allowance policies for improved job shop performance
-
Gee, E.S. and Smith, C.H., 1993. Selecting allowance policies for improved job shop performance. International Journal of Production Research, 31, 1839-1852.
-
(1993)
International Journal of Production Research
, vol.31
, pp. 1839-1852
-
-
Gee, E.S.1
Smith, C.H.2
-
14
-
-
84989446840
-
Operating policies for scheduling assembled products
-
Goodwin, J.S. and Goodwin, J.C., 1982. Operating policies for scheduling assembled products. Decision Sciences, 13, 585-603.
-
(1982)
Decision Sciences
, vol.13
, pp. 585-603
-
-
Goodwin, J.S.1
Goodwin, J.C.2
-
15
-
-
0034275944
-
Quoting manufacturing due dates subject to a service level constraint
-
Hopp, W.J. and Sturgis, M.L.R., 2000. Quoting manufacturing due dates subject to a service level constraint. IIE Transactions, 32, 771-784.
-
(2000)
IIE Transactions
, vol.32
, pp. 771-784
-
-
Hopp, W.J.1
Sturgis, M.L.R.2
-
16
-
-
0024664777
-
A structural methodology for managing manufacturing lead times in make-to-order companies
-
Kingsman, B.G., Tatsiopoulos, I.P., and Hendry, L.C., 1989. A structural methodology for managing manufacturing lead times in make-to-order companies. European Journal of Operational Research, 40, 196-209.
-
(1989)
European Journal of Operational Research
, vol.40
, pp. 196-209
-
-
Kingsman, B.G.1
Tatsiopoulos, I.P.2
Hendry, L.C.3
-
17
-
-
0032156960
-
The performance of workload control concepts in job shops: Improving the release method
-
Land, M.J. and Gaalman, G.J.C., 1998. The performance of workload control concepts in job shops: Improving the release method. International Journal of Production Economics, 56-57, 347-364.
-
(1998)
International Journal of Production Economics
, vol.56-57
, pp. 347-364
-
-
Land, M.J.1
Gaalman, G.J.C.2
-
18
-
-
78649822911
-
Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
-
Lu, H.L., Huang, G.Q., and Yang, H.D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49, 647-669.
-
(2011)
International Journal of Production Research
, vol.49
, pp. 647-669
-
-
Lu, H.L.1
Huang, G.Q.2
Yang, H.D.3
-
19
-
-
0001274658
-
Multiple-factor rules for sequencing with assembly constraints
-
Maxwell, W.L. and Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
-
(1968)
Naval Research Logistics Quarterly
, vol.15
, pp. 241-254
-
-
Maxwell, W.L.1
Mehra, M.2
-
21
-
-
33845805156
-
Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness
-
Natarajan, K., et al., 2007. Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness. International Journal of Advanced Manufacturing Technology, 31, 751-761.
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.31
, pp. 751-761
-
-
Natarajan, K.1
-
22
-
-
0034295978
-
The influence of shop characteristics on workload control
-
Oosterman, B., Land, M.J., and Gaalman, G., 2000. The influence of shop characteristics on workload control. International Journal of Production Economics, 68, 107-119.
-
(2000)
International Journal of Production Economics
, vol.68
, pp. 107-119
-
-
Oosterman, B.1
Land, M.J.2
Gaalman, G.3
-
23
-
-
0026140380
-
A preliminary investigation of multi-attribute based sequencing rules for assembly shops
-
Philipoom, P., Russell, R., and Fry, T., 1991. A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29, 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 739-753
-
-
Philipoom, P.1
Russell, R.2
Fry, T.3
-
24
-
-
0037063279
-
Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products
-
Pongcharoen, P., et al., 2002. Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products. International Journal of Production Economics, 78, 311-322.
-
(2002)
International Journal of Production Economics
, vol.78
, pp. 311-322
-
-
Pongcharoen, P.1
-
25
-
-
0034691918
-
ISTS: A new procedure for the integrated scheduling of multi-stage systems
-
Portioli-Staudacher, A., 2000. ISTS: A new procedure for the integrated scheduling of multi-stage systems. International Journal of Production Research, 38, 2489-2514.
-
(2000)
International Journal of Production Research
, vol.38
, pp. 2489-2514
-
-
Portioli-Staudacher, A.1
-
27
-
-
0030172572
-
Dynamic assignment of due dates in an assembly shop based in simulation
-
Roman, D.B. and del Valle, A.G., 1996. Dynamic assignment of due dates in an assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
-
(1996)
International Journal of Production Research
, vol.34
, pp. 1539-1554
-
-
Roman, D.B.1
Del Valle, A.G.2
-
28
-
-
0011727186
-
Priority dispatching rules in job shops with assembly operations and random delays
-
Sculli, D., 1980. Priority dispatching rules in job shops with assembly operations and random delays. Omega, 8, 227-234.
-
(1980)
Omega
, vol.8
, pp. 227-234
-
-
Sculli, D.1
-
29
-
-
33749578069
-
MAPP - A web-based decision support system for the mould industry
-
Silva, C., Roque, L., and Almeida, A., 2006. MAPP - A web-based decision support system for the mould industry. Decision Support Systems, 42, 999-1014.
-
(2006)
Decision Support Systems
, vol.42
, pp. 999-1014
-
-
Silva, C.1
Roque, L.2
Almeida, A.3
-
30
-
-
0001385963
-
Regression-based due date assignment rules for improved assembly shop performance
-
Smith, C.H., Minor, E.D., and Wen, H.J., 1995. Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2375-2385
-
-
Smith, C.H.1
Minor, E.D.2
Wen, H.J.3
-
32
-
-
27744563510
-
A review of production planning and control: The applicability of key concepts to the make to order industry
-
Stevenson, M., Hendry, L.C., and Kingsman, B.G., 2005. A review of production planning and control: The applicability of key concepts to the make to order industry. International Journal of Production Research, 43, 869-898.
-
(2005)
International Journal of Production Research
, vol.43
, pp. 869-898
-
-
Stevenson, M.1
Hendry, L.C.2
Kingsman, B.G.3
-
33
-
-
79954418061
-
The theory and practice of workload control: A research agenda and implementation strategy
-
Stevenson, M., et al., 2011. The theory and practice of workload control: A research agenda and implementation strategy. International Journal of Production Economics, 131, 689-700.
-
(2011)
International Journal of Production Economics
, vol.131
, pp. 689-700
-
-
Stevenson, M.1
-
34
-
-
28044452691
-
Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flow time of jobs
-
Thiagarajan, S. and Rajendran, C., 2005. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flow time of jobs. Computers and Industrial Engineering, 49, 463-503.
-
(2005)
Computers and Industrial Engineering
, vol.49
, pp. 463-503
-
-
Thiagarajan, S.1
Rajendran, C.2
-
35
-
-
0018454859
-
A simulation study of predictable due dates
-
Weeks, J.K., 1979. A simulation study of predictable due dates. Management Science, 25, 363-373.
-
(1979)
Management Science
, vol.25
, pp. 363-373
-
-
Weeks, J.K.1
-
36
-
-
0001200692
-
Due date setting and priority sequencing in a multiclass M/G/1 queue
-
Wein, L.M., 1991. Due date setting and priority sequencing in a multiclass M/G/1 queue. Management Science, 38, 1018-1033.
-
(1991)
Management Science
, vol.38
, pp. 1018-1033
-
-
Wein, L.M.1
|