메뉴 건너뛰기




Volumn 50, Issue 20, 2012, Pages 5949-5965

The performance of Due Date setting rules in assembly and multi-stage job shops: An assessment by simulation

Author keywords

assembly job shop; Due Date setting; multi stage job shop; simulation

Indexed keywords

ASSEMBLY JOB SHOP; ASSEMBLY OPERATIONS; COMPLEX PRODUCTS; DUE DATES; DUE-DATE SETTING; FINAL ASSEMBLY; JOB SHOP; MULTI-STAGE; PRODUCT STRUCTURE; PRODUCTION PLANNING AND CONTROL; SETTING RULES; SIMULATION;

EID: 84867362906     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207543.2011.638942     Document Type: Article
Times cited : (12)

References (36)
  • 1
    • 0027627910 scopus 로고
    • Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs
    • Adam, N.R., et al., 1993. Due date assignment procedures with dynamically updated coefficients for multi level assembly jobs. European Journal of Operational Research, 68, 212-227.
    • (1993) European Journal of Operational Research , vol.68 , pp. 212-227
    • Adam, N.R.1
  • 2
    • 0023418695 scopus 로고
    • Priority assignment procedures in multi level assembly job shops
    • Adam, N.R., Bertrand, J.W.M., and Surkis, J., 1987. Priority assignment procedures in multi level assembly job shops. IIE Transactions, 19, 317-328.
    • (1987) IIE Transactions , vol.19 , pp. 317-328
    • Adam, N.R.1    Bertrand, J.W.M.2    Surkis, J.3
  • 3
    • 0012245221 scopus 로고
    • The effects of input control in a simple scheduling model
    • Baker, K.R., 1984. The effects of input control in a simple scheduling model. Journal of Operations Management, 4, 99-112.
    • (1984) Journal of Operations Management , vol.4 , pp. 99-112
    • Baker, K.R.1
  • 4
    • 0002098611 scopus 로고
    • The use of workload information to control job lateness in controlled and uncontrolled release production systems
    • Bertrand, J.W.M., 1983a. The use of workload information to control job lateness in controlled and uncontrolled release production systems. Journal of Operations Management, 3, 79-92.
    • (1983) Journal of Operations Management , vol.3 , pp. 79-92
    • Bertrand, J.W.M.1
  • 5
    • 0020783525 scopus 로고
    • The effect of workload dependent due-dates on job-shop performance
    • Bertrand, J.W.M., 1983b. The effect of workload dependent due-dates on job-shop performance. Management Science, 29, 799-816.
    • (1983) Management Science , vol.29 , pp. 799-816
    • Bertrand, J.W.M.1
  • 7
    • 0036819519 scopus 로고    scopus 로고
    • An investigation of order release and flow time allowance policies for assembly shops
    • Bertrand, J.W.M. and Van de Wakker, A.M., 2002. An investigation of order release and flow time allowance policies for assembly shops. Production Planning and Control, 13, 639-648.
    • (2002) Production Planning and Control , vol.13 , pp. 639-648
    • Bertrand, J.W.M.1    Van De Wakker, A.M.2
  • 8
    • 0024303531 scopus 로고
    • Survey of scheduling research involving due date determination decisions
    • Cheng, T.C.E. and Gupta, M.C., 1989. Survey of scheduling research involving due date determination decisions. European Journal of Operational Research, 38, 156-166.
    • (1989) European Journal of Operational Research , vol.38 , pp. 156-166
    • Cheng, T.C.E.1    Gupta, M.C.2
  • 10
    • 0001153814 scopus 로고
    • A dynamic forecasting model for job shop flowtime prediction and tardiness control
    • Enns, S.T., 1995. A dynamic forecasting model for job shop flowtime prediction and tardiness control. International Journal of Production Research, 33, 1295-1312.
    • (1995) International Journal of Production Research , vol.33 , pp. 1295-1312
    • Enns, S.T.1
  • 11
    • 0024641735 scopus 로고
    • The effects of product structure and sequencing rule on assembly shop performance
    • Fry, T.D., et al., 1989a. The effects of product structure and sequencing rule on assembly shop performance. International Journal of Production Research, 27, 671-686.
    • (1989) International Journal of Production Research , vol.27 , pp. 671-686
    • Fry, T.D.1
  • 12
    • 0024680497 scopus 로고
    • Due date assignment in a multistage job shop
    • Fry, T.D., Philipoom, P.R., and Markland, R.E., 1989b. Due date assignment in a multistage job shop. IIE Transactions, 21, 153-161.
    • (1989) IIE Transactions , vol.21 , pp. 153-161
    • Fry, T.D.1    Philipoom, P.R.2    Markland, R.E.3
  • 13
    • 0027642739 scopus 로고
    • Selecting allowance policies for improved job shop performance
    • Gee, E.S. and Smith, C.H., 1993. Selecting allowance policies for improved job shop performance. International Journal of Production Research, 31, 1839-1852.
    • (1993) International Journal of Production Research , vol.31 , pp. 1839-1852
    • Gee, E.S.1    Smith, C.H.2
  • 14
    • 84989446840 scopus 로고
    • Operating policies for scheduling assembled products
    • Goodwin, J.S. and Goodwin, J.C., 1982. Operating policies for scheduling assembled products. Decision Sciences, 13, 585-603.
    • (1982) Decision Sciences , vol.13 , pp. 585-603
    • Goodwin, J.S.1    Goodwin, J.C.2
  • 15
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • Hopp, W.J. and Sturgis, M.L.R., 2000. Quoting manufacturing due dates subject to a service level constraint. IIE Transactions, 32, 771-784.
    • (2000) IIE Transactions , vol.32 , pp. 771-784
    • Hopp, W.J.1    Sturgis, M.L.R.2
  • 16
  • 17
    • 0032156960 scopus 로고    scopus 로고
    • The performance of workload control concepts in job shops: Improving the release method
    • Land, M.J. and Gaalman, G.J.C., 1998. The performance of workload control concepts in job shops: Improving the release method. International Journal of Production Economics, 56-57, 347-364.
    • (1998) International Journal of Production Economics , vol.56-57 , pp. 347-364
    • Land, M.J.1    Gaalman, G.J.C.2
  • 18
    • 78649822911 scopus 로고    scopus 로고
    • Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach
    • Lu, H.L., Huang, G.Q., and Yang, H.D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49, 647-669.
    • (2011) International Journal of Production Research , vol.49 , pp. 647-669
    • Lu, H.L.1    Huang, G.Q.2    Yang, H.D.3
  • 19
    • 0001274658 scopus 로고
    • Multiple-factor rules for sequencing with assembly constraints
    • Maxwell, W.L. and Mehra, M., 1968. Multiple-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241-254.
    • (1968) Naval Research Logistics Quarterly , vol.15 , pp. 241-254
    • Maxwell, W.L.1    Mehra, M.2
  • 21
    • 33845805156 scopus 로고    scopus 로고
    • Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness
    • Natarajan, K., et al., 2007. Performance evaluation of priority dispatching rules in multi-level assembly job shops with jobs having weights for flowtime and tardiness. International Journal of Advanced Manufacturing Technology, 31, 751-761.
    • (2007) International Journal of Advanced Manufacturing Technology , vol.31 , pp. 751-761
    • Natarajan, K.1
  • 23
    • 0026140380 scopus 로고
    • A preliminary investigation of multi-attribute based sequencing rules for assembly shops
    • Philipoom, P., Russell, R., and Fry, T., 1991. A preliminary investigation of multi-attribute based sequencing rules for assembly shops. International Journal of Production Research, 29, 739-753.
    • (1991) International Journal of Production Research , vol.29 , pp. 739-753
    • Philipoom, P.1    Russell, R.2    Fry, T.3
  • 24
    • 0037063279 scopus 로고    scopus 로고
    • Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products
    • Pongcharoen, P., et al., 2002. Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products. International Journal of Production Economics, 78, 311-322.
    • (2002) International Journal of Production Economics , vol.78 , pp. 311-322
    • Pongcharoen, P.1
  • 25
    • 0034691918 scopus 로고    scopus 로고
    • ISTS: A new procedure for the integrated scheduling of multi-stage systems
    • Portioli-Staudacher, A., 2000. ISTS: A new procedure for the integrated scheduling of multi-stage systems. International Journal of Production Research, 38, 2489-2514.
    • (2000) International Journal of Production Research , vol.38 , pp. 2489-2514
    • Portioli-Staudacher, A.1
  • 27
    • 0030172572 scopus 로고    scopus 로고
    • Dynamic assignment of due dates in an assembly shop based in simulation
    • Roman, D.B. and del Valle, A.G., 1996. Dynamic assignment of due dates in an assembly shop based in simulation. International Journal of Production Research, 34, 1539-1554.
    • (1996) International Journal of Production Research , vol.34 , pp. 1539-1554
    • Roman, D.B.1    Del Valle, A.G.2
  • 28
    • 0011727186 scopus 로고
    • Priority dispatching rules in job shops with assembly operations and random delays
    • Sculli, D., 1980. Priority dispatching rules in job shops with assembly operations and random delays. Omega, 8, 227-234.
    • (1980) Omega , vol.8 , pp. 227-234
    • Sculli, D.1
  • 29
    • 33749578069 scopus 로고    scopus 로고
    • MAPP - A web-based decision support system for the mould industry
    • Silva, C., Roque, L., and Almeida, A., 2006. MAPP - A web-based decision support system for the mould industry. Decision Support Systems, 42, 999-1014.
    • (2006) Decision Support Systems , vol.42 , pp. 999-1014
    • Silva, C.1    Roque, L.2    Almeida, A.3
  • 30
    • 0001385963 scopus 로고
    • Regression-based due date assignment rules for improved assembly shop performance
    • Smith, C.H., Minor, E.D., and Wen, H.J., 1995. Regression-based due date assignment rules for improved assembly shop performance. International Journal of Production Research, 33, 2375-2385.
    • (1995) International Journal of Production Research , vol.33 , pp. 2375-2385
    • Smith, C.H.1    Minor, E.D.2    Wen, H.J.3
  • 32
    • 27744563510 scopus 로고    scopus 로고
    • A review of production planning and control: The applicability of key concepts to the make to order industry
    • Stevenson, M., Hendry, L.C., and Kingsman, B.G., 2005. A review of production planning and control: The applicability of key concepts to the make to order industry. International Journal of Production Research, 43, 869-898.
    • (2005) International Journal of Production Research , vol.43 , pp. 869-898
    • Stevenson, M.1    Hendry, L.C.2    Kingsman, B.G.3
  • 33
    • 79954418061 scopus 로고    scopus 로고
    • The theory and practice of workload control: A research agenda and implementation strategy
    • Stevenson, M., et al., 2011. The theory and practice of workload control: A research agenda and implementation strategy. International Journal of Production Economics, 131, 689-700.
    • (2011) International Journal of Production Economics , vol.131 , pp. 689-700
    • Stevenson, M.1
  • 34
    • 28044452691 scopus 로고    scopus 로고
    • Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flow time of jobs
    • Thiagarajan, S. and Rajendran, C., 2005. Scheduling in dynamic assembly job-shops to minimize the sum of weighted earliness, weighted tardiness and weighted flow time of jobs. Computers and Industrial Engineering, 49, 463-503.
    • (2005) Computers and Industrial Engineering , vol.49 , pp. 463-503
    • Thiagarajan, S.1    Rajendran, C.2
  • 35
    • 0018454859 scopus 로고
    • A simulation study of predictable due dates
    • Weeks, J.K., 1979. A simulation study of predictable due dates. Management Science, 25, 363-373.
    • (1979) Management Science , vol.25 , pp. 363-373
    • Weeks, J.K.1
  • 36
    • 0001200692 scopus 로고
    • Due date setting and priority sequencing in a multiclass M/G/1 queue
    • Wein, L.M., 1991. Due date setting and priority sequencing in a multiclass M/G/1 queue. Management Science, 38, 1018-1033.
    • (1991) Management Science , vol.38 , pp. 1018-1033
    • Wein, L.M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.