1
-
-
0021658892
-
A combined approach to due-date scheduling
-
(North Holland: Elsevier)
-
Cheng, T. C. E., 1984, A combined approach to due-date scheduling. In Advances in Production Management Systems (North Holland: Elsevier).
-
(1984)
Advances in Production Management Systems
-
-
Cheng, T.C.E.1
-
2
-
-
0004113622
-
-
(Reading, Mass: Addison-Wesley)
-
Conway, R. W., Maxwell, W. L. and Miller, L. W., 1967, Theory of Scheduling (Reading, Mass: Addison-Wesley).
-
(1967)
Theory of Scheduling
-
-
Conway, R.W.1
Maxwell, W.L.2
Miller, L.W.3
-
3
-
-
0016929914
-
Due dates in job shop scheduling
-
Eilon, S. and Chowdhury, I. G., 1976, Due dates in job shop scheduling. International Journal of Production Research, 14, 223-237.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 223-237
-
-
Eilon, S.1
Chowdhury, I.G.2
-
4
-
-
0024680497
-
Due date assignment in a multistage job shop
-
Fry, T. D., Philipoom, P. R. and Markland, R. E., 1990, Due date assignment in a multistage job shop. HE Transactions, 21, 153-161.
-
(1990)
HE Transactions
, vol.21
, pp. 153-161
-
-
Fry, T.D.1
Philipoom, P.R.2
Markland, R.E.3
-
5
-
-
0024641735
-
The effects of product structure and sequencing rule on assembly shop performance
-
Fry, T. D., Oliff, M. D., Minor, E. D. and Leong, G. K., 1989, The effects of product structure and sequencing rule on assembly shop performance, international Journal of Production Research, 27, 671-686.
-
(1989)
International Journal of Production Research
, vol.27
, pp. 671-686
-
-
Fry, T.D.1
Oliff, M.D.2
Minor, E.D.3
Leong, G.K.4
-
6
-
-
0000965956
-
Heuristics in job shop scheduling
-
Gere, W. S., 1966, Heuristics in job shop scheduling. Management Science, 13, (3).
-
(1966)
Management Science
, vol.13
, Issue.3
-
-
Gere, W.S.1
-
7
-
-
0022681216
-
Evaluating scheduling policies in a multilevel assembly system
-
Goodwin, J. S. and Weeks, J. K., 1986, Evaluating scheduling policies in a multilevel assembly system. International Journal of Production Research, 24, 247-257.
-
(1986)
International Journal of Production Research
, vol.24
, pp. 247-257
-
-
Goodwin, J.S.1
Weeks, J.K.2
-
8
-
-
0021424669
-
A comparative study of priority dispatching rules in a hybrid assembly job shop
-
Huang, P. Y., 1984, A comparative study of priority dispatching rules in a hybrid assembly job shop. International Journal of Production Research, 22, 375-387.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 375-387
-
-
Huang, P.Y.1
-
9
-
-
0001274658
-
Multiplex-factor rules for sequencing with assembly constraints
-
Maxwell, W. L. and Mehra, M., 1968, Multiplex-factor rules for sequencing with assembly constraints. Naval Research Logistics Quarterly, 15, 241 -254.
-
(1968)
Naval Research Logistics Quarterly
, vol.15
-
-
Maxwell, W.L.1
Mehra, M.2
-
10
-
-
0019540666
-
Combined scheduling system for reducing job tardiness in a job shop
-
Miyazaki, S., 1981, Combined scheduling system for reducing job tardiness in a job shop, International Journal of Production Research, 19, pp. 201-211.
-
(1981)
International Journal of Production Research
, vol.19
, pp. 201-211
-
-
Miyazaki, S.1
-
11
-
-
0026140380
-
A preliminary investigation of multiattribute based sequencing rules for assembly shops
-
Philipoom, P. R., Russell, R. S. and Fry, T. D., 1991, A preliminary investigation of multiattribute based sequencing rules for assembly shops. International Journal of Production Research, 29, 739-753.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 739-753
-
-
Philipoom, P.R.1
Russell, R.S.2
Fry, T.D.3
-
12
-
-
0001870328
-
A simulation analysis of due date assignment rules
-
Ragatz, G. L. and Mabert, V. A., 1984, A simulation analysis of due date assignment rules. Journal of Operations Management, 5, 27-39.
-
(1984)
Journal of Operations Management
, vol.5
, pp. 27-39
-
-
Ragatz, G.L.1
Mabert, V.A.2
-
13
-
-
0016885524
-
A statistical comparison of simple dispatching rules for a particular set of job shops
-
Rochette, R. and Sadowski, R. P., 1976, A statistical comparison of simple dispatching rules for a particular set of job shops. International Journal of Production Research, 14, 63-75.
-
(1976)
International Journal of Production Research
, vol.14
, pp. 63-75
-
-
Rochette, R.1
Sadowski, R.P.2
-
14
-
-
0022130137
-
An evaluation of scheduling policies in a dual resource constrained assembly shop
-
Russell, R. S. and Taylor III, B. W., 1985, An evaluation of scheduling policies in a dual resource constrained assembly shop. HE Transactions, 17, 219-232.
-
(1985)
HE Transactions
, vol.17
, pp. 219-232
-
-
Russell, R.S.1
Taylor, B.W.2
-
15
-
-
38149145323
-
Priority dispatching rules in job shops with assembly operations and random delays
-
Sculli, D., 1987, Priority dispatching rules in job shops with assembly operations and random delays. Omega, 15, 49-57.
-
(1987)
Omega
, vol.15
, pp. 49-57
-
-
Sculli, D.1
-
16
-
-
0003831155
-
-
PhD thesis, Industrial Engineering, Cornell University, USA
-
Siegel, G. B., 1971, An investigation of job shop scheduling for job shops with assembly constraints. PhD thesis, Industrial Engineering, Cornell University, USA.
-
(1971)
An Investigation of Job Shop Scheduling for Job Shops with Assembly Constraints.
-
-
Siegel, G.B.1
|