-
1
-
-
0023418695
-
Priority assignment procedures in multi-level assembly jobshops
-
Adam, N.R., Bertrand, J.W.M. and Surkis, J., Priority assignment procedures in multi-level assembly jobshops. IIE Trans., 1987, 19, 317-328.
-
(1987)
IIE Trans.
, vol.19
, pp. 317-328
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Surkis, J.3
-
2
-
-
0027627910
-
Due date assignment procedures with dynamically updated coefficients for multi-level assembly jobshops
-
Adam, N.R., Bertrand, J.W.M., Morehead, D.C. and Surkis, J., Due date assignment procedures with dynamically updated coefficients for multi-level assembly jobshops. Eur. J. Oper. Res., 1993, 68, 212-227.
-
(1993)
Eur. J. Oper. Res.
, vol.68
, pp. 212-227
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Morehead, D.C.3
Surkis, J.4
-
3
-
-
0025694085
-
Two new rules to minimize tardiness in a jobshop
-
Anderson, E.J. and Nyirendra, J.C., Two new rules to minimize tardiness in a jobshop. Int. J. Prod. Res., 1990, 28, 2277-2292.
-
(1990)
Int. J. Prod. Res.
, vol.28
, pp. 2277-2292
-
-
Anderson, E.J.1
Nyirendra, J.C.2
-
4
-
-
0038824809
-
An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function
-
Arakawa, M., Fuyuki, M. and Inoue, I., An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function. Int. J. Prod. Econ., 2003, 85, 359-369.
-
(2003)
Int. J. Prod. Econ.
, vol.85
, pp. 359-369
-
-
Arakawa, M.1
Fuyuki, M.2
Inoue, I.3
-
6
-
-
0020013653
-
A state-of-the-art survey of dispatching rules for manufacturing job shop operations
-
Blackstone, J.H., Philips, D.T. and Hogg, G.L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res., 1982, 20, 27-45.
-
(1982)
Int. J. Prod. Res.
, vol.20
, pp. 27-45
-
-
Blackstone, J.H.1
Philips, D.T.2
Hogg, G.L.3
-
7
-
-
0009442376
-
Gantt chart based MES for die and mould manufacturing
-
Seattle, WA, 11-15 September
-
Choi, B.K., Kim, D.H. and Hwang, H., Gantt chart based MES for die and mould manufacturing. Proceedings of IFIP WG5.7 Conference on Managing Concurrent Manufacturing to Improve Industrial Performance, Seattle, WA, 11-15 September 1995, pp. 105-114.
-
(1995)
Proceedings of IFIP WG5.7 Conference on Managing Concurrent Manufacturing to Improve Industrial Performance
, pp. 105-114
-
-
Choi, B.K.1
Kim, D.H.2
Hwang, H.3
-
8
-
-
0036574303
-
MES Architecture for FMS compatible to ERP
-
Choi, B.K. and Kim, B.H., MES Architecture for FMS compatible to ERP. IJCIM, 2002, 15, 274-284.
-
(2002)
IJCIM
, vol.15
, pp. 274-284
-
-
Choi, B.K.1
Kim, B.H.2
-
9
-
-
0001173522
-
An experimental investigation of priority dispatching
-
Conway, R.W., Johnson, B.M., Maxwell, W.L., An experimental investigation of priority dispatching. J. Ind. Engng 1960, 11, 221-230.
-
(1960)
J. Ind. Engng
, vol.11
, pp. 221-230
-
-
Conway, R.W.1
Johnson, B.M.2
Maxwell, W.L.3
-
10
-
-
0001173515
-
Priority dispatching and job lateness in a job shop
-
Conway, R.W., Priority dispatching and job lateness in a job shop. J. Ind. Engng, 1965, 16, 123-130.
-
(1965)
J. Ind. Engng
, vol.16
, pp. 123-130
-
-
Conway, R.W.1
-
11
-
-
34249973653
-
A survey of priority rule based scheduling
-
Haupt, R., A survey of priority rule based scheduling. OR Spectrum, 1998, 11, 3-16.
-
(1998)
OR Spectrum
, vol.11
, pp. 3-16
-
-
Haupt, R.1
-
12
-
-
0030782894
-
Efficient dispatching rules for scheduling in jobshop
-
Holthaus, O. and Rajendran, C., Efficient dispatching rules for scheduling in jobshop. Int. J. Prod. Econ., 1997, 48, 87-105.
-
(1997)
Int. J. Prod. Econ.
, vol.48
, pp. 87-105
-
-
Holthaus, O.1
Rajendran, C.2
-
13
-
-
0034161039
-
Efficient jobshop dispatching rules: Further developments
-
Holthaus, O. and Rajendran, C., Efficient jobshop dispatching rules: Further developments. Prod. Planning Control, 2000, 11, 171-178.
-
(2000)
Prod. Planning Control
, vol.11
, pp. 171-178
-
-
Holthaus, O.1
Rajendran, C.2
-
14
-
-
2042474752
-
Development and analysis of cost-based dispatching rule for job shop scheduling
-
Jayamohan, M.S., and Rajendran, C., Development and analysis of cost-based dispatching rule for job shop scheduling. Eur. J. Oper. Res., 2004, 157, 307-321.
-
(2004)
Eur. J. Oper. Res.
, vol.157
, pp. 307-321
-
-
Jayamohan, M.S.1
Rajendran, C.2
-
15
-
-
0034187609
-
Conceptual frame for development of optimized simulation-based scheduling systems
-
Jeong, K.Y., Conceptual frame for development of optimized simulation-based scheduling systems. Exp. Syst. Applic., 2000, 18, 299-306.
-
(2000)
Exp. Syst. Applic.
, vol.18
, pp. 299-306
-
-
Jeong, K.Y.1
-
16
-
-
33646942374
-
Confidence intervals for steady state simulation
-
Law, A.M. and Kelton, W.D., Confidence intervals for steady state simulation. J. Op. Manage., 1984, 2, 167-176.
-
(1984)
J. Op. Manage.
, vol.2
, pp. 167-176
-
-
Law, A.M.1
Kelton, W.D.2
-
17
-
-
0011789253
-
Priority dispatching and assembly operations in a jobshop
-
Maxwell, W.L., Priority dispatching and assembly operations in a jobshop. Rand Corporation Memorandum, 1969.
-
(1969)
Rand Corporation Memorandum
-
-
Maxwell, W.L.1
-
18
-
-
0037210011
-
Scheduling rules for dynamic shops that manufacture multi-level jobs
-
Mohanasundaram, K.M., Natarajan, K., ViswanathKurma, G., Radhakrishnan, P. and Rajendran, C., Scheduling rules for dynamic shops that manufacture multi-level jobs. Comput. Ind. Engng, 2002, 44, 119-131.
-
(2002)
Comput. Ind. Engng
, vol.44
, pp. 119-131
-
-
Mohanasundaram, K.M.1
Natarajan, K.2
Viswanathkurma, G.3
Radhakrishnan, P.4
Rajendran, C.5
-
19
-
-
0026140380
-
A preliminary investigation of multiattribute based sequencing rules for assembly shops
-
Philipoom, P.R., Russel, R.S. and Fry, T.D., A preliminary investigation of multiattribute based sequencing rules for assembly shops. Int. J. Prod. Res., 29, 739-753.
-
(1929)
Int. J. Prod. Res.
, pp. 739-753
-
-
Philipoom, P.R.1
Russel, R.S.2
Fry, T.D.3
-
20
-
-
29444438437
-
Dynamic jobshop scheduling: A survey of simulation research
-
Ramasesh, R., Dynamic jobshop scheduling: A survey of simulation research. Omega, 1990, 16, 43-47.
-
(1990)
Omega
, vol.16
, pp. 43-47
-
-
Ramasesh, R.1
-
21
-
-
1442285828
-
Dynamic rescheduling that simultaneously considers efficiency and stability
-
Rangsaritratsamee, R., Ferrell, W.G. and Kurz, M.B., Dynamic rescheduling that simultaneously considers efficiency and stability. Comput. Ind. Engng, 2004, 46, 1-15.
-
(2004)
Comput. Ind. Engng
, vol.46
, pp. 1-15
-
-
Rangsaritratsamee, R.1
Ferrell, W.G.2
Kurz, M.B.3
-
22
-
-
0034659575
-
Dispatching rules for scheduling in assembly jobshops
-
Reeja, M.K. and Rajendran, C., Dispatching rules for scheduling in assembly jobshops. Int. J. Prod. Res., 2000, 38, 2051-2066.
-
(2000)
Int. J. Prod. Res.
, vol.38
, pp. 2051-2066
-
-
Reeja, M.K.1
Rajendran, C.2
-
23
-
-
84985747359
-
An evaluation of sequencing rules for an assembly shop
-
Russel, R.S. and Taylor, B.W. III, An evaluation of sequencing rules for an assembly shop. Decision Sci., 1985, 16, 196-212.
-
(1985)
Decision Sci.
, vol.16
, pp. 196-212
-
-
Russel, R.S.1
Iii, T.B.W.2
-
25
-
-
0344152920
-
Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
-
Thiagarajan, S. and Rajendran, C., Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs. Int. J. Prod. Res., 2003. 41, 4453-4486.
-
(2003)
Int. J. Prod. Res.
, vol.41
, pp. 4453-4486
-
-
Thiagarajan, S.1
Rajendran, C.2
|