메뉴 건너뛰기




Volumn 19, Issue 4, 2006, Pages 383-392

Dispatching rules for dynamic scheduling of one-of-a-kind production

Author keywords

Dispatching rule; Dynamic scheduling; Loading simulation; Multilevel routing structure; One of a kind production (OKP)

Indexed keywords

COMPUTER SIMULATION; OPERATIONS RESEARCH; PERFORMANCE; PRODUCTION ENGINEERING; SCHEDULING;

EID: 33646913024     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920500407541     Document Type: Article
Times cited : (37)

References (26)
  • 1
    • 0023418695 scopus 로고
    • Priority assignment procedures in multi-level assembly jobshops
    • Adam, N.R., Bertrand, J.W.M. and Surkis, J., Priority assignment procedures in multi-level assembly jobshops. IIE Trans., 1987, 19, 317-328.
    • (1987) IIE Trans. , vol.19 , pp. 317-328
    • Adam, N.R.1    Bertrand, J.W.M.2    Surkis, J.3
  • 2
    • 0027627910 scopus 로고
    • Due date assignment procedures with dynamically updated coefficients for multi-level assembly jobshops
    • Adam, N.R., Bertrand, J.W.M., Morehead, D.C. and Surkis, J., Due date assignment procedures with dynamically updated coefficients for multi-level assembly jobshops. Eur. J. Oper. Res., 1993, 68, 212-227.
    • (1993) Eur. J. Oper. Res. , vol.68 , pp. 212-227
    • Adam, N.R.1    Bertrand, J.W.M.2    Morehead, D.C.3    Surkis, J.4
  • 3
    • 0025694085 scopus 로고
    • Two new rules to minimize tardiness in a jobshop
    • Anderson, E.J. and Nyirendra, J.C., Two new rules to minimize tardiness in a jobshop. Int. J. Prod. Res., 1990, 28, 2277-2292.
    • (1990) Int. J. Prod. Res. , vol.28 , pp. 2277-2292
    • Anderson, E.J.1    Nyirendra, J.C.2
  • 4
    • 0038824809 scopus 로고    scopus 로고
    • An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function
    • Arakawa, M., Fuyuki, M. and Inoue, I., An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function. Int. J. Prod. Econ., 2003, 85, 359-369.
    • (2003) Int. J. Prod. Econ. , vol.85 , pp. 359-369
    • Arakawa, M.1    Fuyuki, M.2    Inoue, I.3
  • 6
    • 0020013653 scopus 로고
    • A state-of-the-art survey of dispatching rules for manufacturing job shop operations
    • Blackstone, J.H., Philips, D.T. and Hogg, G.L., A state-of-the-art survey of dispatching rules for manufacturing job shop operations. Int. J. Prod. Res., 1982, 20, 27-45.
    • (1982) Int. J. Prod. Res. , vol.20 , pp. 27-45
    • Blackstone, J.H.1    Philips, D.T.2    Hogg, G.L.3
  • 8
    • 0036574303 scopus 로고    scopus 로고
    • MES Architecture for FMS compatible to ERP
    • Choi, B.K. and Kim, B.H., MES Architecture for FMS compatible to ERP. IJCIM, 2002, 15, 274-284.
    • (2002) IJCIM , vol.15 , pp. 274-284
    • Choi, B.K.1    Kim, B.H.2
  • 9
    • 0001173522 scopus 로고
    • An experimental investigation of priority dispatching
    • Conway, R.W., Johnson, B.M., Maxwell, W.L., An experimental investigation of priority dispatching. J. Ind. Engng 1960, 11, 221-230.
    • (1960) J. Ind. Engng , vol.11 , pp. 221-230
    • Conway, R.W.1    Johnson, B.M.2    Maxwell, W.L.3
  • 10
    • 0001173515 scopus 로고
    • Priority dispatching and job lateness in a job shop
    • Conway, R.W., Priority dispatching and job lateness in a job shop. J. Ind. Engng, 1965, 16, 123-130.
    • (1965) J. Ind. Engng , vol.16 , pp. 123-130
    • Conway, R.W.1
  • 11
    • 34249973653 scopus 로고    scopus 로고
    • A survey of priority rule based scheduling
    • Haupt, R., A survey of priority rule based scheduling. OR Spectrum, 1998, 11, 3-16.
    • (1998) OR Spectrum , vol.11 , pp. 3-16
    • Haupt, R.1
  • 12
    • 0030782894 scopus 로고    scopus 로고
    • Efficient dispatching rules for scheduling in jobshop
    • Holthaus, O. and Rajendran, C., Efficient dispatching rules for scheduling in jobshop. Int. J. Prod. Econ., 1997, 48, 87-105.
    • (1997) Int. J. Prod. Econ. , vol.48 , pp. 87-105
    • Holthaus, O.1    Rajendran, C.2
  • 13
    • 0034161039 scopus 로고    scopus 로고
    • Efficient jobshop dispatching rules: Further developments
    • Holthaus, O. and Rajendran, C., Efficient jobshop dispatching rules: Further developments. Prod. Planning Control, 2000, 11, 171-178.
    • (2000) Prod. Planning Control , vol.11 , pp. 171-178
    • Holthaus, O.1    Rajendran, C.2
  • 14
    • 2042474752 scopus 로고    scopus 로고
    • Development and analysis of cost-based dispatching rule for job shop scheduling
    • Jayamohan, M.S., and Rajendran, C., Development and analysis of cost-based dispatching rule for job shop scheduling. Eur. J. Oper. Res., 2004, 157, 307-321.
    • (2004) Eur. J. Oper. Res. , vol.157 , pp. 307-321
    • Jayamohan, M.S.1    Rajendran, C.2
  • 15
    • 0034187609 scopus 로고    scopus 로고
    • Conceptual frame for development of optimized simulation-based scheduling systems
    • Jeong, K.Y., Conceptual frame for development of optimized simulation-based scheduling systems. Exp. Syst. Applic., 2000, 18, 299-306.
    • (2000) Exp. Syst. Applic. , vol.18 , pp. 299-306
    • Jeong, K.Y.1
  • 16
    • 33646942374 scopus 로고
    • Confidence intervals for steady state simulation
    • Law, A.M. and Kelton, W.D., Confidence intervals for steady state simulation. J. Op. Manage., 1984, 2, 167-176.
    • (1984) J. Op. Manage. , vol.2 , pp. 167-176
    • Law, A.M.1    Kelton, W.D.2
  • 17
    • 0011789253 scopus 로고
    • Priority dispatching and assembly operations in a jobshop
    • Maxwell, W.L., Priority dispatching and assembly operations in a jobshop. Rand Corporation Memorandum, 1969.
    • (1969) Rand Corporation Memorandum
    • Maxwell, W.L.1
  • 19
    • 0026140380 scopus 로고
    • A preliminary investigation of multiattribute based sequencing rules for assembly shops
    • Philipoom, P.R., Russel, R.S. and Fry, T.D., A preliminary investigation of multiattribute based sequencing rules for assembly shops. Int. J. Prod. Res., 29, 739-753.
    • (1929) Int. J. Prod. Res. , pp. 739-753
    • Philipoom, P.R.1    Russel, R.S.2    Fry, T.D.3
  • 20
    • 29444438437 scopus 로고
    • Dynamic jobshop scheduling: A survey of simulation research
    • Ramasesh, R., Dynamic jobshop scheduling: A survey of simulation research. Omega, 1990, 16, 43-47.
    • (1990) Omega , vol.16 , pp. 43-47
    • Ramasesh, R.1
  • 21
    • 1442285828 scopus 로고    scopus 로고
    • Dynamic rescheduling that simultaneously considers efficiency and stability
    • Rangsaritratsamee, R., Ferrell, W.G. and Kurz, M.B., Dynamic rescheduling that simultaneously considers efficiency and stability. Comput. Ind. Engng, 2004, 46, 1-15.
    • (2004) Comput. Ind. Engng , vol.46 , pp. 1-15
    • Rangsaritratsamee, R.1    Ferrell, W.G.2    Kurz, M.B.3
  • 22
    • 0034659575 scopus 로고    scopus 로고
    • Dispatching rules for scheduling in assembly jobshops
    • Reeja, M.K. and Rajendran, C., Dispatching rules for scheduling in assembly jobshops. Int. J. Prod. Res., 2000, 38, 2051-2066.
    • (2000) Int. J. Prod. Res. , vol.38 , pp. 2051-2066
    • Reeja, M.K.1    Rajendran, C.2
  • 23
    • 84985747359 scopus 로고
    • An evaluation of sequencing rules for an assembly shop
    • Russel, R.S. and Taylor, B.W. III, An evaluation of sequencing rules for an assembly shop. Decision Sci., 1985, 16, 196-212.
    • (1985) Decision Sci. , vol.16 , pp. 196-212
    • Russel, R.S.1    Iii, T.B.W.2
  • 25
    • 0344152920 scopus 로고    scopus 로고
    • Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
    • Thiagarajan, S. and Rajendran, C., Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs. Int. J. Prod. Res., 2003. 41, 4453-4486.
    • (2003) Int. J. Prod. Res. , vol.41 , pp. 4453-4486
    • Thiagarajan, S.1    Rajendran, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.