-
1
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation research
-
Ramasesh R (1990) Dynamic job shop scheduling: a survey of simulation research. OMEGA 18:43-56
-
(1990)
OMEGA
, vol.18
, pp. 43-56
-
-
Ramasesh, R.1
-
3
-
-
0020013653
-
A state of the art survey of dispatching rules for manufacturing job shop operations
-
Blackstone JH, Phillips DT, Hogg GL (1982) A state of the art survey of dispatching rules for manufacturing job shop operations. Int J Prod Res 20:27-45
-
(1982)
Int J Prod Res
, vol.20
, pp. 27-45
-
-
Blackstone, J.H.1
Phillips, D.T.2
Hogg, G.L.3
-
4
-
-
34249973653
-
A survey of priority rule based scheduling
-
Haupt R (1989) A survey of priority rule based scheduling. Oper Res Spectrum 11:3-16
-
(1989)
Oper Res Spectrum
, vol.11
, pp. 3-16
-
-
Haupt, R.1
-
5
-
-
0031076549
-
Improving job-shop performance by coordinating dispatching rules
-
Holthaus O, Ziegler H (1997) Improving job-shop performance by coordinating dispatching rules. Int J Prod Res 35:539-549
-
(1997)
Int J Prod Res
, vol.35
, pp. 539-549
-
-
Holthaus, O.1
Ziegler, H.2
-
6
-
-
0030782894
-
Efficient dispatching rules for scheduling in a job shop
-
Holthaus O, Rajendran C (1997) Efficient dispatching rules for scheduling in a job shop. Int J Prod Econ 48:87-105
-
(1997)
Int J Prod Econ
, vol.48
, pp. 87-105
-
-
Holthaus, O.1
Rajendran, C.2
-
7
-
-
0034161039
-
Efficient job-shop dispatching rules: Further developments
-
Holthaus O, Rajendran C (2000) Efficient job-shop dispatching rules: further developments. Prod Plan Control 11:171-178
-
(2000)
Prod Plan Control
, vol.11
, pp. 171-178
-
-
Holthaus, O.1
Rajendran, C.2
-
8
-
-
0037056089
-
A study on the performance of scheduling rules in buffer-constrained dynamic flowshops
-
Holthaus O, Rajendran C (2002) A study on the performance of scheduling rules in buffer-constrained dynamic flowshops. Int J Prod Res 40:3041-3052
-
(2002)
Int J Prod Res
, vol.40
, pp. 3041-3052
-
-
Holthaus, O.1
Rajendran, C.2
-
9
-
-
0034651053
-
New dispatching rules for job-shop scheduling: A step toward
-
Jayamohan MS, Rajendran C (2000) New dispatching rules for job-shop scheduling: a step toward. Int J Prod Res 38:563-586
-
(2000)
Int J Prod Res
, vol.38
, pp. 563-586
-
-
Jayamohan, M.S.1
Rajendran, C.2
-
10
-
-
0035883114
-
Sequencing CONWIP flow-shops: Analysis and heuristics
-
Framinan JM, Ruiz-Usano R, Leisten R (2001) Sequencing CONWIP flow-shops: analysis and heuristics. Int J Prod Res 39:2735-2749
-
(2001)
Int J Prod Res
, vol.39
, pp. 2735-2749
-
-
Framinan, J.M.1
Ruiz-Usano, R.2
Leisten, R.3
-
11
-
-
0023437076
-
A comparative analysis of the covert job sequencing rule using various shop performance measures
-
Russell RS, Dar-el EM, Taylor BW (1987) A comparative analysis of the covert job sequencing rule using various shop performance measures. Int J Prod Res 25:1523-1540
-
(1987)
Int J Prod Res
, vol.25
, pp. 1523-1540
-
-
Russell, R.S.1
Dar-El, E.M.2
Taylor, B.W.3
-
12
-
-
0001274658
-
Multiple factor rules for sequencing with assembly constraints
-
Maxwell WL, Mehra M (1968) Multiple factor rules for sequencing with assembly constraints Naval Res Logist Q 15:241-254
-
(1968)
Naval Res Logist Q
, vol.15
, pp. 241-254
-
-
Maxwell, W.L.1
Mehra, M.2
-
13
-
-
0011789253
-
Priority dispatching and assembly operation in a jobshop
-
RM-5370-PR
-
Maxwell WL (1969) Priority dispatching and assembly operation in a jobshop. Rand Corporation Memorandum, RM-5370-PR
-
(1969)
Rand Corporation Memorandum
-
-
Maxwell, W.L.1
-
14
-
-
0011727186
-
Priority dispatching rules in job shops with assembly operations and random delays
-
Sculli D (1980) Priority dispatching rules in job shops with assembly operations and random delays. OMEGA 8:227-234
-
(1980)
OMEGA
, vol.8
, pp. 227-234
-
-
Sculli, D.1
-
15
-
-
38149145323
-
Priority dispatching rules in an assembly job shop
-
Sculli D (1987) Priority dispatching rules in an assembly job shop. OMEGA 15:49-57
-
(1987)
OMEGA
, vol.15
, pp. 49-57
-
-
Sculli, D.1
-
16
-
-
0040857316
-
MRP yesterday, today and tomorrow
-
Third Q
-
Plossl GW (1980) MRP yesterday, today and tomorrow. Prod Inv Manage, Third Q pp 1-10
-
(1980)
Prod Inv Manage
, pp. 1-10
-
-
Plossl, G.W.1
-
17
-
-
38249004133
-
Sequencing rules, progress milestones and product structure in multistage job shop
-
Philipoom PR, Markland RE, Fry TD (1989) Sequencing rules, progress milestones and product structure in multistage job shop. J Oper Manage 8:209-229
-
(1989)
J Oper Manage
, vol.8
, pp. 209-229
-
-
Philipoom, P.R.1
Markland, R.E.2
Fry, T.D.3
-
18
-
-
84985747359
-
An evaluation of sequencing rules for an assembly shop
-
Russell RS, Taylor BW (1985) An evaluation of sequencing rules for an assembly shop, Dec Sci 16:196-212
-
(1985)
Dec Sci
, vol.16
, pp. 196-212
-
-
Russell, R.S.1
Taylor, B.W.2
-
19
-
-
84989446840
-
Operating policies for scheduling assembled products
-
Goodwin JS, Goodwill JC (1982) Operating policies for scheduling assembled products. Decis Sci 13:585-603
-
(1982)
Decis Sci
, vol.13
, pp. 585-603
-
-
Goodwin, J.S.1
Goodwill, J.C.2
-
20
-
-
0023418695
-
Priority assignment procedures in multi-level assembly job shops
-
Adam NR, Bertrand JWM, Surkis J (1987) Priority assignment procedures in multi-level assembly job shops. HE Trans 19:317-328
-
(1987)
HE Trans
, vol.19
, pp. 317-328
-
-
Adam, N.R.1
Bertrand, J.W.M.2
Surkis, J.3
-
21
-
-
0024641735
-
The effects of product structure and sequencing rule on assembly shop performance
-
Fry TD, Oliff MD, Minor ED, Leong OK (1989) The effects of product structure and sequencing rule on assembly shop performance. Int J Prod Res 27:671-686
-
(1989)
Int J Prod Res
, vol.27
, pp. 671-686
-
-
Fry, T.D.1
Oliff, M.D.2
Minor, E.D.3
Leong, O.K.4
-
22
-
-
0026140380
-
A preliminary investigation of multi-attribute based sequencing rules for assembly shops
-
Philipoom PR, Russell RS, Fry TD (1991) A preliminary investigation of multi-attribute based sequencing rules for assembly shops. Int J Prod Res 4:739-753
-
(1991)
Int J Prod Res
, vol.4
, pp. 739-753
-
-
Philipoom, P.R.1
Russell, R.S.2
Fry, T.D.3
-
23
-
-
0001173515
-
Priority dispatching and job lateness in a job shop
-
Conway RW (1965) Priority dispatching and job lateness in a job shop. J Ind Eng 16:228-237
-
(1965)
J Ind Eng
, vol.16
, pp. 228-237
-
-
Conway, R.W.1
-
24
-
-
0023399009
-
Priority rules for job shops with weighted tardiness costs
-
Vepsalainen APJ, Morton TE (1987) Priority rules for job shops with weighted tardiness costs. Manage Sci 33:1035-1047
-
(1987)
Manage Sci
, vol.33
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
|