메뉴 건너뛰기




Volumn 43, Issue 5, 2012, Pages 47-67

Project management knowledge and effects on construction project outcomes: An empirical study

Author keywords

construction engineering; customer satisfaction; perceived performance; PMBOK Guide; project success; structural equation model

Indexed keywords


EID: 84866675882     PISSN: 87569728     EISSN: 19389507     Source Type: Journal    
DOI: 10.1002/pmj.21293     Document Type: Article
Times cited : (75)

References (43)
  • 1
  • 2
    • 70549098765 scopus 로고    scopus 로고
    • The role of technology in the project manager performance model
    • doi: 10.1002/pmj.20038
    • Anantatmula, V. S., (2008). The role of technology in the project manager performance model. Project Management Journal, 39 (1), 34-48. doi: 10.1002/pmj.20038
    • (2008) Project Management Journal , vol.39 , Issue.1 , pp. 34-48
    • Anantatmula, V.S.1
  • 3
    • 0041942972 scopus 로고    scopus 로고
    • Foundations of the American customer satisfaction index
    • Anderson, E. W., &, Fornell, C., (2000). Foundations of the American customer satisfaction index. Total Quality Management, 11 (7), 869-882.
    • (2000) Total Quality Management , vol.11 , Issue.7 , pp. 869-882
    • Anderson, E.W.1    Fornell, C.2
  • 5
    • 53549098221 scopus 로고    scopus 로고
    • Decision support systems unfrastructure: The root problems of the management of changing IT
    • Benamati, J. S., &, Lederer, A. L., (2008). Decision support systems unfrastructure: The root problems of the management of changing IT. Decision Support Systems, 45 (4), 833-844.
    • (2008) Decision Support Systems , vol.45 , Issue.4 , pp. 833-844
    • Benamati, J.S.1    Lederer, A.L.2
  • 6
    • 70350327891 scopus 로고    scopus 로고
    • Project management priorities and the link with performance management systems
    • doi: 10.1002/pmj.20014
    • Bryde, D. J., &, Wright, G. H., (2007). Project management priorities and the link with performance management systems. Project Management Journal, 38 (4), 5-11. doi: 10.1002/pmj.20014
    • (2007) Project Management Journal , vol.38 , Issue.4 , pp. 5-11
    • Bryde, D.J.1    Wright, G.H.2
  • 7
    • 40949141001 scopus 로고    scopus 로고
    • Investigating structural relationships between service quality, perceived value, satisfaction, and behavioral intentions for air passengers: Evidence from Taiwan
    • Chen, C.-F., (2008). Investigating structural relationships between service quality, perceived value, satisfaction, and behavioral intentions for air passengers: Evidence from Taiwan. Transportation Research Part A: Policy and Practice, 42 (4), 709-717.
    • (2008) Transportation Research Part A: Policy and Practice , vol.42 , Issue.4 , pp. 709-717
    • Chen, C.-F.1
  • 8
    • 67349251176 scopus 로고    scopus 로고
    • Effect of project characteristics on project performance in construction projects based on structural equation model
    • Cho, K., Hong, T., &, Hyun, C., (2009). Effect of project characteristics on project performance in construction projects based on structural equation model. Expert Systems with Applications, 36 (7), 10461-10470.
    • (2009) Expert Systems with Applications , vol.36 , Issue.7 , pp. 10461-10470
    • Cho, K.1    Hong, T.2    Hyun, C.3
  • 9
    • 79952043524 scopus 로고    scopus 로고
    • Deploying effective service strategy in the operations stage of high-speed rail
    • doi: 10.1016/j.tre.2010.12.004
    • Chou, J.-S., Kim, C., Kuo, Y.-C., &, Ou, N.-C., (2011). Deploying effective service strategy in the operations stage of high-speed rail. Transportation Research Part E: Logistics and Transportation Review, 47 (4), 507-519. doi: 10.1016/j.tre.2010.12.004
    • (2011) Transportation Research Part E: Logistics and Transportation Review , vol.47 , Issue.4 , pp. 507-519
    • Chou, J.-S.1    Kim, C.2    Kuo, Y.-C.3    Ou, N.-C.4
  • 10
    • 54249095612 scopus 로고    scopus 로고
    • Analyzing enterprise resource planning system implementation success factors in the engineering-construction industry
    • Chung, B. Y., Skibniewski, M. J., Lucas, H. C., Jr., &, Kwak, Y. H., (2008). Analyzing enterprise resource planning system implementation success factors in the engineering-construction industry. Journal of Computing in Civil Engineering, 22 (6), 373-382.
    • (2008) Journal of Computing in Civil Engineering , vol.22 , Issue.6 , pp. 373-382
    • Chung, B.Y.1    Skibniewski, M.J.2    Lucas, Jr.H.C.3    Kwak, Y.H.4
  • 11
    • 84866637549 scopus 로고    scopus 로고
    • Construction Industry Institute. Austin, TX: Author.
    • Construction Industry Institute. (2009). CII benchmarking measurement categories. Austin, TX: Author.
    • (2009) CII Benchmarking Measurement Categories
  • 12
    • 33845945922 scopus 로고
    • Coefficient alpha and the internal structure of tests
    • Cronbach, L. J., (1951). Coefficient alpha and the internal structure of tests. Psychometrika, 16 (3), 297-334.
    • (1951) Psychometrika , vol.16 , Issue.3 , pp. 297-334
    • Cronbach, L.J.1
  • 13
    • 0037294151 scopus 로고    scopus 로고
    • An empirical analysis of the relationship between project planning and project success
    • DOI 10.1016/S0263-7863(02)00012-1, PII S0263786302000121
    • Dvir, D., Raz, T., &, Shenhar, A. J., (2003). An empirical analysis of the relationship between project planning and project success. International Journal of Project Management, 21 (2), 89-95. (Pubitemid 36036623)
    • (2003) International Journal of Project Management , vol.21 , Issue.2 , pp. 89-95
    • Dvir, D.1    Raz, T.2    Shenhar, A.J.3
  • 14
    • 0000009769 scopus 로고
    • Evaluating structural equations models with unobservable variables and measurement error
    • Fornell, C., &, Larcker, D. F., (1981). Evaluating structural equations models with unobservable variables and measurement error. Journal of Marketing Research, 18 (1), 39-50.
    • (1981) Journal of Marketing Research , vol.18 , Issue.1 , pp. 39-50
    • Fornell, C.1    Larcker, D.F.2
  • 15
    • 0030518346 scopus 로고    scopus 로고
    • The American customer satisfaction index: Nature, purpose, and findings
    • Fornell, C., Johnson, M. D., Anderson, E. W., Cha, J., &, Bryant, B. E., (1996). The American customer satisfaction index: Nature, purpose, and findings. Journal of Marketing, 60 (4), 7-18.
    • (1996) Journal of Marketing , vol.60 , Issue.4 , pp. 7-18
    • Fornell, C.1    Johnson, M.D.2    Anderson, E.W.3    Cha, J.4    Bryant, B.E.5
  • 16
    • 84866659667 scopus 로고    scopus 로고
    • Project management theory and practice
    • doi: 10.1002/pmj.20217
    • Frame, J. D., (2010). Project management theory and practice. Project Management Journal, 41 (5), 87. doi: 10.1002/pmj.20217
    • (2010) Project Management Journal , vol.41 , Issue.5 , pp. 87
    • Frame, J.D.1
  • 19
    • 67650706330 scopus 로고    scopus 로고
    • Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives
    • Hu, L., &, Bentler, P.M., (1999). Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives. Structural Equation Modeling: A Multidisciplinary Journal, 6 (1), 1-55.
    • (1999) Structural Equation Modeling: A Multidisciplinary Journal , vol.6 , Issue.1 , pp. 1-55
    • Hu, L.1    Bentler, P.M.2
  • 21
    • 77049091120 scopus 로고    scopus 로고
    • Performance metric development for pharmaceutical construction projects
    • doi: 10.1016/j.ijproman.2009.06.004
    • Hwang, B.-G., Thomas, S. R., &, Caldas, C. H., (2010). Performance metric development for pharmaceutical construction projects. International Journal of Project Management, 28 (3), 265-274. doi: 10.1016/j.ijproman.2009.06. 004
    • (2010) International Journal of Project Management , vol.28 , Issue.3 , pp. 265-274
    • Hwang, B.-G.1    Thomas, S.R.2    Caldas, C.H.3
  • 22
    • 84855289034 scopus 로고    scopus 로고
    • Application of customized industry-specific metrics to assessment of capital projects performances
    • doi: 10.1007/s12205-012-1352-8
    • Hwang, B.-G., Thomas, S. R., &, Caldas, C. H., (2011). Application of customized industry-specific metrics to assessment of capital projects performances. KSCE Journal of Civil Engineering. doi: 10.1007/s12205-012-1352-8
    • (2011) KSCE Journal of Civil Engineering
    • Hwang, B.-G.1    Thomas, S.R.2    Caldas, C.H.3
  • 23
    • 58049139009 scopus 로고    scopus 로고
    • A guide to the project management body of knowledge (PMBOK® Guide), fourth edition
    • doi: 10.1002/pmj.20125
    • Indelicato, G., (2009). A guide to the project management body of knowledge (PMBOK® Guide), fourth edition. Project Management Journal, 40 (2), 104. doi: 10.1002/pmj.20125
    • (2009) Project Management Journal , vol.40 , Issue.2 , pp. 104
    • Indelicato, G.1
  • 26
    • 56349120726 scopus 로고    scopus 로고
    • Structuring the prediction model of project performance for international construction projects: A comparative analysis
    • Kim, D. Y., Han, S. H., Kim, H., &, Park, H., (2009). Structuring the prediction model of project performance for international construction projects: A comparative analysis. Expert Systems with Applications, 36 (2, Part 1), 1961-1971.
    • (2009) Expert Systems with Applications , vol.36 , Issue.2 PART 1 , pp. 1961-1971
    • Kim, D.Y.1    Han, S.H.2    Kim, H.3    Park, H.4
  • 29
    • 2342427035 scopus 로고    scopus 로고
    • Measuring construction project participant satisfaction
    • DOI 10.1080/01446190320000000000
    • Leung, M.-Y., Ng, S. T., &, Cheung, S.-O., (2004). Measuring construction project participant satisfaction. Construction Management and Economics, 22 (3), 319-331. (Pubitemid 38562536)
    • (2004) Construction Management and Economics , vol.22 , Issue.3 , pp. 319-331
    • Leung, M.-Y.1    Ng, S.T.2    Cheung, S.-O.3
  • 30
    • 30844439150 scopus 로고    scopus 로고
    • Determinants of international architectural, engineering, and construction firms' project success in China
    • DOI 10.1061/(ASCE)0733-9364(2006)132:2(206)
    • Ling, F. Y. Y., Ibbs, C. W., &, Hoo, W. Y., (2006). Determinants of international architectural, engineering, and construction firms' project success in China. Journal of Construction Engineering and Management, 132 (2), 206-214. (Pubitemid 43107219)
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.2 , pp. 206-214
    • Ling, F.Y.Y.1    Ibbs, C.W.2    Hoo, W.Y.3
  • 31
    • 56349150949 scopus 로고    scopus 로고
    • Models for predicting project performance in China using project management practices adopted by foreign AEC firms
    • Ling, F. Y. Y., Low, S. P., Wang, S., &, Egbelakin, T., (2008). Models for predicting project performance in China using project management practices adopted by foreign AEC firms. Journal of Construction Engineering and Management, 134 (12), 983-990.
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.12 , pp. 983-990
    • Ling, F.Y.Y.1    Low, S.P.2    Wang, S.3    Egbelakin, T.4
  • 32
    • 84856450573 scopus 로고    scopus 로고
    • Relationships between leadership and success in different types of project complexities
    • Muller, R., Geraldi, J., &, Turner, J. R., (2011). Relationships between leadership and success in different types of project complexities. IEEE Transactions on Engineering Management, 59 (1), 77-90.
    • (2011) IEEE Transactions on Engineering Management , vol.59 , Issue.1 , pp. 77-90
    • Muller, R.1    Geraldi, J.2    Turner, J.R.3
  • 33
    • 13944258129 scopus 로고    scopus 로고
    • Project performance versus use of technologies at project and phase levels
    • DOI 10.1061/(ASCE)0733-9364(2004)130:3(322)
    • O'Connor, J. T., &, Yang, L.-R., (2004). Project performance versus use of technologies at project and phase levels. Journal of Construction Engineering and Management, 130 (3), 322-329. (Pubitemid 40265364)
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.3 , pp. 322-329
    • O'Connor, J.T.1    Yang, L.-R.2
  • 34
    • 84855983657 scopus 로고    scopus 로고
    • Project Management Institute (PMI). (4th ed.). Newtown Square, PA: Author.
    • Project Management Institute (PMI). (2008). A guide to the project management body of knowledge (4th ed.). Newtown Square, PA: Author.
    • (2008) A Guide to the Project Management Body of Knowledge
  • 36
    • 85121853489 scopus 로고
    • The measurement of information systems effectiveness: Evaluating a measuring instrument
    • Paper presented at the
    • Scott, J. E., (1994). The measurement of information systems effectiveness: Evaluating a measuring instrument. Paper presented at the Fifteeth International Conference on Information Systems, Vancouver, BC.
    • (1994) Fifteeth International Conference on Information Systems, Vancouver, BC
    • Scott, J.E.1
  • 37
    • 56349104696 scopus 로고    scopus 로고
    • Structural equation model for effective CRM of information infrastructure industry in Korea
    • Shin, S. Y., Moon, T. H., &, Sohn, S. Y., (2009). Structural equation model for effective CRM of information infrastructure industry in Korea. Expert Systems with Applications, 36 (2, Part 1), 1695-1705.
    • (2009) Expert Systems with Applications , vol.36 , Issue.2 PART 1 , pp. 1695-1705
    • Shin, S.Y.1    Moon, T.H.2    Sohn, S.Y.3
  • 38
    • 68549121138 scopus 로고    scopus 로고
    • User and developer common knowledge: Effect on the success of information system development projects
    • Tesch, D., Sobol, M. G., Klein, G., &, Jiang, J. J., (2009). User and developer common knowledge: Effect on the success of information system development projects. International Journal of Project Management, 27 (7), 657-664.
    • (2009) International Journal of Project Management , vol.27 , Issue.7 , pp. 657-664
    • Tesch, D.1    Sobol, M.G.2    Klein, G.3    Jiang, J.J.4
  • 39
    • 33845228403 scopus 로고    scopus 로고
    • Job characteristics, motivators and stress among information technology consultants: A structural equation modeling approach
    • DOI 10.1016/j.ergon.2006.10.005, PII S0169814106001995
    • Wallgren, L. G., &, Hanse, J. J., (2007). Job characteristics, motivators and stress among information technology consultants: A structural equation modeling approach. International Journal of Industrial Ergonomics, 37 (1), 51-59. (Pubitemid 44854290)
    • (2007) International Journal of Industrial Ergonomics , vol.37 , Issue.1 , pp. 51-59
    • Wallgren, L.G.1    Hanse, J.J.2
  • 40
    • 35348902485 scopus 로고    scopus 로고
    • Exploring the links between technology usage and project outcomes
    • DOI 10.1080/01446190701598657, PII 782994189
    • Yang, L.-R., (2007). Exploring the links between technology usage and project outcomes. Construction Management and Economics, 25 (10), 1041-1051. (Pubitemid 47593430)
    • (2007) Construction Management and Economics , vol.25 , Issue.10 , pp. 1041-1051
    • Yang, L.-R.1
  • 41
    • 32644481390 scopus 로고    scopus 로고
    • Technology utilization on different sizes of projects and associated impacts on composite project success
    • DOI 10.1016/j.ijproman.2005.06.008, PII S0263786305000761
    • Yang, L.-R., O'Connor, J. T., &, Wang, C.-C., (2006). Technology utilization on different sizes of projects and associated impacts on composite project success. International Journal of Project Management, 24 (2), 96-105. (Pubitemid 43246165)
    • (2006) International Journal of Project Management , vol.24 , Issue.2 , pp. 96-105
    • Yang, L.-R.1    O'Connor, J.T.2    Wang, C.-C.3
  • 42
    • 62549151788 scopus 로고    scopus 로고
    • Developing a performance index for relationship-based construction projects in Australia: Delphi study
    • Yeung, J. F. Y., Chan, A. P. C., &, Chan, D. W. M., (2009). Developing a performance index for relationship-based construction projects in Australia: Delphi study. Journal of Management in Engineering, 25 (2), 59-68.
    • (2009) Journal of Management in Engineering , vol.25 , Issue.2 , pp. 59-68
    • Yeung, J.F.Y.1    Chan, A.P.C.2    Chan, D.W.M.3
  • 43
    • 84866650056 scopus 로고    scopus 로고
    • The relative importance of the PMBOK® Guide's nine Knowledge Areas during project planning
    • doi: 10.1002/pmj.20116
    • Zwikael, O., (2009). The relative importance of the PMBOK® Guide's nine Knowledge Areas during project planning. Project Management Journal, 40 (4), 94-103. doi: 10.1002/pmj.20116
    • (2009) Project Management Journal , vol.40 , Issue.4 , pp. 94-103
    • Zwikael, O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.