메뉴 건너뛰기




Volumn 36, Issue 7, 2009, Pages 10461-10470

Effect of project characteristics on project performance in construction projects based on structural equation model

Author keywords

Project characteristics; Project performance; Structural equation model

Indexed keywords

CAUSAL RELATIONSHIPS; CONSTRUCTION PROJECTS; DECISION-MAKING PROCESS; FACTOR ANALYSIS METHODS; PLANNING STAGES; PROJECT CHARACTERISTICS; PROJECT PERFORMANCE; QUALITATIVE DATUM; QUANTITATIVE DATUM; RESEARCH METHODOLOGIES; SEM; SEM STUDIES; STRUCTURAL EQUATION MODEL;

EID: 67349251176     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2009.01.032     Document Type: Article
Times cited : (144)

References (18)
  • 3
    • 67349276005 scopus 로고
    • Sage, Thousand Oaks, CA
    • Byrne B. Structural equation modeling with EQS and EQS/windows: Basic concepts. Applications and programming (1994), Sage, Thousand Oaks, CA
    • (1994) Applications and programming
    • Byrne, B.1
  • 4
    • 23044469895 scopus 로고    scopus 로고
    • A hierarchical structural model of assessing innovation and project performance
    • Dulaimi F., Nepal M., and Park M. A hierarchical structural model of assessing innovation and project performance. Construction Management and Economics 23 (2005) 565-577
    • (2005) Construction Management and Economics , vol.23 , pp. 565-577
    • Dulaimi, F.1    Nepal, M.2    Park, M.3
  • 6
    • 15744362051 scopus 로고    scopus 로고
    • Structural equation model of project planning effectiveness
    • Islam M., and Faniran O. Structural equation model of project planning effectiveness. Construction Management and Economics 23 (2005) 215-223
    • (2005) Construction Management and Economics , vol.23 , pp. 215-223
    • Islam, M.1    Faniran, O.2
  • 7
    • 0039997969 scopus 로고    scopus 로고
    • Factor influencing construction time and cost overruns on high-rise project in Indonesia
    • Kaming P., Olomolaiye P., Holt G., and Harris F. Factor influencing construction time and cost overruns on high-rise project in Indonesia. Construction Management and Economics 15 (1997) 83-94
    • (1997) Construction Management and Economics , vol.15 , pp. 83-94
    • Kaming, P.1    Olomolaiye, P.2    Holt, G.3    Harris, F.4
  • 10
    • 0004251792 scopus 로고
    • The science of muddling through
    • Faludi A. (Ed), Pergamon Press, Oxford
    • Lindblom C. The science of muddling through. In: Faludi A. (Ed). Readers in planning theory (1978), Pergamon Press, Oxford
    • (1978) Readers in planning theory
    • Lindblom, C.1
  • 14
    • 0002344077 scopus 로고
    • Reliability: A review of psychometric basics and recent marketing practices
    • Peter J. Reliability: A review of psychometric basics and recent marketing practices. Journal of Marketing Research 16 1 (1979) 6-17
    • (1979) Journal of Marketing Research , vol.16 , Issue.1 , pp. 6-17
    • Peter, J.1
  • 15
    • 0001971689 scopus 로고    scopus 로고
    • The strategic role of relational bonding in inter-organizational collaborations: An empirical study of the global construction industry
    • Sarker M., Aulakh P., and Cavusgil S. The strategic role of relational bonding in inter-organizational collaborations: An empirical study of the global construction industry. Journal of International Management 4 2 (1998) 415-421
    • (1998) Journal of International Management , vol.4 , Issue.2 , pp. 415-421
    • Sarker, M.1    Aulakh, P.2    Cavusgil, S.3
  • 18
    • 15944372664 scopus 로고    scopus 로고
    • Structural equation model of trust and partnering success
    • Wong P., and Cheung S. Structural equation model of trust and partnering success. Journal of Management in Engineering, ASCE 21 2 (2005) 70-80
    • (2005) Journal of Management in Engineering, ASCE , vol.21 , Issue.2 , pp. 70-80
    • Wong, P.1    Cheung, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.